Silvercorp Metals Inc.

SVM·SVM·$13.06·$2B cap
Silveralso:Ying Mining District, Henan Province Map

Silvercorp Metals is China's largest primary silver producer, operating seven underground silver-lead-zinc mines (SGX, HZG, HPG, TLP, LME, LMW, DCG) plus two processing plants across its Ying Mining District in Henan Province, and the newer GC silver-lead-zinc mine in Guangdong Province. The company is also developing the El Domo copper-gold project in Ecuador, with production planned to start in 2026, and holds a substantial cash balance funding continued exploration and district expansion.

Notable vs. Peers

  • Jurisdiction risk score of 4/10 is meaningfully riskier than the peer average of 7/10.
  • All-in sustaining cost of $18.38/AgEq oz is 44% lower than the peer producer average of $33.00/AgEq oz.

Lifecycle Milestones

Grassroots
Resource Def.
PEA
PFS
Feasibility
Permitting
Construction
ProductionCurrent

Construction Milestones

5 of 5 reached
  1. Reached — date not disclosed · GC Mine's mining license (No. C1000002010113210083333) is valid from June 2012 to November 2040 per Silvercorp's own project page. Exact day within June 2012 not confirmed from available sourcing -- recorded reached-but-undated. · Source
  2. Reached — date not disclosed · Task #922: written as a real, undated MinerConstructionMilestone row (achievedDate intentionally null). Silvercorp Metals' GC Mine (Guangdong, China) demonstrably reached a construction decision: contractors were mobilised August 2011 ahead of a mining licence valid from June 2012, and the mine has produced since 2014. Consolidating this miner's own constructionMilestone:CONSTRUCTION_DECISION MetricStatus research (Task #672 re-check, which also tested and eliminated El Domo-Curipamba, Ecuador, as the stronger-looking alternative anchor -- rejected because its authorising event was a government Resolution of Change of Phase, not a Silvercorp board FID): no dated FID was found in the Task #430 batch 7 pass for the GC Mine either, across two independent research passes. Recorded as reached-but-undated rather than promoting a government regulatory approval into a company construction decision.
  3. Reached — date not disclosed · Mine-construction contractors mobilized to the GC Mine site in August 2011 and began work on the main access ramp and main shaft (2,224m ramp / 618m shaft planned; by 31 Dec 2011, 564m of ramp and 22m of shaft were complete, per Silvercorp's own fiscal-2012 6-K operational update), following the Dec 2010 mining permit and the site-preparation/surface-rights phase described in Silvercorp's fiscal-2011 filings. Exact day within August 2011 not found. CAVEAT: sec.gov 403's on every direct fetch attempt (same bot-wall this project has hit before, e.g. Task #612's HL row); sourced via search-summarized SEC 6-K filings, corroborated across two independently-worded queries returning the same August 2011 mobilization date and the same Dec-2011 progress figures. · Source
  4. Reached — date not disclosed · GC Mine 'has been in production since 2014' per Silvercorp's own project page. Exact day not confirmed from available sourcing -- recorded reached-but-undated. (Chosen as the anchor asset for SVM's stage=PRODUCTION claim because it has a dateable mining-license/production history; the Ying Mining District's constituent mines (SGX/HPG/TLP/LM), in production since 2006 per the district overview page, had no comparably dateable permit/construction history reachable this research pass.) · Source
  5. Reached — date not disclosed · Genuinely reached, but no single company-wide commercial-production date exists: the Ying Mining District (Henan Province, China) comprises multiple individual mines (SGX, HZG, LM, HPG, TLP) brought into production at different times over roughly two decades of continuous operation, while El Domo (Ecuador) remains under construction (construction camp substantially completed, targeting operational readiness around October 2025/2026 -- not yet producing). Q2 FY2026 results reported Ying District production of 265,002 tonnes processed, ~1,529 koz silver, 2,085 oz gold. This row was missing entirely prior to 2026-08-21 -- a genuine data gap, not a stage error; Miner.stage was already correctly PRODUCTION. · Source

Milestones are recorded only from a company's own dated disclosure. A milestone with no date shown is one we can confirm was reached but for which no date was disclosed — we don't estimate one. "Not yet reached" means exactly that, not that a date is missing. An "Expected" line likewise only ever reflects the company's own guidance (e.g. a study or permit decision targeted for a stated quarter) — most not-yet-reached milestones have none, and that absence means no such guidance has been disclosed, not that one is overdue.

10/10
Weak track recordStrong track record
8.5/10
Thin runwayWell-capitalized
4/10
High riskLow risk
How this is calculated
9.4/10
Weaker depositStronger deposit
8/10
Weaker profileStronger profile
Price Chart
$4.46$6.65$13.32$10.67$13.06AugNovMarJunSep
Aug 12, 2025Sep 4, 2026
News
$13.06
+171.5%from low-16.5%from high
$4.81$15.64
See who ↓
3.8%
Low alignmentHigh alignment
See who ↓
36%
Low alignmentHigh alignment
$2B
Far belowFar above
$465.2M median
Price (USD - Local)
$13.06 - CAD 18.08
Cash Position (USD)
$422M
Far belowFar above
$75.5M median
Debt (USD)
$118.4M
Far aboveFar below
$7.5M median
$1.7B
Far belowFar above
$363.9M median
221.2M
Far aboveFar below
322.5M median
Jurisdiction
China
198,000,000 oz
Far belowFar above
47.1M median
$8.80/oz
Far aboveFar below
$5.38/oz median
This company's data hasn't been researched yet
Underground
17 yrs
Far belowFar above
10 yrs median
$18.38/AgEq oz
@5%$1B(at $28.00/oz)
Far belowFar above
$396M median
1.99x
Far aboveFar below
0.91x median
This company's data hasn't been researched yet
Not enough peer data yet
$28.00/oz58% below spot ($66.98/oz)
This company's data hasn't been researched yet
3.8%
0%100%
13% median
36%
0%100%
7.2% median
$219.1M
Far belowFar above
$44.5M median
$0.99
Far belowFar above
$0.103 median
9.34x
Far aboveFar below
41.48x median
This company's data hasn't been researched yet
This company's data hasn't been researched yet
Acquisition Susceptibility
5/10
Unlikely bolt-onFits the takeout profile

A relative ranking of how closely this company matches the profile of juniors that have actually been acquired — not a probability, and not a reason to buy. Acquisitions are rare: only a few dozen significant deals happen a year across a universe of thousands of juniors, so even a high score here describes a long shot. The strongest signal the underlying research identifies — whether a major already holds a JV, earn-in, or 5–19.9% strategic stake — isn't tracked yet and is absent from this score.

Overall Score Trend
+27% since 2026-08-01

Your Rankings

Community Sentiment
SELLINGBUYING
CategoryCommunityYour Ranking
Overall (0)Log in to rank
Management (0)Log in to rank
Financials (0)Log in to rank
Jurisdiction (0)Log in to rank
Project Quality (0)Log in to rank

Management Team

Chairman and Chief Executive Officer of Silvercorp Metals Inc., which he founded in 2003. Served as CEO Sep 2003-Oct 2013, transforming Silvercorp from a small Canadian junior exploration company into a successful, low-cost, mid-tier silver producer with multiple mines in China; re-appointed CEO Dec 2014. B.Sc./M.Sc. (Geology, China); Ph.D. (Geological Sciences), University of Saskatchewan (1992); NSERC Post-Doctoral fellowship. Publicly credited with being integral to the 2002 discovery of Jinshan Gold's CSH Gold Mine (Inner Mongolia, later part of China Gold International) prior to founding Silvercorp -- real per Silvercorp's own leadership materials, but the employer/dates/outcome chain was not confirmed to a primary-source standard this pass, so not separately scored. Also founder and Chairman/CEO of New Pacific Metals Corp. and Auro Metals Inc. (concurrent/ongoing roles, not scored).

President of Silvercorp Metals Inc. since 2023, joined the Company in Aug 2018 responsible for investor relations and corporate development. BComm (Finance major), Concordia University; CFA charterholder. 25+ years of capital-markets and corporate-finance experience, mainly mining-focused: investment banking with Raymond James and Merrill Lynch, beginning in equity research; earlier CFO roles at a publicly listed mining company and a private technology company; consulting/advisory work in the resource sector immediately before Silvercorp. Also a director of Auro Metals, Inc. (since 2026) and Omai Gold Mines Corp. (since 2020, already tracked in this DB).

Interim Chief Financial Officer of Silvercorp Metals Inc., appointed effective immediately upon Derek Liu's retirement (announced Nov 2025). Has been with the Company since 2024, most recently as CFO of the Company's China Operations. Bachelor's degree, Shanghai International Studies University; Master of Management, University of International Business and Economics; CPA (CPA Australia). 15+ years in corporate finance, accounting, financial reporting, treasury planning and internal controls. Career: began as an Auditor with PricewaterhouseCoopers LLP; Head of Finance and CFO, Asurion China, immediately before Silvercorp.

Insiders, Investors & Smart Money

Notable shareholders and insiders whose involvement is worth knowing about, plus what we're seeing from institutional/large-investor activity.

Smart money
1/10

No producer, strategic investor, or actively-managed specialist fund holds a disclosed stake -- only passive silver/gold-sector ETFs. Five different insiders sold stock on the open market over the past year, and not a single insider bought -- a real, notable negative signal, not a data gap.

No notable insiders tracked for this miner yet.

Reports, Presentations & Documents

Technical Report Takeaways

Ying Mining District (Henan Province, China; seven underground mines -- SGX, HZG, HPG, TLP, LME, LMW, DCG -- plus the KP mine start-up), Silvercorp's flagship and largest operation. NI 43-101 Technical Report Update, prepared by AMC Mining Consultants (Canada) Ltd., Mineral Reserve/Resource effective 31 Dec 2025, announced 12 Jun 2026. Proven+Probable Reserves: 19.08 Mt at 174 g/t Ag / 2.47% Pb / 0.80% Zn / containing 106.5 Moz Ag (+20% y/y), 472.1 kt Pb, 150.2 kt Zn -- supports a 17-year mine life (through 2042), ~106 Moz AgEq/yr average LOM production. Measured+Indicated Resources (inclusive of reserves): 42.18 Mt at 146 g/t Ag containing 198 Moz Ag, 231 koz Au, 944 kt Pb, 284 kt Zn -- this is the figure written to ouncesFound (M+I convention). Economics at long-term prices of $28/oz Ag, $2,800/oz Au, $0.90/lb Pb, $1.20/lb Zn, $4.40/lb Cu: pre-tax NPV5%=US$1,275M, post-tax NPV5%=US$1,030M (written to dcfNpvUsd -- after-tax per repo convention). No IRR figure was disclosed in the release or its SEC 6-K exhibit -- left null, checked gap. Silvercorp also operates the GC Mine (Guangdong Province, Ag-Pb-Zn), a distinct, separately-studied deposit: 23 Jun 2026 update reports M&I Resources of 18.3 Mt at 65 g/t Ag (38.3 Moz Ag) and P&P Reserves of 6.19 Mt at 63 g/t Ag/0.91% Pb/2.23% Zn, plus 7.36 Mt Inferred at 75 g/t Ag -- but no NPV/IRR/mine-life was found for GC Mine this pass, and per the playbook's multi-project rule its ounces are NOT summed into Ying's M+I figure above (different technical reports, avoiding an implied single consolidated resource neither document supports). GC Mine's own ouncesFound-equivalent (38.3 Moz Ag M+I) is left out of the structured field, flagged here for a future pass.