Aris Mining Corporation
Aris Mining operates the underground Segovia and Marmato gold mines in Colombia, producing 148,000 oz in H1 2026 (up 31% YoY) and targeting 500,000 oz annually as Marmato's new CIP plant reaches first gold in Q4 2026.
Notable vs. Peers
- Jurisdiction risk score of 6/10 is meaningfully riskier than the peer average of 7.8/10.
- All-in sustaining cost of $1,534/oz is 22% lower than the peer producer average of $1,961/oz.
Lifecycle Milestones
Construction Milestones
5 of 5 reached- Jul 2023 · Corpocaldas (Colombian regional environmental authority) approved the Environmental Management Plan (PMA) for the Marmato Lower Mine underground project and 4,000 tpd plant. · Source
- Reached — date not disclosed · No standalone FID release found; the same July 12, 2023 permit release confirmed the US$280M Lower Mine project fully funded (own cash plus a US$122M Wheaton Precious Metals stream) with construction phases to follow immediately -- functioning as the de facto go-ahead. · Source
- Reached — date not disclosed · Physical construction of the Marmato Lower Mine (access road, portal, declines, later the process plant) commenced September 2023 per the company's Jan 2024 guidance/outlook release; no single release pinpointing an exact day was found. · Source
- Sep 2010 · Gran Colombia Gold (Aris Mining's corporate predecessor) restarted mining operations at the three underground mines (El Silencio, Providencia, Sandra K) acquired from bankrupt Frontino Gold Mines -- these are part of today's Segovia Operations, the producing asset Aris Mining's PRODUCTION-stage claim actually rests on (Marmato Lower Mine, the subject of this miner's other three milestone rows, has not yet reached first production). The company's Sept 7, 2010 release states operations 're-started...yesterday'. [Task #697 chronology ruling, 2026-08-25] NOT A DATE ERROR -- READ THIS BEFORE "CORRECTING" THE DATE. Task #696's permit rule flags PERMIT_GRANTED (2023-07-12) as postdating this row. Both dates are correct; they describe DIFFERENT ASSETS, as the note above already sets out. This row is SEGOVIA (El Silencio / Providencia / Sandra K, restarted 6 Sep 2010 by corporate predecessor Gran Colombia Gold) -- the producing asset Aris Mining's PRODUCTION stage actually rests on. The permit, CONSTRUCTION_DECISION and CONSTRUCTION_START rows are all MARMATO LOWER MINE, which the note states "has not yet reached first production" (targeting first gold Q4 2026). A producing mine and a mine still under construction under one ticker cannot be ordered against each other, because MinerConstructionMilestone has no per-asset scoping. Same structural shape as SBMI. Deliberately NOT disputed=true: both events genuinely occurred as recorded. Flagged for the reviewed exception set (key: PERMIT_GRANTED_AFTER_FIRST_PRODUCTION); not added here because that file was under concurrent edit. · Source
- Reached — date not disclosed · Genuinely reached, but no single company-wide commercial-production date exists: Aris Mining (formerly Gran Colombia Gold/GCM Mining) operates Segovia (a long-running underground gold district with a small-scale/artisanal mining history predating industrial operation by decades, recently expanded to 3,000 tpd) and Marmato (existing underground operations producing since well before Aris's current ownership, with a new 5,000 tpd CIP plant under construction, targeting first gold Q4 2026 -- not yet part of this claim). Q2 2026 results (released 2026-07-07) reported consolidated gold production of 73.7 koz (Segovia 64.4 koz, Marmato 9.3 koz), H1 2026 of 148.0 koz, on track for 2026 guidance of 300,000-350,000 oz. This row was missing entirely prior to 2026-08-21 -- a genuine data gap, not a stage error; Miner.stage was already correctly PRODUCTION. · Source
Milestones are recorded only from a company's own dated disclosure. A milestone with no date shown is one we can confirm was reached but for which no date was disclosed — we don't estimate one. "Not yet reached" means exactly that, not that a date is missing. An "Expected" line likewise only ever reflects the company's own guidance (e.g. a study or permit decision targeted for a stated quarter) — most not-yet-reached milestones have none, and that absence means no such guidance has been disclosed, not that one is overdue.
A relative ranking of how closely this company matches the profile of juniors that have actually been acquired — not a probability, and not a reason to buy. Acquisitions are rare: only a few dozen significant deals happen a year across a universe of thousands of juniors, so even a high score here describes a long shot. The strongest signal the underlying research identifies — whether a major already holds a JV, earn-in, or 5–19.9% strategic stake — isn't tracked yet and is absent from this score.
Your Rankings
Management Team
Founded Endeavour Financial in 1988 and later founded and led Endeavour Mining Corporation as CEO from 2002 to 2016, growing it into a major West African gold producer. Founded and led Leagold Mining from 2016 to 2020, building a multi-asset producer across Mexico and Brazil before its 2020 merger into Equinox Gold, where he served as Vice Chairman. Took over as Chair and CEO of Aris Gold in 2020 and led its subsequent merger with GCM Mining into Aris Mining Corporation.
B.Comm from Queen's University and a CFA charterholder, one of the founding executives of three gold companies: Endeavour Mining (founded 2009), Leagold Mining (founded 2016, later acquired by Equinox Gold), and Aris Gold (founded 2021, predecessor to Aris Mining). Previously Managing Director, Research and Analysis at Endeavour Financial, a boutique investment bank focused on global mining. Serves as CFO & EVP of Aris Mining, slated to become President starting in 2026.
Chartered Professional Accountant with a degree in Economics (with distinction) from the University of Victoria and a Diploma in Accounting from UBC's Sauder School of Business. Began his career at Deloitte, later served as VP of Finance at a Vancouver-based junior miner, then joined Pan American Silver in 2014, rising to VP Financial Reporting and, from 2022, Senior VP of Finance and IT, before joining Aris Mining as CFO in July 2025.
Insiders, Investors & Smart Money
Notable shareholders and insiders whose involvement is worth knowing about, plus what we're seeing from institutional/large-investor activity.
Mubadala Investment Company, Abu Dhabi's sovereign wealth fund, is the largest shareholder at about 9.2%, but it is worth knowing how it got there: Aris issued 15.75 million shares to Mubadala in June 2024 as payment for an extra 31% of the Soto Norte project, with 6 million more to follow on permitting. That is a vendor taking paper, not an outside investor buying in. MM Asset Management (MMCAP) holds a further 6.69% per a Schedule 13G/A. Van Eck Associates Corporation, the GDX/GDXJ gold-miner ETF sponsor, separately discloses a real 9.5% stake, largely index-driven rather than a discretionary specialist pick. Insider activity runs heavily one way -- seven insiders sold roughly 434,000 shares between December 2025 and June 2026, against a single purchase, Oliver Dachsel's 16,500 shares in January 2026, made after he had sold 90,911 of his own the month before.
No notable insiders tracked for this miner yet.
Reports, Presentations & Documents
We haven't parsed this company's PEA/PFS/FS recommendations yet — cut-off grade, mine life, DCF/NPV, and the report's own next-steps guidance are a planned research pass, not live data for every company yet.