Alligator Energy LimitedA
Alligator Energy's flagship is the Samphire ISR uranium project, 20km south of Whyalla, South Australia. The most recent full economic study on record -- a Dec 2023 scoping study on the Blackbush deposit -- outlined a post-tax NPV8% of A$257M, a 42% IRR, initial capex of A$131M, average production of 1.2Mlb U3O8/yr and a 12-year mine life (10Mlb total from Blackbush alone). Since then: a maiden Inferred Mineral Resource Estimate (+12Mlb, 19 Jun 2026) brought total Samphire resources to 30Mlb U3O8, and a first-well-pattern ISR field recovery trial met its ~70% recovery target over ~70 pore-volume exchanges in 2026. Neither of those 2026 results has yet been rolled into an updated economic study -- a Bankable Feasibility Study is underway, with an updated MRE expected early 2027 and the BFS itself targeted mid-2027. Seeded at PEA on the strength of the still-current Dec 2023 scoping study (the most recent completed economic study) rather than the newer, not-yet-costed 2026 technical progress -- flagged rather than silently carried forward as FEASIBILITY. Also holds the Big Lake Uranium Project and ground across the Alligator Rivers Uranium Province. Cash/debt not confidently sourced this pass -- left null rather than guessed.
Lifecycle Milestones
A relative ranking of how closely this company matches the profile of juniors that have actually been acquired — not a probability, and not a reason to buy. Acquisitions are rare: only a few dozen significant deals happen a year across a universe of thousands of juniors, so even a high score here describes a long shot. The strongest signal the underlying research identifies — whether a major already holds a JV, earn-in, or 5–19.9% strategic stake — isn't tracked yet and is absent from this score.
Your Rankings
Management Team
No one tracked here yet.
Insiders, Investors & Smart Money
Notable shareholders and insiders whose involvement is worth knowing about, plus what we're seeing from institutional/large-investor activity.
No smart-money tracking (institutional/large-investor activity) for this miner yet — this is a planned feature, not live data.
No notable insiders tracked for this miner yet.
Reports, Presentations & Documents
Samphire Project (South Australia), Alligator Energy's flagship ISR-amenable uranium asset (JORC 2012). 19 Jun 2026 Plumbush maiden MRE lifted the combined Samphire resource 67% to 30 Mlb U3O8 -- comprising Blackbush (18 Mlb: 14.2 Mlb Indicated + 3.8 Mlb Inferred) and Plumbush (12 Mlb, entirely Inferred). ouncesFound written as 14,200,000 lb U3O8 -- Blackbush's Indicated component only, the sole Measured+Indicated category resource across the project as of this pass (Plumbush has no Indicated/Measured category yet). Supports the company's planned Bankable Feasibility Study, targeted mid-2027.