JUNIORMETRICS
Gold$4,479.95/oz
Silver$66.98/oz
Copper$6.00/lb

Zimplats Holdings Limited

ZIM·$12.50·$1.2B cap
Multi-Metalalso:Ngezi / Selous Metallurgical Complex Map

Zimplats Holdings Limited mines and processes platinum group metals (platinum, palladium, rhodium, iridium, ruthenium, plus by-product nickel, gold, copper and silver) from the Great Dyke geological formation in Zimbabwe, at its Ngezi mining operations and Selous Metallurgical Complex. It is an 87%-owned subsidiary of Impala Platinum Holdings Limited (Implats), dual-listed on the ASX (primary, this record) with Implats' South African listing as the controlling parent. FY26 group production guidance was delivered at 630,000-660,000oz 6E in matte, and the company proposed a maiden dividend alongside record H1 FY26 cash generation.

Notable vs. Peers

  • Jurisdiction risk score of 4/10 is meaningfully riskier than the peer average of 7.4/10.

Lifecycle Milestones

Grassroots
Resource Def.
PEA
PFS
Feasibility
Permitting
Construction
ProductionCurrent

Construction Milestones

5 of 5 reached
  1. Reached — date not disclosed · Per Business Excellence's profile of Zimplats' Ngezi mine (bus-ex.com, verified by direct fetch), the original Special Mining Lease and Mining Agreement covering the Hartley Complex/Great Dyke platinum tenure was entered into with the Zimbabwean government in 1994, when BHP and Delta Gold (2/3 BHP, 1/3 Delta) established the Hartley Complex mine and smelter at Selous. Zimplats itself was only created in 1998 as Delta's spin-off vehicle for its platinum interests, and only purchased BHP's share of the Hartley/Mhondoro joint ventures in late 2000 -- inheriting this pre-existing Special Mining Lease rather than obtaining a new one -- before initiating the Ngezi open-pit development in early 2001 (the same asset this miner's existing CONSTRUCTION_DECISION/CONSTRUCTION_START/FIRST_PRODUCTION rows, all dated to the 2001-2002 window, are anchored to). Zimplats' own history page confirms the original Special Mining Lease was later replaced by two ordinary mining leases effective 31 May 2018, but that 2018 event is a renewal/replacement of already-held tenure, not the original grant. Year precision only (1994) -- no day-level date confirmed in this pass. Same reused-pre-existing-tenure shape as HL/DRD (Task #646 batch 1) and TBR/East Kundana and USA/EC120 (this same batch, above). · Source
  2. Reached — date not disclosed · Zimplats initiated the Ngezi/SMC (Selous Metallurgical Complex) project in 2001 with Implats and ABSA investment backing, following its late-2000 purchase of BHP's remaining interest in the Hartley/Mhondoro joint ventures (concentrator and smelter). Exact day within 2001 not confirmed from available sourcing -- recorded reached-but-undated. · Source
  3. Reached — date not disclosed · Zimplats commenced development of the Ngezi open-pit mine in early 2001, together with construction of the 80km tarred road linking Ngezi and Selous. Exact day not confirmed from available sourcing -- recorded reached-but-undated (same period as CONSTRUCTION_DECISION above; no distinct dated event separates project initiation from physical development start). · Source
  4. Reached — date not disclosed · Zimplats commenced production at the Ngezi opencast mine in December 2001; first converter matte was exported in April 2002. Exact day within December 2001 not confirmed from available sourcing -- recorded reached-but-undated. · Source
  5. Reached — date not disclosed · Genuinely reached, but no single company-wide commercial-production date exists: Zimplats' Bushveld Complex-related PGM operations (Ngezi/Selous Metallurgical Complex, Mupfure) have a multi-decade continuous operating history with successive expansion phases each commissioned at different times, predating any single trackable company-wide milestone. This row was missing entirely prior to 2026-08-21 -- a genuine data gap, not a stage error; Miner.stage was already correctly PRODUCTION. · Source

Milestones are recorded only from a company's own dated disclosure. A milestone with no date shown is one we can confirm was reached but for which no date was disclosed — we don't estimate one. "Not yet reached" means exactly that, not that a date is missing. An "Expected" line likewise only ever reflects the company's own guidance (e.g. a study or permit decision targeted for a stated quarter) — most not-yet-reached milestones have none, and that absence means no such guidance has been disclosed, not that one is overdue.

10/10
Weak track recordStrong track record
6.6/10
Thin runwayWell-capitalized
4/10
High riskLow risk
How this is calculated
10/10
Weaker depositStronger deposit
7.7/10
Weaker profileStronger profile
Price Chart
$10.87$12.69$14.29$11.32$12.50AugNovFebJunSep
Aug 12, 2025Sep 4, 2026
News
$12.50
+43%from low-31%from high
$8.74$18.10
$1.2B
Far belowFar above
$80.6M median
Price (USD - Local)
$12.50 - AUD 17.34
Cash Position (USD)
$145.7M
Far belowFar above
$65.6M median
Debt (USD)
$82.5M
Far aboveFar below
$24.9M median
$1.1B
Far belowFar above
$83.9M median
107.6M
Far aboveFar below
260.4M median
Jurisdiction
Zimbabwe
25,500,000 oz
Far belowFar above
1.9M median
$43.92/oz
Far aboveFar below
$28.22/oz median
This company's data hasn't been researched yet
Underground (Ngezi mining operations, Great Dyke); PGM ore processed at the Selous Metallurgical Complex
42 yrs
Far belowFar above
20 yrs median
All-In Sustaining Cost
This company's data hasn't been researched yet
Not enough peer data yet
This company's data hasn't been researched yet
Not enough peer data yet
This company's data hasn't been researched yet
87.8%
0%100%
27% median
This company's data hasn't been researched yet
1005 kmfrom CMOC Group Limited's Tenke Fungurume
Outside typical bolt-on range
This company's data hasn't been researched yet
This company's data hasn't been researched yet
This company's data hasn't been researched yet
This company's data hasn't been researched yet
This company's data hasn't been researched yet
Acquisition Susceptibility
2.4/10
Unlikely bolt-onFits the takeout profile

A relative ranking of how closely this company matches the profile of juniors that have actually been acquired — not a probability, and not a reason to buy. Acquisitions are rare: only a few dozen significant deals happen a year across a universe of thousands of juniors, so even a high score here describes a long shot. The strongest signal the underlying research identifies — whether a major already holds a JV, earn-in, or 5–19.9% strategic stake — isn't tracked yet and is absent from this score.

Overall Score Trend
+11.6% since 2026-08-08

Your Rankings

Community Sentiment
SELLINGBUYING
CategoryCommunityYour Ranking
Overall (0)Log in to rank
Management (0)Log in to rank
Financials (0)Log in to rank
Jurisdiction (0)Log in to rank
Project Quality (0)Log in to rank

Management Team

Chief Executive Officer of Zimplats Holdings, joined 1 Oct 2007. Chairman of the operating subsidiary, Zimbabwe Platinum Mines (Private) Limited. Career: Managing Director, Mimosa Mining Company (Private) Limited (joined Feb 1998, MD from Jan 2005 to Sep 2007), a real, continuously-operating Zimbabwean PGM producer.

Chief Finance Officer of Zimplats Holdings, joined the Group 1 Nov 2019. Chairperson of the operating subsidiary's finance, procurement and IT steering committees; member of its capital steering and projects steering committees. Career: Group Chief Financial Officer, Fidelity Life Assurance (2017-2019); Finance Director, Zimnat Insurance (2011-2017); Finance Manager, Marsh Captive Solutions (2007-2010); Senior Auditor, KPMG Chartered Accountants (to 2007); Internal Audit Manager, Eagle Insurance (2001-2005); Audit Manager, PwC (from 1995). [Task #513 batch10: this Person record's name was corrected from an existing data-entry error ("Patricia Muzah") -- Zimplats' own official management page (zimplats.com/about-us/management/, fetched live) names the CFO "Patricia Zvandasara"; no separate "Patricia Muzah" exists in any independent source found this pass. Same underlying Person id retained; all other facts on the record (CFO of Zimplats, joined Nov 2019) already matched Zvandasara exactly, confirming this is a name-field correction, not a stale-officer succession.]

Insiders, Investors & Smart Money

Notable shareholders and insiders whose involvement is worth knowing about, plus what we're seeing from institutional/large-investor activity.

Smart money
3/10

Impala Platinum Holdings (Implats), one of the world's largest platinum-group-metals producers, owns 87% of this company -- confirmed directly in Zimplats' own annual report. This is long-standing, decades-old subsidiary-style control rather than a fresh cash investment, so it scores in the legacy-control band rather than the top band. No specialist fund or qualifying insider activity was found.

No notable insiders tracked for this miner yet.

Reports, Presentations & Documents

Technical Report Takeaways

Zimplats (87%-owned by Implats) is developing the Mupani Mine (feasibility study approved Nov 2016; total project cost since expanded materially beyond the original US$148 million estimate, part of broader capital plans exceeding US$386 million) to replace the depleting Rukodzi and Ngwarati mines, targeting 2.2Mtpa in FY2026 (design capacity 3.6Mtpa by FY2029) and adding ~3 million oz to Zimplats' resource base over a stated 34-year mine life for Mupani itself. Zimplats also completed a smelter expansion / SO2 abatement project (new 38MW furnace commissioned H1 FY2025, ~US$387M spent of a US$544M total budget) and a 35MW solar plant. NO NPV or IRR figure was found disclosed for Mupani, the smelter expansion, or Zimplats as a whole across this pass -- checked directly against Implats Group and Zimplats' own current disclosures; as an operating subsidiary within the Implats group, Zimplats does not appear to publish standalone project-level DCF economics the way an independent single-asset junior would. Structural absence, not a research gap. NOTE (informational only, not acted on this pass -- out of this pass's scope to correct existing fields): Mupani's own stated mine life (34 years) differs from the mineLifeYears already on file for this record (42 years, presumably reflecting the whole Ngezi/SMC operation rather than the Mupani development alone) -- flagged for whoever next reviews mineLifeYears, not overwritten here since this pass's scope was limited to filling nulls (dcfNpvUsd/irrPct), not correcting an existing verified figure.