JUNIORMETRICS

Wildcat Resources Limited

WDCTF·WC8·US$0.15 (AUD 0.22)·US$209.9M cap
OtherTabba Tabba Lithium-Tantalum Project, Western Australia Map

Wildcat Resources is a pre-revenue lithium developer whose value is concentrated in the 100%-owned Tabba Tabba lithium-tantalum project, 50km from Port Hedland, WA, near Pilbara Minerals' Pilgangoora and Mineral Resources' Wodgina hard-rock lithium mines. The project's mineral resource estimate stands at 74.1Mt @ 1% Li2O for 740,200t of contained Li2O (94% in the Indicated category, 28 Nov 2024). Wildcat completed a Pre-Feasibility Study for Tabba Tabba in July 2025, with a maiden Ore Reserve of 46.3Mt @ 0.99% Li2O, a post-tax NPV8 of A$1.2 billion and a 22.9% IRR at a flat consensus spodumene price of US$1,384/t, and is now completing a Definitive Feasibility Study with a wider scope, due for release in the second half of 2026. Wildcat held A$37.2 million in cash at 30 Jun 2026. Managing Director is Aj Saverimutto, with Matthew Banks as Executive Director and Jeff Elliott as Non-Executive Chairman.

Notable vs. Peers

  • Trading within 6% of its 52-week low — weak recent price momentum.

Lifecycle Milestones

Grassroots
Resource Def.
PEA
PFSCurrent
Feasibility
Permitting
Construction
Production
Prior Ownership & Infrastructure
Road Access1 of 4 checked, 1 in place

Not yet determined: mill, tailings facility, grid power.

4.7/10
Weak track recordStrong track record
4.7/10 vs.
6.4/10
Thin runwayWell-capitalized
6.4/10 vs.
How this is calculated
6.4/10
Weaker depositStronger deposit
6.4/10 vs.
How this is calculated
7.9/10
Harder place to buildEasier place to build
7.9/10 vs.
What goes into it
  • Jurisdiction (40%)9/10

    Western Australia: Fraser PPI 2025 is 88.53 of 100 (rank 13 of 68), which maps to 9 on this site's scale. The Tabba Tabba lithium-tantalum project is in Western Australia, a Tier-1 mining jurisdiction.

  • Infrastructure (40%)6.4/10

    Confirmed road access at Tabba Tabba Lithium-Tantalum Project, Western Australia; existing mill, grid power, and tailings facility not yet researched, counted at a neutral 5/10 until established.

  • Nearby producing mine (20%)8.5/10

    Pilgangoora (PLS Group Limited) is 43 km away -- within regional-platform range.

6.4/10
Weaker profileStronger profile
6.4/10 vs.
Price Chart
$0.134$0.187$0.268$0.261$0.157AugDecMarJulOct
Aug 12, 2025 – Oct 20, 2026
News
$0.15
+16.3%from low-67%from high
$0.13$0.47
$209.9M
Far belowFar above
$209.9M vs. $15.6M peer median
Price (USD - Local)
US$0.15 (AUD 0.22)
Cash Position (USD)
$25.7M
Far belowFar above
$25.7M vs. $1.7M peer median
Debt (USD)
Far aboveFar below
$0 vs. $0 peer median
$184.2M
Far belowFar above
$184.2M vs. $12.5M peer median
1.4B
Far aboveFar below
1.4B vs. 232M peer median
Jurisdiction
Australia
1,753,604 t LCE
Feeds Deposit Quality score
Indicated1,753,604 t LCE
Inferrednot scored76,910 t LCE
Total resource1,830,514 t LCE
Far belowFar above
1.8M t vs. 721.9K t peer median
Compares M&I only — Inferred isn't compared or scored.
$105.03/t
M&I
Total resource (incl. Inferred)$100.62/t
Peer median $29.78/t
Far aboveFar below
$105.03/t vs. $45.27/t peer median
Cut-off: 0.45% Li2O -- Mineral Resource cut-off (maiden MRE, effective/announced 2024-11-28, JORC 2012): 74.1Mt @ 1.0% Li2O (740,200t contained Li2O), 94% Indicated / 6% Inferred. Ore Reserve (PFS, announced 2025-07-29): maiden Ore Reserve 46.3Mt @ 0.99% Li2O supporting a 17-year, two-stage mine plan -- reserve-level cutoff (Li2O% or economic/NSR basis) NOT disclosed at a numeric figure in accessible sources; genuine partial gap, not guessed.
Pre-Feasibility Study stage lithium-tantalum development, no active mining
17 yrs2025 study
Far belowFar above
17 yrs vs. 17.5 yrs peer median
$658/t SC5.52025 study
@8%$835.1M(at $1,384/t SC6)2025 study
Far belowFar above
$835.1M vs. $527.5M peer median
0.25x2025 study
Far aboveFar below
0.25x vs. 0.08x peer median
0.22x2025 study
Far aboveFar below
0.22x vs. 0.08x peer median
$480.9M2025 study
Far aboveFar below
$480.9M vs. $462M peer median
1.7xBelow Durrett's 2:1 bar2025 study
Far belowFar above
1.7x vs. 1.8x peer median
$1,384/t SC62025 study
23%Below Durrett's 25% developer bar2025 study
Far belowFar above
23% vs. 30% peer median
31.2%
0%100%
31.2% vs. 19% peer median
43 kmfrom PLS Group Limited's Pilgangoora
Within regional-platform range (~50km)
-$13.4M
Far belowFar above
-$13.4M vs. -$2.9M peer median
-$0.01
Far belowFar above
-$0.01 vs. -$0.011 peer median

Acquisition Susceptibility

How this is calculated
6.5/10
Unlikely bolt-onFits the takeout profile

A relative ranking of how closely this company matches the profile of juniors that have actually been acquired — not a probability, and not a reason to buy. Acquisitions are rare: only a few dozen significant deals happen a year across a universe of thousands of juniors, so even a high score here describes a long shot. The strongest signal in the research, a producer that already owns part of the company, is scored from its disclosed strategic shareholders. A producer that is a joint-venture or earn-in partner on the project, rather than a shareholder, isn't captured yet.

How this score is built

  • Disclosed pending deal
    Sub-score: Not scored

    No pending acquisition or merger disclosed (checked)

    Not scored: having no deal in flight isn't held against a company.

    Weight 26.25%
  • Producer's strategic stake
    Sub-score: Not scored

    No producer holds a disclosed stake on file (holder register researched) See holders

    Not scored: most juniors that do get bought had no prior toehold, so a missing stake says little either way.

    Weight 25%
  • Distance to a producing mine
    Sub-score:
    5.7/10

    Nearest producing mine: Pilgangoora (PLS Group Limited), 43 km

    10 next to a producing mine, 8 at 20 km, 5 at 50 km, 0 beyond 200 km.

    Weight 22.5% · 46% here
  • Lifecycle stage
    Sub-score:
    8/10

    Stage: Pre-Feasibility Study

    Feasibility and permitting score 10, where deals cluster, and production 5.5; earlier stages score less, down to 1 at grassroots.

    Weight 15% · 31% here
  • Jurisdiction
    Sub-score:
    9/10

    Australia: jurisdiction score 9/10

    Our jurisdiction score, used as is: higher means lower political and permitting risk.

    Weight 6.75% · 14% here
  • Commodity
    Sub-score:
    2/10

    Primary commodity: Other

    Gold 10, copper 8, silver 5, nickel and uranium 4, others 2: most majors' deals are for gold.

    Weight 4.5% · 9% here

Weight is each input's share of the full score. “Here” is its share of this company's score: inputs that aren't scored are left out and the rest re-weighted, never counted as zero.

Overall Score Trend
-7.2% since 2026-08-09 · -19% from peak

Your Rankings

Community Sentiment
—SELLINGBUYING
CategoryCommunityYour Ranking
Overall— (0) 
Management— (0) 
Financials— (0) 
Jurisdiction— (0) 
Project Quality— (0) 

Management Team

Managing Director of Wildcat Resources Limited.

Executive Director of Wildcat Resources Limited.

Insiders, Investors & Smart Money

Notable shareholders and insiders whose involvement is worth knowing about, plus what we're seeing from institutional/large-investor activity.

Smart money
1/10

No named institutional holder resolves to a specialist -- the register is entirely passive index funds. Technical Director Samuel Ekins bought stock on the open market in June 2026, the only insider activity found -- one distinct insider, not enough on its own for the higher band.

No notable insiders tracked for this miner yet.

Reports, Presentations & Documents

Technical Report Takeaways

Wildcat Resources owns 100% of the Tabba Tabba lithium-tantalum project, about 50km from Port Hedland in Western Australia, near the Pilgangoora and Wodgina hard-rock lithium mines. Its resource is 74.1Mt grading 1% Li2O for 740,200t of contained Li2O, 94% of it in the indicated category. A pre-feasibility study completed in July 2025 outlines a two-stage mine plan on a maiden ore reserve of 46.3Mt at 0.99% Li2O, with a 17-year mine life, an after-tax NPV of US$835.1M and a 22.9% IRR at a flat spodumene concentrate price of US$1,384/t, initial capital of US$480.9M and an all-in sustaining cost of US$658/t of concentrate. A definitive feasibility study with a wider scope is due for release in the second half of 2026.

No reports or presentations linked yet.