Zincalso:Tala Hamza Zn-Pb Project (49% JV, Algeria); Bird-in-Hand Au Project (100%, South Australia); Angas Zinc Mine (100%, South Australia, past-producing) Map

Terramin Australia Limited (ASX: TZN) is an Adelaide-based base and precious-metals developer, ASX-listed since 2003, with three assets. Tala Hamza, one of the world's largest undeveloped zinc-lead deposits, is held via a 49% interest in Bejaia Zinc & Lead Spa (BZL), a joint venture with two Algerian state-owned entities holding the remaining 51% (Enterprise Nationale des Produits Miniers Non-Ferreux et des Substances Utiles Spa, 48.5%, and Office National de Recherche Geologique et Miniere, 2.5%); Terramin holds management rights over the JV. After years of delay, the Algerian mining regulator issued the Mining Permit for Tala Hamza in May 2023, and site preparation (site access and clearing, operational and laydown areas, early ground preparation) commenced in March 2026. Long-term project financing negotiations with a state-owned Algerian bank are described as 'well advanced'; total project investment is estimated at US$471M. Terramin also wholly owns two South Australian assets: Bird-in-Hand, a high-grade gold project near Woodside in the Adelaide Hills, whose land was returned to Terramin's Exploration Licence 6447 by a March 2026 Court of Appeal ruling that set aside a 2023 mining-reservation proclamation; and Angas, a past-producing zinc mine (closed) at Strathalbyn with a remaining resource.

Notable vs. Peers

  • Financials score of 1/10 is weaker than the peer average of 5.5/10.
  • Jurisdiction risk score of 5/10 is meaningfully riskier than the peer average of 7.9/10.
  • Trading within 2% of its 52-week low — weak recent price momentum.

Lifecycle Milestones

Grassroots
Resource Def.
PEA
PFS
Feasibility
Permitting
ConstructionCurrent
Production

Construction Milestones

3 of 5 reached
  1. May 2023 · Source
  2. Reached — date not disclosed · Source
  3. Mar 2026 · Source
  4. Not yet reached
  5. Not yet reached

Milestones are recorded only from a company's own dated disclosure. A milestone with no date shown is one we can confirm was reached but for which no date was disclosed — we don't estimate one. "Not yet reached" means exactly that, not that a date is missing. An "Expected" line likewise only ever reflects the company's own guidance (e.g. a study or permit decision targeted for a stated quarter) — most not-yet-reached milestones have none, and that absence means no such guidance has been disclosed, not that one is overdue.

Prior Ownership & Infrastructure
2 of 4 checked, 0 in place

Not in place: road access, grid power. Not yet determined: mill, tailings facility.

Not yet researched
Weak track recordStrong track record
1/10
Thin runwayWell-capitalized
1/10 vs.
How this is calculated
Not yet researched
Weaker depositStronger deposit
How this is calculated
3.9/10
Harder place to buildEasier place to build
3.9/10 vs.
What goes into it
  • Jurisdiction (40%)5/10

    Tala Hamza, the project that sets the company's stage, is in Bejaia Province, Algeria, where it saw years of delay before its 2023 mining permit and a 2026 start to site works. Algeria brings state-partner, bureaucratic, legal and currency-control risk, offset by strengthening government support: a granted permit, Investment Promotion Agency registration with tax exemptions and concessional financing, and government-funded land acquisition.

  • Infrastructure (40%)2.1/10

    No confirmed road access and no confirmed grid power at Tala Hamza Zinc-Lead Project, Bejaia, Algeria; existing mill and tailings facility not yet researched, counted at a neutral 5/10 until established.

  • Nearby producing mine (20%)Not yet researched

    No project coordinates on file yet, so distance to a producing mine can't be measured.

3.7/10
Weaker profileStronger profile
3.7/10 vs.
Price Chart
$0.036$0.02$0.026$0.014$0.013SepDecAprJulOct
Sep 19, 2025 – Oct 15, 2026
$0.012
+3.6%from low-68.1%from high
$0.011$0.037
$30.9M
Far belowFar above
$30.9M vs. $154M peer median
Price (USD - Local)
US$0.012 (AUD 0.017)
Cash Position (USD)
$73.4K
Far belowFar above
$73.4K vs. $21.8M peer median
Debt (USD)
$29.6M
Far aboveFar below
$29.6M vs. $16.8M peer median
$60.3M
Far belowFar above
$60.3M vs. $205.6M peer median
2.6B
Far aboveFar below
2.6B vs. 136.1M peer median
Jurisdiction
Algeria

Acquisition Susceptibility

How this is calculated
5.6/10
Unlikely bolt-onFits the takeout profile

A relative ranking of how closely this company matches the profile of juniors that have actually been acquired — not a probability, and not a reason to buy. Acquisitions are rare: only a few dozen significant deals happen a year across a universe of thousands of juniors, so even a high score here describes a long shot. The strongest signal in the research, a producer that already owns part of the company, is scored from its disclosed strategic shareholders. A producer that is a joint-venture or earn-in partner on the project, rather than a shareholder, isn't captured yet.

How this score is built

  • Disclosed pending deal
    Sub-score: Not scored

    No pending acquisition or merger disclosed (checked)

    Not scored: having no deal in flight isn't held against a company.

    Weight 26.25%
  • Producer's strategic stake
    Sub-score: Not scored

    No producer stake on file; largest strategic holder is Asipac Group Pty Ltd (45.5%) See holders

    Not an operating producer, so it isn't the toehold-then-takeout pattern the research documents; a missing producer stake isn't held against a company.

    Weight 25%
  • Distance to a producing mine
    Sub-score: Not yet researched

    Distance not yet researched: no project coordinates on file

    Distance can't be measured without coordinates, so excluded rather than counted as far.

    Weight 22.5%
  • Lifecycle stage
    Sub-score:
    7/10

    Stage: Construction

    Feasibility and permitting score 10, where deals cluster, and production 5.5; earlier stages score less, down to 1 at grassroots.

    Weight 15% · 57% here
  • Jurisdiction
    Sub-score:
    5/10

    Algeria: jurisdiction score 5/10

    Our jurisdiction score, used as is: higher means lower political and permitting risk.

    Weight 6.75% · 26% here
  • Commodity
    Sub-score:
    2/10

    Primary commodity: Zinc

    Gold 10, copper 8, silver 5, nickel and uranium 4, others 2: most majors' deals are for gold.

    Weight 4.5% · 17% here

Weight is each input's share of the full score. “Here” is its share of this company's score: inputs that aren't scored are left out and the rest re-weighted, never counted as zero.

Overall Score Trend
+23.3% since 2026-09-19

Your Rankings

Community Sentiment
—SELLINGBUYING
CategoryCommunityYour Ranking
Overall— (0) 
Management— (0) 
Financials— (0) 
Jurisdiction— (0) 
Project Quality— (0) 

Management Team

Executive Chairman of Terramin Australia Limited, appointed 17 April 2013. Chairman of Melbourne-based Asipac Group, with over 25 years' experience in investment, primarily property and resources. Former Vice Chairman of the Australia China Business Council (Victoria).

Non-Executive Director and Deputy Chairman of Terramin Australia Limited, appointed 9 September 2024. Mining professional with 40+ years across metals, mining and energy sectors; metallurgist by training, has served on numerous ASX and AIM-listed company boards. Chairman Emeritus of Austmine, having led the organisation for 23 years. Member, Order of Australia (AM).

Executive Director of Terramin Australia Limited, appointed 1 December 2024. Mining executive with 30+ years' experience; formerly Non-Executive Chair of Maximus Resources Limited (ASX: MXR). Strong finance background specializing in equity, debt, project financing and commodity off-take negotiation. Bachelor of Economics.

Non-Executive Director of Terramin Australia Limited, appointed 2 January 2013. Accountant with 30 years in the property sector and financial accounting; Fellow, Institute of Public Accountants; owns an accounting practice focused on taxation and business consulting.

Non-Executive Director of Terramin Australia Limited, appointed 6 July 2023. Mining engineer with 30+ years' experience across Africa and Asia; Senior Expert of the Science Technology and Information Department of China Non-Ferrous Metals Industry's Foreign Engineering & Construction Co., Ltd.

Non-Executive Director of Terramin Australia Limited, appointed 13 February 2025. Partner and Head of China Practice at Gadens, a leading Australian law firm. Law and Commerce degrees, University of Melbourne.

Company Secretary of Terramin Australia Limited, appointed 6 March 2020. Over 21 years in accounting and tax roles within resources, including work at Newmont Australia, BHP Group and Ramelius Resources. CPA; Governance Practice certificate holder.

Insiders, Investors & Smart Money

Notable shareholders and insiders whose involvement is worth knowing about, plus what we're seeing from institutional/large-investor activity.

Smart money

No smart-money tracking (institutional/large-investor activity) for this miner yet — this is a planned feature, not live data.

No notable insiders tracked for this miner yet.

Reports, Presentations & Documents

Technical Report Takeaways

Terramin Australia is developing the Tala Hamza zinc-lead project in Algeria, one of the world's largest undeveloped zinc-lead deposits, through a 49% interest in Bejaia Zinc & Lead, a joint venture with two Algerian state-owned companies that hold the other 51%, with Terramin holding management rights. On a 100% basis the resource is about 53 Mt at 5.3% zinc and 1.3% lead, with a probable ore reserve of 25.9 Mt at 6.3% zinc and 1.8% lead supporting more than 20 years at 2.0 Mtpa under the March 2026 updated mining study, and total project investment is estimated at US$471M. Algeria's mining regulator issued the mining permit in May 2023, site preparation began in March 2026, and long-term financing with a state-owned Algerian bank is described as well advanced. Terramin also wholly owns the high-grade Bird-in-Hand gold project in South Australia's Adelaide Hills, whose land a March 2026 Court of Appeal ruling returned to its exploration licence, and the closed Angas zinc mine at Strathalbyn, which retains a remaining resource.

No reports or presentations linked yet.