JUNIORMETRICS

Tsodilo Resources LimitedT

TSDRF·TSD·US$0.078 (CAD 0.11)·US$5.2M cap
Multi-Metalalso:Xaudum Iron Formation Project (Block 1), Ngamiland, north-west Botswana (100% through Gcwihaba Resources); copper-cobalt and rare earth targets on the same licences Map

Tsodilo Resources Limited (TSXV: TSD) explores in north-west Botswana through its wholly owned subsidiary Gcwihaba Resources, which holds five metal prospecting licences in the Ngamiland region; renewal applications for all five were filed in late 2025 and are pending. Its key project is the Xaudum Iron Formation, a magnetite banded iron formation traced for about 37 km under Kalahari cover. SRK Consulting's NI 43-101 estimate for Block 1, effective 29 August 2014, reports an Inferred resource of 441 Mt at 29.4% iron within an optimised pit shell at a 12% iron cut-off, and test work indicates a magnetite concentrate of about 67% iron. Drilling at Block 2a, about 10 km to the south, has intersected the same magnetite units. In December 2023 the High Court of Botswana ordered the renewal of one licence after the government sought to exclude an area inside the Okavango Delta World Heritage buffer zone, which overlaps 169 Mt of the Block 1 resource. Tsodilo is also exploring for copper and cobalt, and for rare earths in two skarn prospects, on the same ground. It withdrew its application to extend the BK16 kimberlite licence near Orapa in May 2025 and wrote off that project.

Notable vs. Peers

  • Financials score of 1.5/10 is weaker than the peer average of 5/10.
  • Jurisdiction risk score of 6/10 is meaningfully riskier than the peer average of 7.7/10.

Lifecycle Milestones

Grassroots
Resource Def.Current
PEA
PFS
Feasibility
Permitting
Construction
Production
Not yet researched
Weak track recordStrong track record
1.5/10
Thin runwayWell-capitalized
1.5/10 vs.
How this is calculated
No verified figure
Weaker depositStronger deposit
How this is calculated
5.4/10
Harder place to buildEasier place to build
5.4/10 vs.
What goes into it
  • Jurisdiction (40%)6/10

    Botswana is a stable, well-established African mining jurisdiction, though outside the traditional Tier-1 set. Tsodilo's licences have also faced delays: part of one lies in the Okavango Delta World Heritage buffer zone, and the High Court ordered its renewal in December 2023.

  • Infrastructure (40%)No verified figure

    Researched with nothing found: no source we could cite confirms or rules out an existing mill, road access, grid power, or tailings facility at Xaudum Iron Formation Project (Block 1), Ngamiland, north-west Botswana (checked Oct 2, 2026; recheck due Mar 31, 2027). Counts at a neutral 5/10 until one does.

  • Nearby producing mine (20%)Not yet researched

    No project coordinates on file yet, so distance to a producing mine can't be measured.

4.2/10
Weaker profileStronger profile
4.2/10 vs.
Price Chart
$0.10$0.115$0.165$0.093$0.078AugDecMarJulOct
Aug 12, 2025 – Oct 20, 2026
Stage changeNews
$0.078
+39.3%from low-74.1%from high
$0.056$0.30
See who ↓
5.4%
Low alignmentHigh alignment
5.4% vs.
See who ↓
0%
Low alignmentHigh alignment
0% vs.
$5.2M
Far belowFar above
$5.2M vs. $15.7M peer median
Price (USD - Local)
US$0.078 (CAD 0.11)
Cash Position (USD)
$233.3K
Far belowFar above
$233.3K vs. $1.8M peer median
Debt (USD)
$2.6M
Far aboveFar below
$2.6M vs. $0 peer median
$7.6M
Far belowFar above
$7.6M vs. $12.8M peer median
66.7M
Far aboveFar below
66.7M vs. 233.6M peer median
Jurisdiction
Botswana
Inferrednot scored129,654,000 t Fe
Total resource129,654,000 t Fe
Total resource (incl. Inferred)$0.058/t
Peer median $1.21/t
Cut-off: 12% Fe (Xaudum Block 1, within an optimised pit shell; Inferred; SRK estimate effective 29 August 2014)
Resource-definition stage, no active mine
All-In Sustaining Cost
5.4%
0%100%
5.4% vs. 19.8% peer median
0%
0%100%
0% vs. 0% peer median
-$462K
Far belowFar above
-$462K vs. -$3M peer median
-$0.007
Far belowFar above
-$0.007 vs. -$0.011 peer median

Acquisition Susceptibility

How this is calculated
3.9/10
Unlikely bolt-onFits the takeout profile

A relative ranking of how closely this company matches the profile of juniors that have actually been acquired — not a probability, and not a reason to buy. Acquisitions are rare: only a few dozen significant deals happen a year across a universe of thousands of juniors, so even a high score here describes a long shot. The strongest signal in the research, a producer that already owns part of the company, is scored from its disclosed strategic shareholders. A producer that is a joint-venture or earn-in partner on the project, rather than a shareholder, isn't captured yet.

How this score is built

  • Disclosed pending deal
    Sub-score: Not scored

    No pending acquisition or merger disclosed (checked)

    Not scored: having no deal in flight isn't held against a company.

    Weight 26.25%
  • Producer's strategic stake
    Sub-score: Not scored

    No producer holds a disclosed stake on file (holder register researched) See holders

    Not scored: most juniors that do get bought had no prior toehold, so a missing stake says little either way.

    Weight 25%
  • Distance to a producing mine
    Sub-score: Not yet researched

    Distance not yet researched: no project coordinates on file

    Distance can't be measured without coordinates, so excluded rather than counted as far.

    Weight 22.5%
  • Lifecycle stage
    Sub-score:
    3.5/10

    Stage: Resource Definition

    Feasibility and permitting score 10, where deals cluster, and production 5.5; earlier stages score less, down to 1 at grassroots.

    Weight 15% · 57% here
  • Jurisdiction
    Sub-score:
    6/10

    Botswana: jurisdiction score 6/10

    Our jurisdiction score, used as is: higher means lower political and permitting risk.

    Weight 6.75% · 26% here
  • Commodity
    Sub-score:
    2/10

    Primary commodity: Other

    Gold 10, copper 8, silver 5, nickel and uranium 4, others 2: most majors' deals are for gold.

    Weight 4.5% · 17% here

Weight is each input's share of the full score. “Here” is its share of this company's score: inputs that aren't scored are left out and the rest re-weighted, never counted as zero.

Overall Score Trend
+0% since 2026-10-07

Your Rankings

Community Sentiment
—SELLINGBUYING
CategoryCommunityYour Ranking
Overall— (0) 
Management— (0) 
Financials— (0) 
Jurisdiction— (0) 
Project Quality— (0) 

Management Team

Chairman and Chief Executive Officer of Tsodilo Resources Limited since June 2002 (tenure ~23.9 years). Directly owns approximately 4.46% of the company. Re-elected as a director at TSD's 29 May 2026 Annual General Meeting.

President and Chief Operating Officer of Tsodilo Resources Limited, overseeing exploration and operations across the company's Botswana diamond, critical-minerals and rare-earth-element projects (Gcwihaba Metals Project, BK16 kimberlite).

Chief Financial Officer of Tsodilo Resources Limited.

Insiders, Investors & Smart Money

Notable shareholders and insiders whose involvement is worth knowing about, plus what we're seeing from institutional/large-investor activity.

Smart money
1/10

Checked directly against the company's own site, which is live. No producer, specialist fund or named institution holds a disclosed position that could be confirmed, and there are no insider trading records in our data.

No notable insiders tracked for this miner yet.

Reports, Presentations & Documents

Technical Report Takeaways

Tsodilo Resources explores in north-western Botswana through its wholly owned subsidiary Gcwihaba Resources, which holds five metal prospecting licences in the Ngamiland region, all with renewal applications filed in late 2025 and pending. Its key project is the Xaudum Iron Formation, a magnetite banded iron formation traced for about 37 km under Kalahari cover, where an NI 43-101 estimate by SRK Consulting for Block 1, effective 29 August 2014, reports an inferred resource of 441 Mt at 29.4% iron, containing 129,654,000 t of iron, within an optimised pit shell at a 12% iron cut-off; test work indicates a magnetite concentrate of about 67% iron. About 169 Mt of the Block 1 resource lies inside the Okavango Delta World Heritage buffer zone, where the High Court of Botswana ordered the licence renewed in December 2023 after the government sought to exclude that area. Drilling at Block 2a, about 10 km to the south, has intersected the same magnetite units, and Tsodilo is also exploring the same ground for copper and cobalt and for rare earths in two skarn prospects, where drilling in January 2026 confirmed skarn-hosted rare-earth mineralization. It gave up the BK16 kimberlite near Orapa in May 2025, and no economic study has been published.