JUNIORMETRICS
Gold$4,479.95/oz
Silver$66.98/oz
Copper$6.00/lb

Tharisa plc

THS·$1.72·$368.8M cap
OtherTharisa Mine, Bushveld Complex, South Africa Map

Tharisa (Cyprus-incorporated, dual-listed LSE/JSE) is an integrated resource group with controlling interests in platinum group metals (PGM) and chrome, operating the co-producing open-pit Tharisa Mine in the Bushveld Complex, South Africa, and launching underground mining to access further reserves as PGM grades in the open pit decline. H1 2026 (six months to 31 Mar 2026): revenue up 28% to $359.4 million, EBITDA up 138.1% to $104.3 million, PGM production up 15.5% (recoveries improved to 83.8%). FY2026 production guidance: 145-165koz PGM (6E basis) and 1.50-1.65Mt chrome concentrates. Most recent (Q3 2026, quarter ended 30 Jun 2026): group cash of $198.8 million against debt of $188.1 million, a net cash position of $10.7 million (down from a $54 million net cash position at H1 2026-end, reflecting underground-mining-fleet and growth capex). Commodity modeled as OTHER (PGM + chrome co-production) -- this repo's Commodity enum has no dedicated PGM category.

Notable vs. Peers

  • All-in sustaining cost of 268 is 73% lower than the peer producer average of 988.5.

Lifecycle Milestones

Grassroots
Resource Def.
PEA
PFS
Feasibility
Permitting
Construction
ProductionCurrent

Construction Milestones

5 of 5 reached
  1. Sep 2008 · Mining Right for the Tharisa Mine granted by the Department of Mineral Resources and Energy (DMRE) for an initial 30-year period, covering 5,475+ hectares near Rustenburg. (Prospecting rights for the same ground had been granted to Thari Resources Feb/Mar 2006-2007 and were transferred to Tharisa Minerals.) · Source
  2. Reached — date not disclosed · Task #922: written as a real, undated MinerConstructionMilestone row (achievedDate intentionally null). Tharisa's flagship Tharisa Mine (Bushveld Complex, South Africa) demonstrably reached a construction decision: mining rights were granted Sept 2008 (this miner's own PERMIT_GRANTED row) and trial mining commenced the very next month, Oct 2008, funded by a Dec 2008 US$65M seed capital raise. Consolidating this miner's own constructionMilestone:CONSTRUCTION_DECISION MetricStatus research (Task #693 re-check, second pass after Task #430 batch 8, which also tested and eliminated Karo Platinum/Zimbabwe and the Apollo/Orion underground project as alternative anchors -- Tharisa's PRODUCTION status derives from the Tharisa Mine, not Karo): the mine was built by a private predecessor structure years before Tharisa's Apr 2014 JSE listing, and no FID entry exists anywhere in the company's own published history page despite two independent research passes. Recorded as reached-but-undated rather than misdating the 2008 seed-capital raise or 74% acquisition (both real events, neither a construction decision) into a decision date.
  3. Reached — date not disclosed · Trial mining at the Tharisa Mine commenced October 2008, immediately following the September 2008 mining-right grant. Exact day within October not confirmed from available sourcing -- recorded reached-but-undated. · Source
  4. Reached — date not disclosed · Production of the first chrome concentrate at Tharisa Mine started November 2009. Exact day not confirmed from available sourcing -- recorded reached-but-undated. · Source
  5. Reached — date not disclosed · Genuinely reached with a clean single-asset story, but only month/year precision was found (no specific day): Tharisa's namesake Tharisa Mine (co-producing PGMs and chrome, Bushveld Complex, South Africa) produced its first chrome concentrate in November 2009. Rather than guess a specific day, achievedDate is left null (matching the Bellevue Gold precedent, batch4). Karo Platinum (Zimbabwe) remains a development-stage project, not yet producing, and the Tharisa Mine remains the company's sole current producing asset. This row was missing entirely prior to 2026-08-21 -- a genuine data gap, not a stage error; Miner.stage was already correctly PRODUCTION. · Source

Milestones are recorded only from a company's own dated disclosure. A milestone with no date shown is one we can confirm was reached but for which no date was disclosed — we don't estimate one. "Not yet reached" means exactly that, not that a date is missing. An "Expected" line likewise only ever reflects the company's own guidance (e.g. a study or permit decision targeted for a stated quarter) — most not-yet-reached milestones have none, and that absence means no such guidance has been disclosed, not that one is overdue.

10/10
Weak track recordStrong track record
6.1/10
Thin runwayWell-capitalized
6/10
High riskLow risk
How this is calculated
10/10
Weaker depositStronger deposit
8/10
Weaker profileStronger profile
Price Chart
$1.19$1.32$1.82$1.66$1.72AugNovFebJunSep
Aug 12, 2025Sep 4, 2026
News
$1.72
+47.3%from low-12.3%from high
$1.17$1.96
See who ↓
3.6%
Low alignmentHigh alignment
See who ↓
2.3%
Low alignmentHigh alignment
$368.8M
Far belowFar above
$80.6M median
Price (USD - Local)
$1.72 - GBP 1.27
Cash Position (USD)
$198.8M
Far belowFar above
$65.6M median
Debt (USD)
$188.1M
Far aboveFar below
$24.9M median
$358.1M
Far belowFar above
$83.9M median
296.3M
Far aboveFar below
232.4M median
Jurisdiction
South Africa
This company's data hasn't been researched yet
This company's data hasn't been researched yet
This company's data hasn't been researched yet
Open pit, transitioning to underground (Bushveld Complex PGM + chrome)
68 yrs
Far belowFar above
20 yrs median
All-In Sustaining Cost
This company's data hasn't been researched yet
Not enough peer data yet
This company's data hasn't been researched yet
Not enough peer data yet
25%
Far belowFar above
44% median
3.6%
0%100%
27.2% median
2.3%
0%100%
0% median
1692 kmfrom CMOC Group Limited's Tenke Fungurume
Outside typical bolt-on range
This company's data hasn't been researched yet
This company's data hasn't been researched yet
This company's data hasn't been researched yet
This company's data hasn't been researched yet
This company's data hasn't been researched yet
Acquisition Susceptibility
2.7/10
Unlikely bolt-onFits the takeout profile

A relative ranking of how closely this company matches the profile of juniors that have actually been acquired — not a probability, and not a reason to buy. Acquisitions are rare: only a few dozen significant deals happen a year across a universe of thousands of juniors, so even a high score here describes a long shot. The strongest signal the underlying research identifies — whether a major already holds a JV, earn-in, or 5–19.9% strategic stake — isn't tracked yet and is absent from this score.

Overall Score Trend
+31.1% since 2026-08-08

Your Rankings

Community Sentiment
SELLINGBUYING
CategoryCommunityYour Ranking
Overall (0)Log in to rank
Management (0)Log in to rank
Financials (0)Log in to rank
Jurisdiction (0)Log in to rank
Project Quality (0)Log in to rank

Management Team

Chief Executive Officer of Tharisa plc.

Chief Financial Officer and Executive Director of Tharisa plc, effective 1 Aug 2026 (CFO designate from 1 May 2026), succeeding the retiring Michael Jones -- missing from this DB entirely before this batch (only CEO Phoevos Pouroulis was tracked). A seasoned mining-finance executive with over 25 years of experience across the diamond and PGM sectors: finance manager at Anglo American Platinum (now Valterra Platinum, already tracked in this DB, VALT) 2001-2006; joined Petra Diamonds Limited (not separately tracked in this DB) in 2006 as group finance manager, becoming CFO in 2016 through 2024, when he departed for personal reasons.

Insiders, Investors & Smart Money

Notable shareholders and insiders whose involvement is worth knowing about, plus what we're seeing from institutional/large-investor activity.

Smart money
1/10

Checked thoroughly: institutional ownership is negligible and no named specialist is on record. One senior officer bought stock on the open market in January 2026, the only qualifying insider activity found; all other insider-register 'Buy Back' entries are the company's own treasury share repurchases.

No notable insiders tracked for this miner yet.

Reports, Presentations & Documents

Technical Report Takeaways

Tharisa Mine (Bushveld Complex, South Africa): underground development (Apollo + Orion complexes) is the next phase of this company's sole mine, first blast broke through 31 Mar 2026, on time/budget as of Jul 2026. Underground Measured+Indicated Resource 60.7Mt @ 1.71 g/t 6E PGM + 19% Cr2O3; Proved+Probable Reserve 30.4Mt @ 1.45 g/t 6E PGM + 16.4% Cr2O3 (effective per the 3 Oct 2025 disclosure). Capital cost US$547 million total (Apollo US$363M, Orion US$184M). IRR disclosed as 'above 25%' at a US$1,633/oz PGM basket price assumption -- a threshold statement, not an exact point figure, recorded here as 25 (floor value) per the company's own wording. NO project-specific NPV has been disclosed for the underground project despite the IRR being stated -- checked directly, confirmed genuinely absent, not an oversight. MINE LIFE: current open pit has an estimated 7-9 years of remaining life as of the source article (through roughly 2033-2035); underground unlocks 'at least 60 years of additional life'; combined total life-of-mine is described as approximately 67-69 years from the article's own May 2026 vantage point -- not a single point figure the company itself states, approximated here (see mineLifeYears note) the same way Karowe Underground's ~12/~15yr figures were approximated (LUC, this wave 6 batch). ouncesFound was deliberately left unwritten this pass: the only current (Oct 2025), clean M+I figure available is underground-only (60.7Mt @ 1.71g/t = ~3.34Moz); the open-pit reserve component on record elsewhere (113.1Mt @ 1.09g/t, ~4Moz PGM) is a stale Sep 2021 figure, 5 years old, and a current 2025 combined Mineral Resource and Mineral Reserve Statement exists (minedocs.com/30/Tharisa-MRE-2025.pdf) but its exact combined figures could not be extracted this pass (undecodable PDF via available tools). Writing a partial (underground-only) or stale-mixed total would misrepresent the whole-mine figure -- recorded as a confirmed gap instead, per the ODY/RSG precedent (Task #317 wave 5 batch 3).