JUNIORMETRICS

TG Metals Limited

TG6·US$0.13 (AUD 0.18)·US$17.1M cap
Goldalso:Van Uden gold (JORC 2012 resource, 270,800oz Au); Burmeister lithium (exploration target only), Western Australia Map

TG Metals Limited is a gold and lithium explorer-developer in Western Australia. Its Van Uden gold project, in which it holds an 80% interest, carries a JORC 2012 mineral resource of 7.9Mt at 1.06 g/t Au for 270,800oz, comprising 4.557Mt at 1.04 g/t Au (152,600oz) Indicated and 3.378Mt at 1.09 g/t Au (118,200oz) Inferred. A scoping study released on 29 September 2026 outlines a 250,000 tonne-per-year heap-leach operation on the gold-bearing laterite at surface (1.053Mt at 0.52 g/t Au for 17,700oz) over an initial mine life of about three years, recovering about 13,630oz of gold. Its Burmeister lithium project carries only a non-JORC-compliant exploration target, not a resource estimate.

Notable vs. Peers

  • Financials score of 1.8/10 is weaker than the peer average of 5.3/10.

Lifecycle Milestones

Grassroots
Resource Def.
PEACurrent
PFS
Feasibility
Permitting
Construction
Production
Prior Ownership & Infrastructure
Road Access1 of 4 checked, 1 in place

Not yet determined: mill, tailings facility, grid power.

5.4/10
Weak track recordStrong track record
5.4/10 vs.
1.8/10
Thin runwayWell-capitalized
1.8/10 vs.
How this is calculated
3.4/10
Weaker depositStronger deposit
3.4/10 vs.
How this is calculated
8.2/10
Harder place to buildEasier place to build
8.2/10 vs.
What goes into it
  • Jurisdiction (40%)9/10

    Western Australia: Fraser PPI 2025 is 88.53 of 100 (rank 13 of 68), which maps to 9 on this site's scale. Both Van Uden (gold) and Burmeister (lithium) are in Western Australia -- Tier-1 mining jurisdiction.

  • Infrastructure (40%)6.4/10

    Confirmed road access at Van Uden Gold Project, Forestania Greenstone Belt, Western Australia; existing mill, grid power, and tailings facility not yet researched, counted at a neutral 5/10 until established.

  • Nearby producing mine (20%)10/10

    Mt Holland (Earl Grey) (Covalent Lithium Pty Ltd) is 12 km away -- within shared-mill trucking range.

4.7/10
Weaker profileStronger profile
4.7/10 vs.
Price Chart
$0.109$0.131$0.092$0.138$0.129AugDecMarJulOct
Aug 12, 2025 – Oct 20, 2026
Stage changeNews
$0.13
+44.6%from low-50.5%from high
$0.087$0.26
See who ↓
40.4%
Low alignmentHigh alignment
40.4% vs.
See who ↓
9.8%
Low alignmentHigh alignment
9.8% vs.
$17.1M
Far belowFar above
$17.1M vs. $22.1M peer median
Price (USD - Local)
US$0.13 (AUD 0.18)
Cash Position (USD)
$444.2K
Far belowFar above
$444.2K vs. $3.4M peer median
Debt (USD)
Far aboveFar below
$0 vs. $0 peer median
$16.7M
Far belowFar above
$16.7M vs. $19.4M peer median
135.5M
Far aboveFar below
135.5M vs. 154.2M peer median
Jurisdiction
Australia
152,600 oz
Feeds Deposit Quality score
Indicated152,600 oz
Inferrednot scored118,200 oz
Total resource270,800 oz
Far belowFar above
152.6K oz vs. 1.3M oz peer median
Compares M&I only — Inferred isn't compared or scored.
$109.23/oz
M&I
Total resource (incl. Inferred)$61.55/oz
Peer median $68.74/oz
Far aboveFar below
$109.23/oz vs. $132.67/oz peer median
Cut-off: 0.30 g/t Au primary / 0.10 g/t Au laterite
Van Uden: scoping-study stage (heap leach of the laterite resource), no active mine. Burmeister: exploration-target stage, not JORC-compliant.
3 yrs2026 study
Far belowFar above
3 yrs vs. 11.1 yrs peer median
$1,985/oz2026 study
$12.7M2026 study · gold deck US$4,400 vs spot US$4,114/oz
Far belowFar above
$12.7M vs. $603M peer median
1.69x2026 study · gold deck US$4,400 vs spot US$4,114/oz
Far aboveFar below
1.69x vs. 0.32x peer median
1.64x2026 study · gold deck US$4,400 vs spot US$4,114/oz
Far aboveFar below
1.64x vs. 0.29x peer median
$9.9M2026 study
Far aboveFar below
$9.9M vs. $293.2M peer median
1.3xBelow Durrett's 2:1 bar2026 study · gold deck US$4,400 vs spot US$4,114/oz
Far belowFar above
1.3x vs. 2.4x peer median
$4,400/oz7% above spot ($4,114/oz)2026 study
87%Clears Durrett's 25% developer bar2026 study · gold deck US$4,400 vs spot US$4,114/oz
Far belowFar above
87% vs. 43% peer median
40.4%
0%100%
40.4% vs. 12.1% peer median
9.8%
0%100%
9.8% vs. 3.3% peer median
12 kmfrom Covalent Lithium Pty Ltd (Wesfarmers 50% / SQM 50%)'s Mt Holland (Earl Grey)
Within shared-mill range (~20km)
-$4.3M
Far belowFar above
-$4.3M vs. -$3.3M peer median
-$0.032
Far belowFar above
-$0.032 vs. -$0.018 peer median

Acquisition Susceptibility

How this is calculated
8.1/10
Unlikely bolt-onFits the takeout profile

A relative ranking of how closely this company matches the profile of juniors that have actually been acquired — not a probability, and not a reason to buy. Acquisitions are rare: only a few dozen significant deals happen a year across a universe of thousands of juniors, so even a high score here describes a long shot. The strongest signal in the research, a producer that already owns part of the company, is scored from its disclosed strategic shareholders. A producer that is a joint-venture or earn-in partner on the project, rather than a shareholder, isn't captured yet.

How this score is built

  • Disclosed pending deal
    Sub-score: Not scored

    No pending acquisition or merger disclosed (checked)

    Not scored: having no deal in flight isn't held against a company.

    Weight 26.25%
  • Producer's strategic stake
    Sub-score: Not scored

    No producer holds a disclosed stake on file (holder register researched) See holders

    Not scored: most juniors that do get bought had no prior toehold, so a missing stake says little either way.

    Weight 25%
  • Distance to a producing mine
    Sub-score:
    8.9/10

    Nearest producing mine: Mt Holland (Earl Grey) (Covalent Lithium Pty Ltd), 12 km

    10 next to a producing mine, 8 at 20 km, 5 at 50 km, 0 beyond 200 km.

    Weight 22.5% · 46% here
  • Lifecycle stage
    Sub-score:
    6/10

    Stage: Preliminary Economic Assessment

    Feasibility and permitting score 10, where deals cluster, and production 5.5; earlier stages score less, down to 1 at grassroots.

    Weight 15% · 31% here
  • Jurisdiction
    Sub-score:
    9/10

    Australia: jurisdiction score 9/10

    Our jurisdiction score, used as is: higher means lower political and permitting risk.

    Weight 6.75% · 14% here
  • Commodity
    Sub-score:
    10/10

    Primary commodity: Gold

    Gold 10, copper 8, silver 5, nickel and uranium 4, others 2: most majors' deals are for gold.

    Weight 4.5% · 9% here

Weight is each input's share of the full score. “Here” is its share of this company's score: inputs that aren't scored are left out and the rest re-weighted, never counted as zero.

Overall Score Trend
-6% since 2026-08-11 · -28.8% from peak

Your Rankings

Community Sentiment
—SELLINGBUYING
CategoryCommunityYour Ranking
Overall— (0) 
Management— (0) 
Financials— (0) 
Jurisdiction— (0) 
Project Quality— (0) 

Management Team

Chief Executive Officer of TG Metals Limited. Geologist (BSc Geology, FAusIMM) with expertise in nickel deposits and base metals, leading the company's Van Uden Gold Project and Burmeister lithium deposit at Lake Johnson in Western Australia.

Non-Executive Chairperson of TG Metals Limited. Holds a BAppSc and is a Member of the Australian Institute of Company Directors (MAICD), with experience as Managing Director/CEO for listed and unlisted companies.

Insiders, Investors & Smart Money

Notable shareholders and insiders whose involvement is worth knowing about, plus what we're seeing from institutional/large-investor activity.

Smart money
1/10

1832 Asset Management (Scotiabank's Dynamic Funds arm) holds a real 9.81% stake -- a generalist Canadian manager, not a resource specialist. Beyond that, no producer, major, or named resource-specialist fund holds a disclosed stake -- a direct Sprott check was empty -- and the only director share movement found was a no-cash performance-rights conversion rather than a real purchase.

No notable insiders tracked for this miner yet.

Reports, Presentations & Documents

Technical Report Takeaways

TG Metals explores for gold and lithium in Western Australia, and its main asset is the Van Uden gold project, in which it holds an 80% interest. Van Uden's JORC resource is 152,600 oz of gold indicated in 4.557Mt at 1.04 g/t, with no measured category, plus 118,200 oz inferred. A scoping study released on 29 September 2026 for a 250,000 tonne-per-year heap-leach operation on the gold-bearing laterite at surface gives a post-tax NPV of US$12.67M and an 86.5% post-tax IRR over a 3-year mine life at a gold price of US$4,400/oz, recovering about 13,630oz of gold. Its Burmeister lithium project has only a non-JORC exploration target, not a resource estimate.