JUNIORMETRICS
Gold$4,479.95/oz
Silver$66.98/oz
Copper$6.00/lb

Teck Resources LimitedT

TECK-B·$68.61·$34.5B cap
Copperalso:Quebrada Blanca Phase 2 (QB2), Tarapaca Region, Chile (Teck 60% via an indirect interest, Sumitomo 30%) -- Teck's newest major asset and current growth anchor Map

Teck Resources Limited (TSX: TECK.B / NYSE: TECK) is a Vancouver-headquartered, Canadian base-metals producer that completed a major portfolio transformation in 2024, selling a majority stake in its steelmaking-coal business (Elk Valley Resources) to Glencore and repositioning as a copper-and-zinc-focused 'energy transition metals' producer -- it is NOT a diversified copper/zinc/coal major today. Highland Valley Copper (opened 1962, near Logan Lake, BC) is Canada's largest open-pit copper mine and Teck's original flagship. Red Dog (Alaska) is one of the world's largest zinc mines, operated under an agreement with NANA Regional Corporation, an Alaskan Native corporation; Trail Operations (BC) is one of the world's largest integrated zinc/lead smelting and refining complexes (smelting there since 1916 under predecessor Cominco). Teck also holds an interest in Antamina (Peru, copper-and-zinc). The company's current growth anchor is Quebrada Blanca Phase 2 (QB2, Chile): environmental approval Aug 2018, the board approved full construction Dec 2018 (alongside a US$1.2 billion Sumitomo transaction for a 30% stake that cut Teck's own equity contribution from an estimated US$4.739 billion to ~US$693 million), first mass concrete pour 20 May 2019, first bulk copper concentrate 31 Mar 2023 (after Covid-19-driven delays pushed the originally-targeted H2 2021 start), and an initial 27-year mine life with significant further expansion potential -- one of the largest undeveloped copper resources in the world at sanction. QB2 was operating near design throughput by late 2023, though a later (Oct 2024) analyst report described it as still around 75% of design capacity months into 2024, so no single clean 'commercial production' / full-design-capacity date is used here (see technicalReportNote). FY2025 revenue was $10.76 billion (copper 54% / zinc 24% / other 22%), up from $9.07 billion in FY2024.

Notable vs. Peers

  • Trading within 7% of its 52-week high — strong recent price momentum.

Lifecycle Milestones

Grassroots
Resource Def.
PEA
PFS
Feasibility
Permitting
Construction
ProductionCurrent

Construction Milestones

5 of 5 reached
  1. Aug 2018 · The regional Environmental Committee of Tarapaca voted to approve QB2's Environmental Impact Assessment on 8 Aug 2018 -- Teck's own primary announcement of this regulatory approval. Full-date precision. · Source
  2. Dec 2018 · Teck's board approved QB2 for full construction on 4 Dec 2018, announced alongside the US$1.2 billion Sumitomo Metal Mining/Sumitomo Corporation transaction for a 30% project stake (which cut Teck's own required equity contribution from an estimated US$4.739 billion to ~US$693 million) -- first production was targeted for H2 2021 at the time (later delayed; see FIRST_PRODUCTION). Full-date precision, primary-company-announcement sourced. · Source
  3. May 2019 · QB2's first mass concrete pour (~1,300 m3 for the concentrator-area foundation) took place 20 May 2019, a genuine physical-construction-start milestone distinct from the Dec 2018 board decision. Full-date precision. · Source
  4. Mar 2023 · Teck announced QB2 produced its first bulk copper concentrate on 31 Mar 2023 -- roughly 18 months later than the Dec 2018 target of H2 2021, reflecting well-documented Covid-19-era construction delays and cost overruns. Full-date precision, primary-company-announcement sourced. · Source
  5. Reached — date not disclosed · No single clean 'commercial production declared' date was found this pass -- QB2's ramp-up was gradual and its status through 2023-2024 is genuinely contested in available coverage: Teck's own year-end reporting described operations at or above design throughput capacity by late 2023, but a separate Oct 2024 analyst report described the mine as still around 75% of design capacity several months into 2024. Row exists to satisfy the stage=PRODUCTION lifecycle-gate check (src/lib/lifecycle-gates.ts), which per Task #619/#620 precedent applies cumulatively at CONSTRUCTION-or-later stages -- left undated rather than picking a date this pass could not actually confirm. · Source

Milestones are recorded only from a company's own dated disclosure. A milestone with no date shown is one we can confirm was reached but for which no date was disclosed — we don't estimate one. "Not yet reached" means exactly that, not that a date is missing. An "Expected" line likewise only ever reflects the company's own guidance (e.g. a study or permit decision targeted for a stated quarter) — most not-yet-reached milestones have none, and that absence means no such guidance has been disclosed, not that one is overdue.

Weak track recordStrong track record
6/10
Thin runwayWell-capitalized
8/10
High riskLow risk
How this is calculated
10/10
Weaker depositStronger deposit
8/10
Weaker profileStronger profile
Price Chart
$33.18$43.32$54.63$61.92$68.61AugNovMarJunSep2
Aug 26, 2025Sep 4, 2026
News
$68.61
+118.7%from low-3.9%from high
$31.37$71.40
$34.5B
Far belowFar above
$1.5B median
Price (USD - Local)
$68.61 - CAD 94.96
Cash Position (USD)
$4.4B
Far belowFar above
$94M median
Debt (USD)
$3.5B
Far aboveFar below
$121.9M median
$33.6B
Far belowFar above
$1.4B median
490.6M
Far aboveFar below
670.9M median
Jurisdiction
Canada
This company's data hasn't been researched yet
This company's data hasn't been researched yet
This company's data hasn't been researched yet
Open pit (Highland Valley Copper, QB2, Antamina) and open pit (Red Dog)
27 yrs
Far belowFar above
14 yrs median
This company's data hasn't been researched yet
Not enough peer data yet
This company's data hasn't been researched yet
Not enough peer data yet
This company's data hasn't been researched yet
This company's data hasn't been researched yet
This company's data hasn't been researched yet
This company's data hasn't been researched yet
This company's data hasn't been researched yet
This company's data hasn't been researched yet
This company's data hasn't been researched yet
This company's data hasn't been researched yet
Acquisition Susceptibility
6.6/10
Unlikely bolt-onFits the takeout profile

A relative ranking of how closely this company matches the profile of juniors that have actually been acquired — not a probability, and not a reason to buy. Acquisitions are rare: only a few dozen significant deals happen a year across a universe of thousands of juniors, so even a high score here describes a long shot. The strongest signal the underlying research identifies — whether a major already holds a JV, earn-in, or 5–19.9% strategic stake — isn't tracked yet and is absent from this score.

Overall Score Trend
+0% since 2026-08-26

Your Rankings

Community Sentiment
SELLINGBUYING
CategoryCommunityYour Ranking
Overall (0)Log in to rank
Management (0)Log in to rank
Financials (0)Log in to rank
Jurisdiction (0)Log in to rank
Project Quality (0)Log in to rank

Management Team

President and Chief Executive Officer of Teck Resources Limited since 1 November 2023.

Executive Vice President and Chief Financial Officer of Teck Resources Limited.

Chair of the Board of Teck Resources Limited.

Insiders, Investors & Smart Money

Notable shareholders and insiders whose involvement is worth knowing about, plus what we're seeing from institutional/large-investor activity.

Smart money

No smart-money tracking (institutional/large-investor activity) for this miner yet — this is a planned feature, not live data.

No notable insiders tracked for this miner yet.

Reports, Presentations & Documents

Technical Report Takeaways

Multi-asset producer (Highland Valley Copper, Red Dog, Antamina, QB2, Trail smelter/refinery) -- no single consolidated corporate-level dcfNpvUsd/irrPct/technicalReportPriceAssumptionUsd figure disclosed, same structural gap as this backlog's other multi-asset majors. mineLifeYears (27 years) is QB2-specific -- Teck's own newest, best-documented, still-ramping project, and its milestone history below is anchored to QB2 rather than to the much-older Highland Valley Copper/Red Dog assets for the same 'cleanest available dated history' reason NXE/DML/Motheo (SFR, this batch) were used as milestone anchors elsewhere in this backlog. ouncesFound is deliberately left null per this repo's still-open Task #324 ouncesFound/copper-unit policy question, same convention as this backlog's other copper majors.