JUNIORMETRICS

Surge Copper Corp.

SRGXF·SURG·US$0.32 (CAD 0.45)·US$122.8M cap
Copperalso:Berg Copper-Molybdenum-Gold-Silver Project, British Columbia Map

Surge Copper's 100%-owned Berg project in central British Columbia is a large-scale, standalone open-pit copper-molybdenum project with associated gold and silver credits. A June 2026 Pre-Feasibility Study, anchored by a formally declared reserve, reported an after-tax NPV8% of C$4.6 billion and 24% IRR, supported by planned connection to BC's low-carbon hydroelectric grid and existing regional road access. A 1.0 billion tonne inferred resource at 0.16% copper represents further exploration upside beyond the PFS reserve base.

Lifecycle Milestones

Grassroots
Resource Def.
PEA
PFSCurrent
Feasibility
Permitting
Construction
Production
Prior Ownership & Infrastructure
Berg Copper-Molybdenum-Gold-Silver Project, British Columbia
Road Access2 of 4 checked, 1 in place

Not in place: grid power. Not yet determined: mill, tailings facility.

Combined view across 2 projects. Figures below are only combined where the underlying basis genuinely matches -- see the notes under each.

Combined resource
8.2B lb Cu
Sum of 2 of 2 projects with a disclosed figure
IRR, per project
  • 23.8%Berg Copper-Molybdenum-Gold-Silver Project, British Columbia
Each project's own figure -- IRR is not additive across independent projects, so these are never combined
Mine life, per project
  • 28 yrsBerg Copper-Molybdenum-Gold-Silver Project, British Columbia
Each project's own figure -- independent mine lives are never added or averaged
Combined NPV, by discount-rate basis
$3.4B
At 8% discount rate -- Berg Copper-Molybdenum-Gold-Silver Project, British Columbia
6/10
Weak track recordStrong track record
6/10 vs.
6.4/10
Thin runwayWell-capitalized
6.4/10 vs.
How this is calculated
6.6/10
Weaker depositStronger deposit
6.6/10 vs.
How this is calculated
6.6/10
Harder place to buildEasier place to build
6.6/10 vs.
What goes into it
  • Jurisdiction (40%)9/10

    British Columbia: Fraser PPI 2025 is 74.28 of 100 (rank 31 of 68), which maps to 9 on this site's scale. British Columbia, Canada — top-tier mining jurisdiction with access to hydroelectric grid power, though Indigenous consultation on Wet'suwet'en territory is a live, project-specific consideration.

  • Infrastructure (40%)5/10

    Confirmed road access and no confirmed grid power at Berg Copper-Molybdenum-Gold-Silver Project, British Columbia; existing mill and tailings facility not yet researched, counted at a neutral 5/10 until established.

  • Nearby producing mine (20%)Not yet researched

    No producing mine within 50 km in our reference list (nearest listed: Blackwater (Artemis Gold Inc.), 178 km). That list doesn't cover every mining district yet, so a longer distance isn't scored as remote.

6.4/10
Weaker profileStronger profile
6.4/10 vs.
Price Chart
$0.115$0.301$0.423$0.323$0.327AugDecAprJulOct2
Aug 12, 2025 – Oct 20, 2026
News
$0.32
+125.5%from low-51%from high
$0.14$0.65
$122.8M
Far belowFar above
$122.8M vs. $28M peer median
Price (USD - Local)
US$0.32 (CAD 0.45)
Cash Position (USD)
$13.5M
Far belowFar above
$13.5M vs. $3.8M peer median
Debt (USD)
Far aboveFar below
$0 vs. $0 peer median
$109.3M
Far belowFar above
$109.3M vs. $25.5M peer median
388.1M
Far aboveFar below
388.1M vs. 171.1M peer median
Jurisdiction
Canada
8,191,000,000 lb Cu
Feeds Deposit Quality score
Measured832,000,000 lb Cu
Indicated7,359,000,000 lb Cu
Inferrednot scored4,052,000,000 lb Cu
Total resource12,243,000,000 lb Cu
Far belowFar above
8.2B lb vs. 2.1B lb peer median
Compares M&I only — Inferred isn't compared or scored.
$0.013/lb
M&I
Total resource (incl. Inferred)$0.009/lb
Peer median $0.046/lb
Far aboveFar below
$0.013/lb vs. $0.088/lb peer median
Cut-off: MRE NSR cutoff C$8.00/t; Maiden Mineral Reserve (PFS) NSR cutoff C$9.25/t
Open pit
28 yrs2026 study
Far belowFar above
28 yrs vs. 17.5 yrs peer median
@8%$3.4B2026 study · copper deck US$4.75 vs reference US$6.14/lb
Far belowFar above
$3.4B vs. $1B peer median
0.04x2026 study · copper deck US$4.75 vs reference US$6.14/lb
Far aboveFar below
0.04x vs. 0.36x peer median
0.03x2026 study · copper deck US$4.75 vs reference US$6.14/lb
Far aboveFar below
0.03x vs. 0.28x peer median
$3.4B2026 study
Far aboveFar below
$3.4B vs. $546M peer median
1xBelow Durrett's 2:1 bar2026 study · copper deck US$4.75 vs reference US$6.14/lb
Far belowFar above
1x vs. 1.1x peer median
$4.75/lb23% below reference ($6.14/lb)2026 study
24%Below Durrett's 25% developer bar2026 study · copper deck US$4.75 vs reference US$6.14/lb
Far belowFar above
24% vs. 23% peer median
4.7%
0%100%
4.7% vs. 10.4% peer median
178 kmfrom Artemis Gold Inc.'s Blackwater
Outside typical bolt-on range
-$6.6M
Far belowFar above
-$6.6M vs. -$3.8M peer median
-$0.017
Far belowFar above
-$0.017 vs. -$0.018 peer median

Acquisition Susceptibility

How this is calculated
6.5/10
Unlikely bolt-onFits the takeout profile

A relative ranking of how closely this company matches the profile of juniors that have actually been acquired — not a probability, and not a reason to buy. Acquisitions are rare: only a few dozen significant deals happen a year across a universe of thousands of juniors, so even a high score here describes a long shot. The strongest signal in the research, a producer that already owns part of the company, is scored from its disclosed strategic shareholders. A producer that is a joint-venture or earn-in partner on the project, rather than a shareholder, isn't captured yet.

How this score is built

  • Disclosed pending deal
    Sub-score: Not scored

    No pending acquisition or merger disclosed (checked)

    Not scored: having no deal in flight isn't held against a company.

    Weight 26.25%
  • Producer's strategic stake
    Sub-score:
    10/10

    African Rainbow Minerals Limited holds 19.72% (reported 17 Aug 2026) See holders

    An operating producer's stake scores 8 at 5%, rising to 10 at 20% (the take-over-bid threshold) and holding there up to 50%.

    Weight 25% · 34% here
  • Distance to a producing mine
    Sub-score:
    0.7/10

    Nearest producing mine: Blackwater (Artemis Gold Inc.), 178 km

    10 next to a producing mine, 8 at 20 km, 5 at 50 km, 0 beyond 200 km.

    Weight 22.5% · 31% here
  • Lifecycle stage
    Sub-score:
    8/10

    Stage: Pre-Feasibility Study

    Feasibility and permitting score 10, where deals cluster, and production 5.5; earlier stages score less, down to 1 at grassroots.

    Weight 15% · 20% here
  • Jurisdiction
    Sub-score:
    9/10

    Canada: jurisdiction score 9/10

    Our jurisdiction score, used as is: higher means lower political and permitting risk.

    Weight 6.75% · 9% here
  • Commodity
    Sub-score:
    8/10

    Primary commodity: Copper

    Gold 10, copper 8, silver 5, nickel and uranium 4, others 2: most majors' deals are for gold.

    Weight 4.5% · 6% here

Weight is each input's share of the full score. “Here” is its share of this company's score: inputs that aren't scored are left out and the rest re-weighted, never counted as zero.

Overall Score Trend
+16.4% since 2026-08-01 · -7.2% from peak

Your Rankings

Community Sentiment
—SELLINGBUYING
CategoryCommunityYour Ranking
Overall— (0) 
Management— (0) 
Financials— (0) 
Jurisdiction— (0) 
Project Quality— (0) 

Management Team

Chief Executive Officer and Director of Surge Copper Corp. Previously an independent director of Adventus Mining Corporation until its 2024 sale to Silvercorp Metals for $200 million. Worked for investment banks including Macquarie Group, Stifel Financial and CIBC World Markets on mining transactions. Holds a physics/exploration geophysics degree from the University of Toronto and an MBA from INSEAD.

Vice President, Projects of Surge Copper Corp. Professional mining engineer with 17 years in operations and senior engineering roles, including a decade at Treasury Metals advancing projects through development stages; also worked at mining operations in Chile and Ontario. Holds mining engineering and MBA degrees from Queen's University and the Rotman School of Management.

Vice President, Environment and Regulatory Affairs of Surge Copper Corp. More than 20 years of senior leadership experience in British Columbia's public sector, with expertise in environmental assessment and permitting; recently served as Assistant Deputy Minister supporting major mining projects through regulatory processes. Holds a physical geography degree from the University of Calgary.

Chief Financial Officer of CopAur Minerals Inc. (TSXV: CPAU), and concurrently CFO & Corporate Secretary of Surge Copper Corp. and CFO of CANEX Metals Inc. and Excalibur Metals Corp. Holds a bachelor's degree in accounting and is a member of the Chartered Professional Accountants Association of British Columbia (CPA, CGA). Over 14 years of public sector experience, well versed in the financial reporting and compliance requirements of public companies. Source: copaur.com/our-team/.

President and Director of Surge Copper Corp., and concurrently President, CEO and Director of CANEX Metals Inc. Also a director of Jade Leader Corp. PhD in Geology from the University of Western Australia (1991-1995); over 30 years of gold, copper and base-metal exploration experience across North America, South America, Australia and Europe, including discovery involvement at the Bahuerachi copper deposit (Mexico), the Viking gold deposit (eastern Canada), and the West Seel Cu-Au porphyry (British Columbia). Registered Professional Geoscientist with APEGBC. Previously President & Director of Tyler Resources Inc.

Insiders, Investors & Smart Money

Notable shareholders and insiders whose involvement is worth knowing about, plus what we're seeing from institutional/large-investor activity.

Smart money
6/10

African Rainbow Minerals, a major diversified South African mining company, has built a 19.9% cash stake in Surge Copper across two strategic private placements. Two different directors bought shares on the open market in mid-to-late 2025.

No notable insiders tracked for this miner yet.

Reports, Presentations & Documents

Technical Report Takeaways

Surge Copper owns 100% of the Berg copper-molybdenum project in central British Columbia, a large open-pit deposit with gold and silver credits. Its June 2026 pre-feasibility study, anchored by a maiden mineral reserve, outlines a standalone open-pit mine connected to BC's hydroelectric grid and served by existing regional roads, and an inferred resource of 1.0 billion tonnes at 0.16% copper lies outside the reserve base. The Initial Project Description for Berg, submitted on 9 September 2026, was accepted by the BC Environmental Assessment Office and the federal Impact Assessment Agency of Canada, starting the provincial Early Engagement and federal Planning phases of environmental assessment. A 2026 field program of geotechnical drilling, hydrogeology and environmental baseline work is supporting feasibility-level engineering and permitting.

Recent News