Soma Gold Corp.
Soma Gold operates the El Bagre gold processing complex and 100%-owned Cordero underground mine within a 43,000-hectare package in Antioquia, Colombia. Q1 2026 revenue fell 19% year over year to CAD $22.5 million as the El Bagre mill restart after a labour-disruption shutdown was hampered by mechanical issues, with attributable cash costs at Cordero more than doubling year over year. The company is ramping higher-grade feed from satellite mines through H2 2026 toward a stated goal of 60,000+ oz/year by 2028.
Notable vs. Peers
- Financials score of 1.5/10 is weaker than the peer average of 6.5/10.
- Jurisdiction risk score of 4/10 is meaningfully riskier than the peer average of 7.8/10.
- Trading within 6% of its 52-week low — weak recent price momentum.
Lifecycle Milestones
Construction Milestones
5 of 5 reached- Aug 2020 · Soma Gold announced the granting of final permits needed to start construction of the Balvina Cordero access portal (issuing authority not named in the release itself). · Source
- May 2020 · No standalone FID/board-approval release was found distinct from the permit/construction-start announcement below; the closest equivalent corporate decision point is Soma's closing of its acquisition of Operadora Mineras S.A.S. (bringing in the El Bagre complex and setting up Cordero as the follow-on development). · Source
- Aug 2020 · Construction of the Balvina Cordero access portal commenced, per the same permit-grant release above; the company's own project materials describe broader Cordero mine development as beginning September 2020. · Source
- Reached — date not disclosed · Soma's Q1 2022 results release states milling of first ore from production stopes at the Cordero Mine began in Q1 2022 (exact day not disclosed) -- the true first-ore/first-gold milestone, distinct from and earlier than "commercial production," which Soma later declared effective January 1, 2023 as a formal ramp-up-complete designation. · Source
- Jan 2023 · Genuinely reached with a clean, single, well-documented date: Soma's own disclosure confirms commercial production at the Cordero mine (Colombia) was achieved effective 2023-01-01. Soma's legacy mines (La Ye, Los Mangos) were mined out and decommissioned in early 2023 and are not the basis; the separate El Limon Mill restart (targeting Q4 2026 for its OWN first production) is a distinct, not-yet-reached future initiative, also not the basis. Cordero is Soma's current flagship producing asset. This row was missing entirely prior to 2026-08-21 -- a genuine data gap, not a stage error; Miner.stage was already correctly PRODUCTION. · Source
Milestones are recorded only from a company's own dated disclosure. A milestone with no date shown is one we can confirm was reached but for which no date was disclosed — we don't estimate one. "Not yet reached" means exactly that, not that a date is missing. An "Expected" line likewise only ever reflects the company's own guidance (e.g. a study or permit decision targeted for a stated quarter) — most not-yet-reached milestones have none, and that absence means no such guidance has been disclosed, not that one is overdue.
A relative ranking of how closely this company matches the profile of juniors that have actually been acquired — not a probability, and not a reason to buy. Acquisitions are rare: only a few dozen significant deals happen a year across a universe of thousands of juniors, so even a high score here describes a long shot. The strongest signal the underlying research identifies — whether a major already holds a JV, earn-in, or 5–19.9% strategic stake — isn't tracked yet and is absent from this score.
Your Rankings
Management Team
CEO and Chairman of the Board of Soma Gold Corp. 40+ years as an entrepreneur across mining, oil & gas, construction, technology, and manufacturing; founded multiple companies since 1978; previously chaired Gold Source Mining Inc.
Chief Financial Officer of Soma Gold Corp. 25+ years in finance/operations across mining and tech; former CFO of Eastern Platinum, BQE Water, UEX Corporation, and Sandfire Resources America; economics degree from Western University.
VP Operations at Soma Gold Corp. 35+ years of mining operations expertise; B.Sc. Mining Engineering; former GM at CRG Mining Co. and Gold Road Mining Co.
VP Exploration at Soma Gold Corp. Registered professional geologist, 25+ years in mineral exploration; B.Sc. and M.Sc. in geology; multi-continent exploration-to-development experience.
VP Business Development at Soma Gold Corp. 10+ years in corporate finance/investment banking/M&A; former Director of Investment Banking, Mining & Metals; Master's from University of Strathclyde.
Colombia Country Manager for Soma Gold Corp. Mining metallurgist with a master's in project management; former GM at Luca Mining Corp. (Mexico); prior roles at First Majestic and GranColombia Gold.
VP Capital Markets at Soma Gold Corp. 17 years in corporate mining advisory, including 8 years as VP Capital Markets at Critical Elements Corp.; finance degree from HEC Montreal.
Insiders, Investors & Smart Money
Notable shareholders and insiders whose involvement is worth knowing about, plus what we're seeing from institutional/large-investor activity.
Independent Director Glenn Walsh, Soma Gold's largest shareholder at 42%, bought roughly CA$26-36 million of stock on the open market over the past year, though no producer or resource-specialist fund holds a stake and other insiders sold modestly in the most recent quarter.
No notable insiders tracked for this miner yet.
Reports, Presentations & Documents
SLR Consulting (Canada) Ltd. NI 43-101 Technical Report on the El Bagre Gold Mining Complex and Nechi Project (effective 31 Dec 2022, filed 16 Feb 2023; QPs Sean Horan P.Geo. and Marie-Christine Gosselin P.Geo.), per the 5 Jan 2023 PEA/MRE release: Combined Antioquia Indicated 665 kt @ 5.9 g/t Au for 127,000 oz (Cordero 355 kt @ 6.9 g/t for 78,000 oz + Nechi 310 kt @ 4.9 g/t for 49,000 oz) -- no Measured category at either deposit. A further 1,165 kt @ 7.4 g/t for 277,000 oz is Inferred (Cordero 761 kt @ 7.9 g/t for 192,000 oz + Nechi 405 kt @ 6.5 g/t), not included here per this repo's M+I-only convention. Cut-off grades 2.4 g/t Au (Cordero) / 3.1 g/t Au (Nechi). SCOPE CAVEAT: El Bagre Complex production is aggregated across Cordero plus smaller Aurora and El Limon feeder mines under one central mill; only Cordero and Nechi carry a compliant NI 43-101 estimate -- Aurora/El Limon are not covered by any Mineral Resource Estimate found this pass, so company-wide production tonnage exceeds what this 127,000 oz figure represents. Nechi itself has not yet reached production (targeted ~Q3 2027 start per company guidance) but its Indicated ounces are included here since SLR's compliant estimate covers it. The same PEA modeled a Cordero-only 3-year Life of Mine plan (2023-2025, average 44,376 oz/yr, after-tax NPV US$55.9M / pre-tax NPV US$94.6M at an 8% discount rate, US$1,700/oz gold price) -- that plan's window has fully elapsed as of this pass (Aug 2026) with production continuing uninterrupted and no updated PEA/FS filed, so dcfNpvUsd/irrPct/mineLifeYears are deliberately left null rather than citing an NPV/mine-life pair describing a mine plan that is now history. IRR was not disclosed in the 2023 PEA release in any case.