JUNIORMETRICS

Sky Metals Limited

SKYMF·SKY·US$0.12 (AUD 0.17)·US$114.9M cap
Multi-Metalalso:Tallebung Tin-Tungsten-Silver Project (~70km NW of Condobolin, central-western NSW, Australia) Map

Sky Metals Limited (formerly Planet Gas Limited, renamed June 2019; Orange, NSW-headquartered) is advancing the 100%-owned Tallebung tin-tungsten-silver project, a historic tin mining district in central-western NSW first worked in the 1890s. A pre-feasibility study (PFS) outlines a 3 Mtpa open-pit operation with an ~7-year initial mine life, producing an average 2,040t tin, 31,700 mtu WO3 and 315,000oz silver per year; pre-production capital of A$138.8M; pre-tax NPV at an 8% discount rate of ~A$438M and pre-tax IRR of 69%, with capital payback under 17 months. An updated Mineral Resource Estimate (13 Jul 2026) and progress into NSW's State Significant Development approval process support a near-term development timeline. Cash balance of A$17.6M at 30 Jun 2026.

Lifecycle Milestones

Grassroots
Resource Def.
PEA
PFSCurrent
Feasibility
Permitting
Construction
Production
Prior Ownership & Infrastructure
Road AccessGrid Power2 of 4 checked, 2 in place

Not yet determined: mill, tailings facility.

5.4/10
Weak track recordStrong track record
5.4/10 vs.
6/10
Thin runwayWell-capitalized
6/10 vs.
How this is calculated
Not yet researched
Weaker depositStronger deposit
How this is calculated
8.4/10
Harder place to buildEasier place to build
8.4/10 vs.
What goes into it
  • Jurisdiction (40%, counts 50% here)9/10

    New South Wales: Fraser PPI 2025 is 73.26 of 100 (rank 37 of 68), which maps to 9 on this site's scale. New South Wales, Australia -- Tier-1 mining jurisdiction.

  • Infrastructure (40%, counts 50% here)7.9/10

    Confirmed road access and confirmed grid power at Tallebung Tin-Tungsten-Silver Project (~70km NW of Condobolin, central-western NSW, Australia); existing mill and tailings facility not yet researched, counted at a neutral 5/10 until established.

  • Nearby producing mine (20%)Not counted: would not raise the score

    Mineral Hill (Kingston Resources Limited) is 45 km away and would score 8.3/10 on its own, but that is below what this company's other researched inputs already give it. A nearby producing mine can only raise this score, never lower it, so it isn't counted here.

6.2/10
Weaker profileStronger profile
6.2/10 vs.
Price Chart
$0.049$0.054$0.099$0.169$0.122AugDecMarJulOct
Aug 12, 2025 – Oct 20, 2026
News
$0.12
+167.5%from low-40.8%from high
$0.043$0.20
$114.9M
Far belowFar above
$114.9M vs. $15.6M peer median
Price (USD - Local)
US$0.12 (AUD 0.17)
Cash Position (USD)
$12.2M
Far belowFar above
$12.2M vs. $1.7M peer median
Debt (USD)
Far aboveFar below
$0 vs. $0 peer median
$102.7M
Far belowFar above
$102.7M vs. $12.5M peer median
992.3M
Far aboveFar below
992.3M vs. 232M peer median
Jurisdiction
Australia
PFS-stage, no active mine
7.25 yrs2026 study
Far belowFar above
7.3 yrs vs. 17.5 yrs peer median
$5,653/t Sn2026 study
@8%$216.5M(at $45,000/t Sn)2026 study
Far belowFar above
$216.5M vs. $614.7M peer median
0.53x2026 study
Far aboveFar below
0.53x vs. 0.08x peer median
0.47x2026 study
Far aboveFar below
0.47x vs. 0.08x peer median
$45,000/t Sn2026 study
57%Clears Durrett's 25% developer bar2026 study
Far belowFar above
57% vs. 28% peer median
31.7%
0%100%
31.7% vs. 19% peer median
45 kmfrom Kingston Resources Limited's Mineral Hill
Within regional-platform range (~50km)
-$7.5M
Far belowFar above
-$7.5M vs. -$2.9M peer median
-$0.008
Far belowFar above
-$0.008 vs. -$0.011 peer median

Acquisition Susceptibility

How this is calculated
6.4/10
Unlikely bolt-onFits the takeout profile

A relative ranking of how closely this company matches the profile of juniors that have actually been acquired — not a probability, and not a reason to buy. Acquisitions are rare: only a few dozen significant deals happen a year across a universe of thousands of juniors, so even a high score here describes a long shot. The strongest signal in the research, a producer that already owns part of the company, is scored from its disclosed strategic shareholders. A producer that is a joint-venture or earn-in partner on the project, rather than a shareholder, isn't captured yet.

How this score is built

  • Disclosed pending deal
    Sub-score: Not scored

    No pending acquisition or merger disclosed (checked)

    Not scored: having no deal in flight isn't held against a company.

    Weight 26.25%
  • Producer's strategic stake
    Sub-score: Not scored

    No producer holds a disclosed stake on file (holder register researched) See holders

    Not scored: most juniors that do get bought had no prior toehold, so a missing stake says little either way.

    Weight 25%
  • Distance to a producing mine
    Sub-score:
    5.5/10

    Nearest producing mine: Mineral Hill (Kingston Resources Limited), 45 km

    10 next to a producing mine, 8 at 20 km, 5 at 50 km, 0 beyond 200 km.

    Weight 22.5% · 46% here
  • Lifecycle stage
    Sub-score:
    8/10

    Stage: Pre-Feasibility Study

    Feasibility and permitting score 10, where deals cluster, and production 5.5; earlier stages score less, down to 1 at grassroots.

    Weight 15% · 31% here
  • Jurisdiction
    Sub-score:
    9/10

    Australia: jurisdiction score 9/10

    Our jurisdiction score, used as is: higher means lower political and permitting risk.

    Weight 6.75% · 14% here
  • Commodity
    Sub-score:
    2/10

    Primary commodity: Other

    Gold 10, copper 8, silver 5, nickel and uranium 4, others 2: most majors' deals are for gold.

    Weight 4.5% · 9% here

Weight is each input's share of the full score. “Here” is its share of this company's score: inputs that aren't scored are left out and the rest re-weighted, never counted as zero.

Overall Score Trend
-10.1% since 2026-08-12 · -21.5% from peak

Your Rankings

Community Sentiment
—SELLINGBUYING
CategoryCommunityYour Ranking
Overall— (0) 
Management— (0) 
Financials— (0) 
Jurisdiction— (0) 
Project Quality— (0) 

Management Team

Joined Sky Metals as geologist in 2019, progressed to Exploration Manager (2021), CEO (early 2022), Managing Director (Sept 2024). Previously with Evolution Mining and Alkane Resources on NSW discoveries.

Executive Chairman of Nickel Industries Limited since 2023; also Executive Chairman of Sky Metals Limited. BEcon, University of Sydney (1970). Over 40 years in full-time management of natural-resource companies in Australia and internationally, having chaired numerous public mining companies. Previously Chairman of Bolnisi Gold NL (1994-2007, also chairing the related Palmarejo Silver & Gold ULC from 2005) through their combined ~US$1.1bn acquisition by Coeur d'Alene Mines Corporation, completed 21 Dec 2007. Currently also Executive Chairman of Fulcrum Lithium Ltd. (founder, since 2023) and Chairman of Alpha HPA Limited, Minerals Exploration Limited and Sky Metals Limited. Earlier chairmanships at Kings Minerals NL (2001-2010), Viking Gold Corp. and San Anton Resource Corp. (2006-2010).

Executive Director of Sky Metals Limited. 30+ years in the mining sector spanning operations, commercial management, and project development; qualified mining engineer, former COO at PYBAR Mining Services.

Insiders, Investors & Smart Money

Notable shareholders and insiders whose involvement is worth knowing about, plus what we're seeing from institutional/large-investor activity.

Smart money
1/10

No producer, specialist resource fund, or clean on-market insider buying was found for Sky Metals. Executive Chairman Norman Seckold's largest disclosed holding movement was participation in new shares issued by the company (a placement-style acquisition), not a secondary-market purchase, and no other named holder above 5% reads as a resource specialist.

No notable insiders tracked for this miner yet.

Reports, Presentations & Documents

Technical Report Takeaways

Sky Metals owns 100% of the Tallebung tin-tungsten-silver project, a historic tin mining district about 70 km northwest of Condobolin in central-western New South Wales, and also holds the earlier-stage Doradilla tin project. A July 2026 resource update at Tallebung reported 32.7 Mt at 0.16% tin-equivalent, containing 36,800 t of tin and 9.94 Moz of silver as well as tungsten. The August 2026 pre-feasibility study, which uses only 66% of the current resources, plans a 3 Mtpa open-pit operation with a 7.25-year mine life producing an average of 2,040 t of tin, 31,700 mtu of tungsten trioxide and 315,000 oz of silver a year, and shows a post-tax NPV8% of US$216.5M (AUD 309.3M) and a 57.2% IRR at US$45,000/t tin, with an all-in sustaining cost of US$5,653/t of tin net of co-products. The project is in New South Wales' State Significant Development approval process.