Silver Bullet Mines Corp.

SBMI·$0.10·$14.9M cap
Silveralso:Black Diamond / KT Mine (Richmond Basin, Miami-Globe Copper Camp, Arizona, USA) Map

Silver Bullet Mines Corp. (TSXV: SBMI, OTCQB: SBMCF) is a small-scale silver-gold-copper producer in the western US. Its flagship Black Diamond Project (~5,000 acres, Richmond Basin, Miami-Globe copper camp, Arizona -- site of the original 1870s native-silver discoveries) includes the past-producing KT and SC Mines, from which the company has shipped five commercial gold/silver concentrate shipments (first received by buyer October 2025, first payment January 2026) and is processing material for a sixth; a new high-grade silver/gold vein was discovered at KT Mine in January 2026, with in-house assays of 7-27 oz/ton silver across 12 samples. The company also holds the past-producing Washington Mine near Idaho City, Idaho. No NI 43-101 resource estimate has been published; the operation is characterized as small-scale toll/direct-shipping production rather than an engineered mine plan.

Notable vs. Peers

  • Financials score of 5.2/10 is weaker than the peer average of 7.6/10.
  • Jurisdiction risk score of 9/10 is meaningfully safer than the peer average of 6.9/10.

Lifecycle Milestones

Grassroots
Resource Def.
PEA
PFS
Feasibility
Permitting
Construction
ProductionCurrent

Construction Milestones

5 of 5 reached
  1. Reached — date not disclosed · Same fact already documented on this miner's own existing CONSTRUCTION_DECISION row: King Tut is 'a previously-operated, already-permitted small mine bolted onto existing milling infrastructure, not a from-scratch build.' Silver Bullet's own July 23, 2025 acquisition release confirms King Tut 'comprises approximately 80 acres... located on BLM land' and states the company's own VP Mining, Ron Murphy, and his brother Dan Murphy 'mined King Tut as part of a team during the 1980's' -- but the same release states the company 'has not been able to find any documentation with respect to production at King Tut, which is part of the reason for the low acquisition cost.' Whatever BLM-claim-level authorization underlies the small-scale mining and immediate ore-shipping activity announced in that same release was therefore reused from the pre-existing 1980s-era claims, not a newly dated grant to Silver Bullet -- genuinely undocumented pre-history (honestly disclosed by the company itself), not an invented date. No dated 'permit granted' event was found nor is expected to exist given this small-scale BLM-claim structure. · Source
  2. Jul 2025 · Silver Bullet Mines announced acquisition of the King Tut Gold Mine in Arizona, with the same release stating the plan to 'commence the processing of King Tut material immediately' at the company's existing 125 tpd Arizona mill -- the acquisition itself is the company's real decision-equivalent event (a previously-operated, already-permitted small mine bolted onto existing milling infrastructure, not a from-scratch build). · Source
  3. Jul 2025 · No separately dated 'construction/mining start' release distinct from the acquisition announcement -- the same July 23, 2025 release states the initial plan was to 'mine and ship 50 tons per day from King Tut to the mill for processing' immediately. Dated to that release rather than inventing a distinct later date (same convention as the EDR/EQX rows in the Task #430 batch3 script). · Source
  4. Oct 2025 · Silver Bullet Mines announced shipment of its first commercial quantity of high-grade gold/silver concentrate from the KT (King Tut) Mine -- concentrate grade had been climbing through September (23.6 oz/ton Sept 18) and October (27 oz/ton Oct 1) ahead of this commercial shipment. · Source
  5. Sep 2024 · Genuinely reached with a clean, single, well-documented date: Silver Bullet's own press release is explicitly titled 'Silver Bullet Mines Commences Commercial Production of Third Party Mineralized Material,' dated 2024-09-24 -- the company's own first-ever declared commercial-production milestone. DIFFERENT ASSET AND REVENUE STREAM FROM THIS MINER'S OTHER MILESTONE ROWS -- READ THIS BEFORE 'CORRECTING' THE DATE. This row predates SBMI's own FIRST_PRODUCTION row (2025-10-24) by about thirteen months, which looks like a CONSTRUCTION_MILESTONE_ORDER contradiction and is not one. The two chains describe two distinct businesses SBMI runs under one ticker: (a) THIS ROW, 2024-09-24, is the MERCHANT / TOLL-PROCESSING stream -- per the release SBMI 'entered into an agreement (the "Agreement") to process high grade mineralized material from a past producing silver mine proximate to SBMI's Buckeye Silver Mine in Arizona,' a private property 'owned by an arm's length third party,' and 'has begun processing the material into saleable product, whether by way of concentrate or dore bar, thereby generating revenue,' with SBMI 'responsible for all logistics and [having] decision-making authority over the material' at an intended 50 tons per day. Processing runs through SBMI's '100%-owned mill and assay facility in Globe, Arizona.' Structurally similar to Dynacor's merchant-processing model (see the MERCHANT_PROCESSOR BusinessModel doc comment in prisma/schema.prisma), though SBMI itself is correctly classified OPERATOR because it also mines its own ore. (b) The CONSTRUCTION_DECISION and CONSTRUCTION_START rows (both 2025-07-23) and the FIRST_PRODUCTION row (2025-10-24) are SBMI's OWN King Tut (KT) gold mine in Arizona -- acquired 2025-07-23, first own-ore commercial concentrate shipped 2025-10-24. That chain is about ore SBMI mines itself; this row is about ore it buys and processes for a third party. Neither date is derived from the other and both are correct as recorded. MinerConstructionMilestone has no per-asset scoping (every row hangs off minerId alone), so this prose is the only place the distinction can live. CORRECTION (Task #662, verified against the primary source): this note previously stated the 2024 processing ran 'via its Nevada mill under a Mining and Milling Agreement.' Both details were wrong. SBMI has no Nevada mill -- its only mill is the 100%-owned Globe, ARIZONA facility named above, and the third-party material came from a past-producing silver mine in ARIZONA proximate to the Buckeye Silver Mine, not from Nevada. SBMI does hold Nevada ground (two early-stage exploration projects in the Tonopah silver-gold camp), which is the likely origin of the error, but none of it is a mill, none of it is producing, and none of it relates to this milestone. The release also never uses the capitalized term 'Mining and Milling Agreement' -- it calls it only 'the Agreement' -- so the mining-and-milling substance is quoted directly above instead. Not flagged `disputed`: research confirms the 2024-09-24 commercial production genuinely happened, so there is no doubt about the milestone itself to record (see the `disputed` doc comment on MinerConstructionMilestone). The out-of-order date is a schema-expressiveness limit, not a doubt. Since 2024-09-24 the company has added its own KT Mine / SC (Super Champ) Mine production in Arizona (first own-ore shipment October 2025) and two further past-producing Arizona mines (February 2026) -- continuation and expansion of the same growing business, not a reset of the original 2024-09-24 milestone. This row was missing entirely prior to 2026-08-21 -- a genuine data gap, not a stage error; Miner.stage was already correctly PRODUCTION. · Source

Milestones are recorded only from a company's own dated disclosure. A milestone with no date shown is one we can confirm was reached but for which no date was disclosed — we don't estimate one. "Not yet reached" means exactly that, not that a date is missing. An "Expected" line likewise only ever reflects the company's own guidance (e.g. a study or permit decision targeted for a stated quarter) — most not-yet-reached milestones have none, and that absence means no such guidance has been disclosed, not that one is overdue.

Weak track recordStrong track record
5.2/10
Thin runwayWell-capitalized
9/10
High riskLow risk
How this is calculated
Not enough info
Weaker depositStronger deposit
7.1/10
Weaker profileStronger profile
Price Chart
$0.129$0.154$0.165$0.111$0.101AugNovFebJunSep
Aug 12, 2025Sep 4, 2026
News
$0.10
+40.7%from low-63.9%from high
$0.07$0.28
See who ↓
13.9%
Low alignmentHigh alignment
See who ↓
0%
Low alignmentHigh alignment
$14.9M
Far belowFar above
$639.1M median
Price (USD - Local)
$0.10 - CAD 0.14
Cash Position (USD)
$265.1K
Far belowFar above
$87.5M median
Debt (USD)
$496.2K
Far aboveFar below
$11.2M median
$15.1M
Far belowFar above
$549.2M median
148.1M
Far aboveFar below
322.5M median
Jurisdiction
United States
This company's data hasn't been researched yet
This company's data hasn't been researched yet
This company's data hasn't been researched yet
Underground
This company's data hasn't been researched yet
This company's data hasn't been researched yet
Not enough peer data yet
This company's data hasn't been researched yet
Not enough peer data yet
This company's data hasn't been researched yet
13.9%
0%100%
12.1% median
0%
0%100%
7.7% median
This company's data hasn't been researched yet
This company's data hasn't been researched yet
This company's data hasn't been researched yet
This company's data hasn't been researched yet
This company's data hasn't been researched yet
Acquisition Susceptibility
6.3/10
Unlikely bolt-onFits the takeout profile

A relative ranking of how closely this company matches the profile of juniors that have actually been acquired — not a probability, and not a reason to buy. Acquisitions are rare: only a few dozen significant deals happen a year across a universe of thousands of juniors, so even a high score here describes a long shot. The strongest signal the underlying research identifies — whether a major already holds a JV, earn-in, or 5–19.9% strategic stake — isn't tracked yet and is absent from this score.

Overall Score Trend
-2.7% since 2026-08-12 · -2.7% from peak

Your Rankings

Community Sentiment
SELLINGBUYING
CategoryCommunityYour Ranking
Overall (0)Log in to rank
Management (0)Log in to rank
Financials (0)Log in to rank
Jurisdiction (0)Log in to rank
Project Quality (0)Log in to rank

Management Team

Chief Executive Officer and Director of Silver Bullet Mines Corp. Mining executive with over 40 years of experience with expertise in mineral processing.

Chief Financial Officer of Oreterra Metals Corp. (CPA, CA.) University of Toronto graduate and former BDO Canada LLP partner. Has built several public companies on the TSXV and CSE; extensive experience as CFO and director for both public and private companies.

Vice President, Mining and Director of Silver Bullet Mines Corp. Mining industry professional with more than 30 years of operational experience.

Vice President, Capital Markets and Director of Silver Bullet Mines Corp. Experienced lawyer, investment banker, shareholder-rights activist and public company executive.

Insiders, Investors & Smart Money

Notable shareholders and insiders whose involvement is worth knowing about, plus what we're seeing from institutional/large-investor activity.

Smart money
1/10

Three insiders bought on-market with real cash -- David Richardson (the company's largest insider) 1,714,286 shares at US$0.15 in August 2025, plus Peter Clausi and Brian Crawford 250,000 shares each at US$0.11 in May 2025 -- but all three purchases fall just outside the trailing 12 months as of this check, so they read as clean but stale buying rather than fresh conviction. No producer or specialist-fund stake was found.

No notable insiders tracked for this miner yet.

Reports, Presentations & Documents

Technical Report Takeaways

We haven't parsed this company's PEA/PFS/FS recommendations yet — cut-off grade, mine life, DCF/NPV, and the report's own next-steps guidance are a planned research pass, not live data for every company yet.