JUNIORMETRICS

Regis Resources Ltd

RGRNF·RRL·US$4.70 (AUD 6.70)·US$3.6B cap
GoldDuketon Gold Project, Western Australia (100%-owned; plus 30% JV interest in Tropicana and the McPhillamys development project, NSW) Map

Regis Resources is an ASX-listed gold producer whose core assets are the 100%-owned Duketon Gold Project (North Eastern Goldfields, WA) and a 30% joint-venture interest in the Tropicana Gold Mine (WA, operated by AngloGold Ashanti). FY26 (year ended 30 June 2026) group production reached 379koz (Duketon 236koz, Tropicana 143.1koz -- both at or above guidance) at a group AISC of A$2,945/oz, with a record debt-free cash-and-bullion position of A$1.18B (up A$667M during the year despite A$151M of dividends and A$156M of tax payments). FY27 guidance is 360-400koz group production at an AISC of A$2,990-3,390/oz. The company's growth project, McPhillamys (NSW, 100%-owned), cleared a major hurdle in mid-2026 when a new Pre-Feasibility Study identified an alternative filtered-tailings/integrated-waste-landform strategy that bypasses a 2024 federal Aboriginal heritage declaration that had blocked the original tailings storage facility design -- allowing Regis to reinstate the McPhillamys Ore Reserve at 56Mt / 1.89Moz gold. The PFS shows a post-tax NPV of A$1.13B and 21.8% IRR (at an A$4,000/oz gold price assumption), 190koz/yr average production over the first 9 of 9.4 total mine-life years, and A$1.08B pre-production capex; final investment decision is targeted for H1 CY2028. Jim Beyer is Managing Director and CEO.

Notable vs. Peers

  • Financials score of 9.9/10 is stronger than the peer average of 6.5/10.

Lifecycle Milestones

Grassroots
Resource Def.
PEA
PFS
Feasibility
Permitting
Construction
ProductionCurrent

Construction Milestones

5 of 5 reached
  1. Reached — date not disclosed · Source
  2. Reached — date not disclosed · Source
  3. Reached — date not disclosed · Source
  4. Jan 2010 · Source
  5. Reached — date not disclosed · Source

Milestones are recorded only from a company's own dated disclosure. A milestone with no date shown is one we can confirm was reached but for which no date was disclosed — we don't estimate one. "Not yet reached" means exactly that, not that a date is missing. An "Expected" line likewise only ever reflects the company's own guidance (e.g. a study or permit decision targeted for a stated quarter) — most not-yet-reached milestones have none, and that absence means no such guidance has been disclosed, not that one is overdue.

Prior Ownership & Infrastructure
Duketon Gold Project
Existing MillTailings FacilityRoad Access7.1/10 built out

Not in place: grid power.

Tropicana Gold Mine
Existing MillTailings Facility3 of 4 checked, 2 in place

Not in place: grid power. Not yet determined: road access.

McPhillamys Gold Project
0/10 built out

Not in place: mill, tailings facility, road access, grid power.

Combined view across 3 projects. Figures below are only combined where the underlying basis genuinely matches -- see the notes under each.

Combined resource
2.1M oz Au
Sum of 1 of 3 projects with a disclosed figure; others not yet researched
IRR, per project
  • 21.8%McPhillamys Gold Project
Each project's own figure -- IRR is not additive across independent projects, so these are never combined
Mine life, per project
  • 6 yrsTropicana Gold Mine
  • 9.4 yrsMcPhillamys Gold Project
Each project's own figure -- independent mine lives are never added or averaged
Combined NPV, by discount-rate basis
$69.1M
At 5% discount rate -- Tropicana Gold Mine
$794.4M
At 5.5% discount rate -- McPhillamys Gold Project

Shown as separate totals, not summed together: these projects' studies used different discount rates, so a single combined NPV would not be a real number.

7.6/10
Weak track recordStrong track record
7.6/10 vs.
9.9/10
Thin runwayWell-capitalized
9.9/10 vs.
How this is calculated
5/10
Weaker depositStronger deposit
5/10 vs.
How this is calculated
7.5/10
Harder place to buildEasier place to build
7.5/10 vs.
What goes into it
  • Jurisdiction (40%)9/10

    Western Australia: Fraser PPI 2025 is 88.53 of 100 (rank 13 of 68), which maps to 9 on this site's scale. All operations in Western Australia (Duketon, Tropicana) and New South Wales (McPhillamys, in PFS-stage development) -- Tier-1 mining jurisdiction throughout.

  • Infrastructure (40%)7.1/10

    A confirmed mill, confirmed road access, no confirmed grid power, and a confirmed tailings facility at Duketon Gold Project.

  • Nearby producing mine (20%)Not yet researched

    No producing mine within 50 km in our reference list (nearest listed: Granny Smith (Gold Fields Limited), 102 km). That list doesn't cover every mining district yet, so a longer distance isn't scored as remote.

7.5/10
Weaker profileStronger profile
7.5/10 vs.
Price Chart
$3.04$5.17$4.69$4.21$4.79AugDecMarJulOct
Aug 12, 2025 – Oct 20, 2026
News
$4.70
+29.5%from low-29.6%from high
$3.63$6.68
See who ↓
2.7%
Low alignmentHigh alignment
2.7% vs.
See who ↓
64.6%
Low alignmentHigh alignment
64.6% vs.
$3.6B
Far belowFar above
$3.6B vs. $541.2M peer median
Price (USD - Local)
US$4.70 (AUD 6.70)
Cash Position (USD)
$788.2M
Far belowFar above
$788.2M vs. $91.1M peer median
Debt (USD)
Far aboveFar below
$0 vs. $6.5M peer median
$2.8B
Far belowFar above
$2.8B vs. $457.8M peer median
757.4M
Far aboveFar below
757.4M vs. 316.1M peer median
Jurisdiction
Australia
6,570,000 oz
Feeds Deposit Quality score
Measured790,000 oz
Indicated5,780,000 oz
Inferrednot scored1,700,000 oz
Total resource8,270,000 oz
Far belowFar above
6.6M oz vs. 1.3M oz peer median
Compares M&I only — Inferred isn't compared or scored.
$421.97/oz
M&I
Total resource (incl. Inferred)$335.23/oz
Peer median $67.95/oz
Far aboveFar below
$421.97/oz vs. $132.92/oz peer median
Open pit and underground
See projects ↓
$2,070/oz
See projects ↓
See projects ↓
See projects ↓
See projects ↓
2.7%
0%100%
2.7% vs. 12.1% peer median
64.6%
0%100%
64.6% vs. 3.3% peer median
102 kmfrom Gold Fields Limited's Granny Smith
Outside typical bolt-on range

Acquisition Susceptibility

How this is calculated
5.4/10
Unlikely bolt-onFits the takeout profile

A relative ranking of how closely this company matches the profile of juniors that have actually been acquired — not a probability, and not a reason to buy. Acquisitions are rare: only a few dozen significant deals happen a year across a universe of thousands of juniors, so even a high score here describes a long shot. The strongest signal in the research, a producer that already owns part of the company, is scored from its disclosed strategic shareholders. A producer that is a joint-venture or earn-in partner on the project, rather than a shareholder, isn't captured yet.

How this score is built

  • Disclosed pending deal
    Sub-score: Not scored

    No pending acquisition or merger disclosed (checked)

    Not scored: having no deal in flight isn't held against a company.

    Weight 26.25%
  • Producer's strategic stake
    Sub-score: Not scored

    No producer holds a disclosed stake on file (holder register researched) See holders

    Not scored: most juniors that do get bought had no prior toehold, so a missing stake says little either way.

    Weight 25%
  • Distance to a producing mine
    Sub-score:
    3.3/10

    Nearest producing mine: Granny Smith (Gold Fields Limited), 102 km

    10 next to a producing mine, 8 at 20 km, 5 at 50 km, 0 beyond 200 km.

    Weight 22.5% · 46% here
  • Lifecycle stage
    Sub-score:
    5.5/10

    Stage: Production

    Feasibility and permitting score 10, where deals cluster, and production 5.5; earlier stages score less, down to 1 at grassroots.

    Weight 15% · 31% here
  • Jurisdiction
    Sub-score:
    9/10

    Australia: jurisdiction score 9/10

    Our jurisdiction score, used as is: higher means lower political and permitting risk.

    Weight 6.75% · 14% here
  • Commodity
    Sub-score:
    10/10

    Primary commodity: Gold

    Gold 10, copper 8, silver 5, nickel and uranium 4, others 2: most majors' deals are for gold.

    Weight 4.5% · 9% here

Weight is each input's share of the full score. “Here” is its share of this company's score: inputs that aren't scored are left out and the rest re-weighted, never counted as zero.

Overall Score Trend
+7.1% since 2026-08-08 · -9.6% from peak

Your Rankings

Community Sentiment
—SELLINGBUYING
CategoryCommunityYour Ranking
Overall— (0) 
Management— (0) 
Financials— (0) 
Jurisdiction— (0) 
Project Quality— (0) 

Management Team

Managing Director and Chief Executive Officer of Regis Resources Ltd since 2018. Qualified mining engineer with 30 years of broad strategic, operating and start-up experience. General Manager of Pajingo Gold Mine (2004-2006) and Boddington Gold Mine (2007-2010); Chief Executive Officer of Mt Gibson Iron Limited (2012-2018), immediately before joining Regis. President of the Executive Council of the Association of Mining & Exploration Companies (AMEC). Bachelor of Engineering (Mining); Masters of Geoscience (Mineral Economics).

Chief Operating Officer of Regis Resources Ltd, effective 1 Nov 2023 (announced 12 Oct 2023), succeeding Stuart Gula. Mining engineer with nearly 40 years' experience across Australia, Argentina, New Zealand, the Philippines and the United States. Immediately before Regis, President and Chief Executive Officer of OceanaGold Corporation from 2020, having joined as Chief Operating Officer in Jul 2012. Before that, 10 years with Xstrata Copper as General Manager of the Minera Alumbrera operations (Argentina) and the Mount Isa Copper Operations (Queensland). BEng (Mining), University of Queensland; Fellow, Australian Institute of Mining and Metallurgy.

Fellow member of Chartered Accountants Australia and New Zealand, with over 20 years of senior accounting and finance experience in public companies and professional services, predominantly in the gold mining industry. CFO of Wiluna Mining Limited for approximately 5 years, immediately before Regis. Career began at PwC (Manager, Assurance division).

Insiders, Investors & Smart Money

Notable shareholders and insiders whose involvement is worth knowing about, plus what we're seeing from institutional/large-investor activity.

Smart money
2/10

One dedicated precious-metals fund is on the register -- the USAA Precious Metals & Minerals Fund -- but at 0.53% it is a token position rather than a bet. Everything else is index or generic international small-cap money: VanEck's two gold ETFs at a combined 9.2%, Vanguard, iShares, Dimensional and Bernstein. Regis once had a producer as its dominant holder, Newmont at about 47%, but that stake was fully sold down by March 2016 and the five substantial shareholders on the register today are all passive index managers. Directors have not bought on-market in the last year -- the share movements on file are performance rights vesting, not purchases. The fund holdings above were last refreshed in 2020-2021.

No notable insiders tracked for this miner yet.

Reports, Presentations & Documents

Technical Report Takeaways

Regis Resources produces gold from the 100%-owned Duketon Gold Project in Western Australia's North Eastern Goldfields and from its 30% interest in the Tropicana mine, which AngloGold Ashanti operates and owns 70% of. Its attributable resource at 31 December 2025 is 6,570,000 oz of gold in measured and indicated resources (790,000 oz measured, 5,780,000 oz indicated), inclusive of reserves, plus 1,700,000 oz inferred. FY2026 production (the year to 30 June 2026) was 379,000 oz (Duketon 236,000 oz, Tropicana 143,100 oz) at a group all-in sustaining cost of US$2,070/oz (AUD 2,945/oz). A June 2026 pre-feasibility study for the 100%-owned McPhillamys project in New South Wales found a tailings design that avoids a 2024 federal heritage declaration, reinstating a 1.89 Moz ore reserve; it shows a post-tax NPV of US$794M (AUD 1.13B), a 21.8% IRR and a 9.4-year life at an A$4,000/oz gold price, with a final investment decision targeted for the first half of 2028. In July 2026 Regis ended its agreed scheme with Vault Minerals after declining to match Genesis Minerals' superior proposal for Vault, and it expects a break fee of about A$50.7M.