JUNIORMETRICS

Qmines LimitedQ

QML·US$0.043 (AUD 0.061)·US$33M cap
Copperalso:Mt Chalmers Copper-Gold Project, Queensland Map

Qmines Limited 100%-owns the Mt Chalmers copper-gold project, 17km north-east of Rockhampton in Queensland. The project carries a JORC Mineral Resource of 11.86 million tonnes at 1.22% copper equivalent (84% classified Measured and Indicated), with an Ore Reserve of 9.6 million tonnes (Proved + Probable). A Pre-Feasibility Study completed 30 April 2024 outlined a stand-alone one-million-tonne-per-annum operation with a pre-tax NPV8 of A$373 million, a 54% internal rate of return, approximately A$191 million in initial capital cost, a payback under two years and a 10.4-year mine life, recovering an estimated 65,000 tonnes of copper, 160,000 ounces of gold, 1.8 million ounces of silver and 30,600 tonnes of zinc. A Definitive Feasibility Study commenced in February 2026, fully funded following a $15 million strategic package from the Queensland Investment Corporation (QIC) in April 2026 (structured as $5 million equity plus $10 million via a 2% net smelter return royalty over the project), and is targeting completion in 2027. Concurrently, a 10,000-metre drill program aimed at expanding the resource began in mid-2026, with initial results in July 2026 including 18 metres at 2.7g/t gold and 1.7% copper from 54 metres (including a higher-grade 12-metre section at 3.8g/t gold and 2.0% copper).

Lifecycle Milestones

Grassroots
Resource Def.
PEA
PFSCurrent
Feasibility
Permitting
Construction
Production
Not yet researched
Weak track recordStrong track record
5.4/10
Thin runwayWell-capitalized
5.4/10 vs.
How this is calculated
4.6/10
Weaker depositStronger deposit
4.6/10 vs.
How this is calculated
6.6/10
Harder place to buildEasier place to build
6.6/10 vs.
What goes into it
  • Jurisdiction (40%)9/10

    Queensland: Fraser PPI 2025 is 82.72 of 100 (rank 18 of 68), which maps to 9 on this site's scale. Queensland, Australia -- top-tier, low political-risk mining jurisdiction, matching this schema's established Queensland convention.

  • Infrastructure (40%)No verified figure

    Researched with nothing found: no source we could cite confirms or rules out an existing mill, road access, grid power, or tailings facility at Mt Chalmers Copper-Gold Project, Queensland, Australia (checked Sep 26, 2026; recheck due Mar 25, 2027). Counts at a neutral 5/10 until one does.

  • Nearby producing mine (20%)Not yet researched

    No producing mine within 50 km in our reference list (nearest listed: Cracow (Aeris Resources Limited), 225 km). That list doesn't cover every mining district yet, so a longer distance isn't scored as remote.

5.4/10
Weaker profileStronger profile
5.4/10 vs.
Price Chart
$0.039$0.036$0.033$0.04$0.044AugDecAprJulOct
Aug 26, 2025 – Oct 20, 2026
$0.043
+41.7%from low-24.9%from high
$0.03$0.057
$33M
Far belowFar above
$33M vs. $28M peer median
Price (USD - Local)
US$0.043 (AUD 0.061)
Cash Position (USD)
$9.9M
Far belowFar above
$9.9M vs. $3.8M peer median
Debt (USD)
$6.9M
Far aboveFar below
$6.9M vs. $0 peer median
$30.1M
Far belowFar above
$30.1M vs. $25.5M peer median
772M
Far aboveFar below
772M vs. 171.1M peer median
Jurisdiction
Australia
118,756 t Cu
Feeds Deposit Quality score
Measured37,380 t Cu
Indicated81,376 t Cu
Inferrednot scored13,428 t Cu
Total resource132,184 t Cu
Far belowFar above
118.8K t vs. 1.1M t peer median
Compares M&I only — Inferred isn't compared or scored.
$253.45/t
M&I
Total resource (incl. Inferred)$227.70/t
Peer median $191.65/t
Far aboveFar below
$253.45/t vs. $369.20/t peer median
10.4 yrs2024 study
Far belowFar above
10.4 yrs vs. 19 yrs peer median
$120.9M2024 study
Far aboveFar below
$120.9M vs. $587M peer median
225 kmfrom Aeris Resources Limited's Cracow
Outside typical bolt-on range
-$7.4M
Far belowFar above
-$7.4M vs. -$3.8M peer median
-$0.01
Far belowFar above
-$0.01 vs. -$0.018 peer median

Acquisition Susceptibility

How this is calculated
4.4/10
Unlikely bolt-onFits the takeout profile

A relative ranking of how closely this company matches the profile of juniors that have actually been acquired — not a probability, and not a reason to buy. Acquisitions are rare: only a few dozen significant deals happen a year across a universe of thousands of juniors, so even a high score here describes a long shot. The strongest signal in the research, a producer that already owns part of the company, is scored from its disclosed strategic shareholders. A producer that is a joint-venture or earn-in partner on the project, rather than a shareholder, isn't captured yet.

How this score is built

  • Disclosed pending deal
    Sub-score: Not scored

    No pending acquisition or merger disclosed (checked)

    Not scored: having no deal in flight isn't held against a company.

    Weight 26.25%
  • Producer's strategic stake
    Sub-score: Not scored

    No producer holds a disclosed stake on file (holder register researched) See holders

    Not scored: most juniors that do get bought had no prior toehold, so a missing stake says little either way.

    Weight 25%
  • Distance to a producing mine
    Sub-score:
    0/10

    Nearest producing mine: Cracow (Aeris Resources Limited), 225 km

    10 next to a producing mine, 8 at 20 km, 5 at 50 km, 0 beyond 200 km.

    Weight 22.5% · 46% here
  • Lifecycle stage
    Sub-score:
    8/10

    Stage: Pre-Feasibility Study

    Feasibility and permitting score 10, where deals cluster, and production 5.5; earlier stages score less, down to 1 at grassroots.

    Weight 15% · 31% here
  • Jurisdiction
    Sub-score:
    9/10

    Australia: jurisdiction score 9/10

    Our jurisdiction score, used as is: higher means lower political and permitting risk.

    Weight 6.75% · 14% here
  • Commodity
    Sub-score:
    8/10

    Primary commodity: Copper

    Gold 10, copper 8, silver 5, nickel and uranium 4, others 2: most majors' deals are for gold.

    Weight 4.5% · 9% here

Weight is each input's share of the full score. “Here” is its share of this company's score: inputs that aren't scored are left out and the rest re-weighted, never counted as zero.

Overall Score Trend
-27% since 2026-08-26 · -29.9% from peak

Your Rankings

Community Sentiment
—SELLINGBUYING
CategoryCommunityYour Ranking
Overall— (0) 
Management— (0) 
Financials— (0) 
Jurisdiction— (0) 
Project Quality— (0) 

Management Team

Founder of QMines Limited. 20+ years' experience in capital markets, corporate advisory, and executive leadership across the Australian resources sector; led multiple IPOs, capital raisings, and M&A transactions.

Executive Director (Technical) of Qmines Limited. 24+ years' experience in the mineral exploration industry including senior roles at Newcrest Mining and OceanaGold; current Chair of the Queensland Branch, Australian Institute of Geoscientists.

Company Secretary of Flagship Minerals Limited; also Independent Non-Executive Director & Company Secretary of Qmines Limited.

Insiders, Investors & Smart Money

Notable shareholders and insiders whose involvement is worth knowing about, plus what we're seeing from institutional/large-investor activity.

Smart money

No smart-money tracking (institutional/large-investor activity) for this miner yet — this is a planned feature, not live data.

No notable insiders tracked for this miner yet.

Reports, Presentations & Documents

Technical Report Takeaways

Qmines owns 100% of the Mt Chalmers copper-gold project, 17km north-east of Rockhampton in Queensland, whose JORC resource is 11.86 million tonnes at 1.22% copper equivalent, 84% of it in the measured and indicated categories, with a proved and probable ore reserve of 9.6 million tonnes. The pre-feasibility study completed on 30 April 2024 outlined a stand-alone one-million-tonne-a-year operation with a pre-tax NPV8% of US$235.2M (AUD 373.4M), a 54% IRR and initial capital of US$120.9M (AUD 191.9M) over a 10.4-year mine life, recovering an estimated 65,000 tonnes of copper, 160,000 oz of gold, 1.8 million oz of silver and 30,600 tonnes of zinc. A definitive feasibility study began in February 2026, funded by an A$15M strategic package from the Queensland Investment Corporation in April 2026, made up of A$5M of equity and A$10M for a 2% net smelter return royalty over the project. A 10,000m drill program aimed at growing the resource began in mid-2026, with early results including 18m at 2.7 g/t gold and 1.7% copper from 54m.