Odyssey Gold Limited
Odyssey Gold is pursuing a low-capex, fast-track path to production by toll-treating ore from its Cable deposit through the nearby Kirkalocka CIL plant rather than building its own mill. Its 80%-owned Tuckanarra project (with the associated Stakewell project) hosts a combined resource of 451,000 oz gold (354,000 oz within granted mining leases), and the company has moved from a completed Stage 1 Scoping Study into a Stage 1 Feasibility Study, targeting first production in 2027.
Notable vs. Peers
- Financials score of 3.3/10 is weaker than the peer average of 6.6/10.
Lifecycle Milestones
A relative ranking of how closely this company matches the profile of juniors that have actually been acquired — not a probability, and not a reason to buy. Acquisitions are rare: only a few dozen significant deals happen a year across a universe of thousands of juniors, so even a high score here describes a long shot. The strongest signal the underlying research identifies — whether a major already holds a JV, earn-in, or 5–19.9% strategic stake — isn't tracked yet and is absent from this score.
Your Rankings
Management Team
Executive Director of Odyssey Gold Limited, appointed 28 August 2020. Chartered Accountant and mining executive with 27+ years in senior management roles across Australia and overseas; former CFO of Pacmin Mining Limited and Managing Director of Salt Lake Potash (2015-2019) and Sierra Mining Limited (prior to its 2014 acquisition); previously led Berkeley Resources Limited.
Executive Director of Business Development of Odyssey Gold Limited, appointed 31 August 2020. Key member of the Ledger Holdings Pty Ltd Group in Melbourne with 28+ years in the resources sector, specializing in company advisory, project identification, and capital raising exceeding A$800 million for mining ventures.
Company Secretary of Odyssey Gold Limited, appointed 4 November 2020. Chartered Accountant and Chartered Secretary with corporate experience at international accounting firms and multiple listed resource companies.
Insiders, Investors & Smart Money
Notable shareholders and insiders whose involvement is worth knowing about, plus what we're seeing from institutional/large-investor activity.
Collins St Asset Management, a concentrated Australian equity fund, has been steadily building its position in Odyssey Gold and now owns around 8%. It is a broad opportunistic fund rather than a dedicated resources specialist, but its growing, well-documented stake is still a real signal of conviction. Tribeca Investment Partners, an Asia-Pacific manager that runs a genuine, dedicated Global Natural Resources strategy across metals, mining and energy, separately holds a real 5.1% -- a true resource-sector specialist position in its own right, clearing the 5% threshold independently of Collins St.
No notable insiders tracked for this miner yet.
Reports, Presentations & Documents
Tuckanarra Gold Project (Murchison Goldfields, WA): total JORC Mineral Resource of 6.3Mt @ 2.2 g/t Au for 451,000oz (Indicated + Inferred combined; no clean Measured/Indicated/Inferred split found in available sources this pass, so ouncesFound -- this repo's M+I-only field -- is left null rather than guessed). Cable deposit alone: 2.75Mt @ 1.8 g/t Au for 158,000oz within that total. Stage 1 Scoping Study (results announced 28 Jul 2026) covers ONLY starter pits at Cable, not the full 451,000oz resource: 1.35Mt @ 1.9 g/t Au processed via toll treatment at Monument's nearby Kirkalocka CIL plant (agreement secured for up to 750,000t through 2027), recovering 79,000oz Au over a 29-month (2.4yr) mine life, generating A$180 million UNDISCOUNTED pre-tax cashflow at A$7 million pre-production capex. No NPV or IRR was disclosed in this Stage 1 study -- it presents only undiscounted cashflow. A Stage 2 Scoping Study (full 451,000oz resource, on-site processing) and Stage 3 (mine-life extension via deeper/along-strike targets) are both flagged by the company as forthcoming, not yet delivered. DB stage on file reads FEASIBILITY, but the real current disclosure is Scoping Study-level (Stage 1 only) -- worth a stage-consistency recheck. Per the RSG/Serabi precedent (Task #317 batchP), this partial-scope Stage 1 result is recorded here rather than written into dcfNpvUsd/irrPct/mineLifeYears, which would otherwise misrepresent one starter-pit phase as the whole project's headline economics.