Ora Banda Mining's 100%-owned Davyhurst Gold Project in the eastern goldfields of Western Australia delivered a record 40,000-ounce June 2026 quarter, lifting closing cash to A$267.7 million; the company approved its 'DRIVE to 300' growth strategy, including construction of a new A$375 million, 3 Mtpa processing plant, which management intends to largely self-fund from existing cash and future cash flow.
Notable vs. Peers
- Financials score of 8/10 is stronger than the peer average of 6.4/10.
- All-in sustaining cost of $2,447/oz is 25% higher than the peer producer average of $1,950/oz.
Lifecycle Milestones
Construction Milestones
5 of 5 reached- Reached — date not disclosed · Riverina Underground was developed within Ora Banda's existing Davyhurst mining tenements (an established, previously-producing gold camp) under pre-existing mining leases; no discrete new-permit-grant event specific to the Riverina decision was found. · Source
- Reached — date not disclosed · Ora Banda's Board approved a mining investment decision for the Riverina underground deposit (~A$30M capital) following a 2023 capital raise; no single release with the exact FID date was located. · Source
- Reached — date not disclosed · Underground mine development at Riverina was underway by September 2023: portal support works in progress, Byrnecut Australia mobilised as the preferred mining contractor, with first ore extraction then targeted for January/February 2024. No single dated 'construction start' release found; recorded reached-but-undated. · Source
- Reached — date not disclosed · Ora Banda reached first (development) ore from Riverina Underground in the December 2024 quarter, feeding the existing Davyhurst plant; by late 2024 Riverina had already recouped its initial capital. Exact day not found in available sourcing. · Source
- Reached — date not disclosed · Genuinely reached, but a clean single date could not be confirmed from reachable sourcing: Ora Banda Mining (formerly Eastern Goldfields, which collapsed in 2018 leaving Davyhurst on care and maintenance) restarted gold production at its Davyhurst Gold Project in Western Australia in January 2021 -- practical completion of remedial works was reached 2021-01-24, with mining recommencing shortly after and the company's own Managing Director describing it as "our transition from developer to producer," but no source with an explicit "commercial production declared" date/threshold for this original restart was found. A specific underground component within the same Davyhurst complex, Riverina Underground, separately "became commercial" on 2024-08-01 -- noted for completeness but not used as achievedDate, since it is a later addition to an already-producing multi-pit complex (Sand King, Missouri, and other Davyhurst pits also contribute), not the company's original milestone. Rather than force either date, achievedDate is left null and this honest gap is documented. This row was missing entirely prior to 2026-08-21 -- a genuine data gap, not a stage error; Miner.stage was already correctly PRODUCTION. · Source
Milestones are recorded only from a company's own dated disclosure. A milestone with no date shown is one we can confirm was reached but for which no date was disclosed — we don't estimate one. "Not yet reached" means exactly that, not that a date is missing. An "Expected" line likewise only ever reflects the company's own guidance (e.g. a study or permit decision targeted for a stated quarter) — most not-yet-reached milestones have none, and that absence means no such guidance has been disclosed, not that one is overdue.
A relative ranking of how closely this company matches the profile of juniors that have actually been acquired — not a probability, and not a reason to buy. Acquisitions are rare: only a few dozen significant deals happen a year across a universe of thousands of juniors, so even a high score here describes a long shot. The strongest signal the underlying research identifies — whether a major already holds a JV, earn-in, or 5–19.9% strategic stake — isn't tracked yet and is absent from this score.
Your Rankings
Management Team
Managing Director of Ora Banda Mining Limited, appointed CEO 4 Jul 2022, transitioned to Managing Director 28 Sep 2022. Mining engineer with 20+ years' experience in underground hard-rock mining across Australia and overseas, BEng (Mining), University of Queensland, WA First Class Mine Manager's Certificate. Career: Chief Operating Officer, Northern Star Resources Ltd (already tracked in this DB, NST, 2015-2022, senior positions incl. GM Business Development, GM Strategy & Growth, Operations Manager before COO from Nov 2018); Operations Manager, Barminco, before Northern Star.
Chief Financial Officer of Ora Banda Mining Limited since 28 Aug 2024, also joint Company Secretary. Chartered Accountant, MBA (Executive), Australian Graduate School of Management. 30+ years leading ASX-listed company finance functions. Career: CFO then interim CEO (Mar-Jun 2024), Core Lithium Ltd, overseeing a real $110M equity raise during a real lithium-price rout; CFO, Resolute Mining Limited (already tracked in this DB, RSG, also covered this same batch, Sep 2021-2023); 13 years at Iluka Resources Limited culminating CFO & Head of Strategy and Planning (2015-2021); began career in corporate finance/restructuring at KPMG and EY.
Insiders, Investors & Smart Money
Notable shareholders and insiders whose involvement is worth knowing about, plus what we're seeing from institutional/large-investor activity.
Hawke's Point, a dedicated mining-finance investor managed out of the Tetragon group, is Ora Banda's largest shareholder with 17.40% -- 336,549,353 shares. It has backed the company for years at levels as high as 46.64%, which is real specialist conviction, but the direction is down: it sold 50 million shares for A$65.75M in a J.P. Morgan block trade on 13 Aug 2026, cutting the stake from 20.38%. Paradice Investment Management holds a further 8%. Director John Richards bought 120,000 shares on market in June 2026, though that follows much larger selling by Luke Creagh and Peter Mansell in November 2025.
No notable insiders tracked for this miner yet.
Reports, Presentations & Documents
We haven't parsed this company's PEA/PFS/FS recommendations yet — cut-off grade, mine life, DCF/NPV, and the report's own next-steps guidance are a planned research pass, not live data for every company yet.
Ora Banda Mining's Annual Mineral Resources and Ore Reserves Statement for the 100%-owned Davyhurst Gold Project: total Mineral Resource of 56.5 Mt at 2.0 g/t gold for 3.69 Moz (a 75% increase), and total Ore Reserve of 8.4 Mt at 2.3 g/t gold for 610,000 oz (a 159% increase, net of 80,000 oz of mining depletion), reflecting depletion through 1 April 2026. Growth was driven by Round Dam (a maiden 223 koz Ore Reserve from a previously modest inventory) across five principal Davyhurst mining sources: Waihi Underground, Waihi Open Pit, Round Dam Open Pit, Sand King Underground and Riverina Underground. NOTE: this is an image-scanned ASX PDF that could not be text-extracted directly in this pass; figures are corroborated via Stockhead's contemporaneous, directly-quoted report of the same announcement. A separate press round on the same date reported slightly different rounded totals (3.57 Moz / 555 koz) -- this script uses the Stockhead figures because they were read directly off a fetched, quoted table rather than a search-engine summary, but flags the discrepancy here for a future pass to reconcile against the primary PDF once it can be OCR'd.