Magna Mining Inc.
Magna Mining produces copper (with nickel/PGM byproducts) from its McCreedy West mine in Sudbury, Ontario, with a broader restart pipeline across Levack, Crean Hill, Podolsky, and Shakespeare. A pending 62.2 million-share Alpayana S.A.C. C$140 million placement was announced Jul 6 2026 but is not confirmed closed as of this record -- the pre-placement share count is used here and could rise to ~313 million if/when that financing closes. Cash of CAD $35.8 million (Mar 31 2026, pre-Alpayana); debt is uncertain and left unstated rather than asserted as zero.
Notable vs. Peers
- All-in sustaining cost of $3.48/lb is 56% higher than the peer producer average of $2.23/lb.
Lifecycle Milestones
Construction Milestones
5 of 5 reached- Reached — date not disclosed · McCreedy West's own 43-101 technical report (filed by Magna, Feb 2025) states the property 'totals 804.24 acres (325.46 hectares) held under eight freehold patented parcels' (544SWS, 1971SWS, 5586SWS, 5591SWS, 8675SWS, 8784SWS, 8785SWS and 22185SWS) with 'surface and mining rights' -- century-old Ontario Crown patents, not a modern dated regulatory permit grant. The mine has been in near-continuous operation since Inco developed it in 1970 (commercial production under FNX Mining re-achieved Nov 1, 2003), decades before Magna acquired the producing mine from KGHM International in a transaction that closed February 28, 2025 (the same date already on file as this miner's CONSTRUCTION_START row). The underlying patented titles were inherited through that acquisition, not newly granted to Magna -- same reused-pre-existing-title shape as HL/San Sebastian and DRD/FWGR (Task #646 batch 1). No dated 'permit granted' event specific to Magna's 2025 restart was found. · Source
- Sep 2024 · Magna Mining announced a definitive agreement to acquire the McCreedy West mine and a portfolio of other Sudbury Basin assets from KGHM International -- McCreedy West was described as 'currently an operating mine' with 2023 production of 317,660 tonnes, so this is Magna's own real decision to take over and (following the transaction close) restart operational control of the mine, the same acquisition-as-decision convention used for GEM in the Task #430 batch3 script. · Source
- Feb 2025 · Magna Mining completed its acquisition of McCreedy West from KGHM on February 28, 2025 and took over operational control, immediately restarting mining activity (no stockpiled broken ore was available, so mining had to resume right away). · Source
- Reached — date not disclosed · Magna Mining's own production run at McCreedy West began around March 7, 2025, generating 790,000 lb copper-equivalent from ~20,000 tonnes of ore and $300,000 in positive cash flow in its first (partial) month. Exact day not confirmed with certainty from available sourcing -- recorded reached-but-undated as 'March 2025'. (McCreedy West itself has been in near-continuous production since Inco's original 1970-1998 development and FNX Mining's 2003 reopening -- this row records Magna's own current operating period, consistent with the CONSTRUCTION_DECISION/CONSTRUCTION_START rows above.) · Source
- Reached — date not disclosed · Genuinely reached, but no source found frames this as a formally "declared" commercial-production threshold distinct from the acquisition/production-start itself: Magna Mining closed its acquisition of the McCreedy West mine (Sudbury, Ontario) from KGHM on 2025-03-01, and issued a "Magna Mining Becomes Copper Producer" release on 2025-03-15, with production (790,000 lb copper-equivalent in the first month) and positive cash flow beginning immediately upon closing. McCreedy West is itself a past-producing mine with its own history under several prior operators (FNX Mining and predecessors, then KGHM) before this 2025 acquisition. Rather than treat an acquisition-close date as a declared commercial-production milestone, achievedDate is left null with this context noted. Crean Hill (100%-owned) remains a pre-feasibility-stage project targeted for its own production decision, not yet producing. This row was missing entirely prior to 2026-08-21 -- a genuine data gap, not a stage error; Miner.stage was already correctly PRODUCTION. · Source
Milestones are recorded only from a company's own dated disclosure. A milestone with no date shown is one we can confirm was reached but for which no date was disclosed — we don't estimate one. "Not yet reached" means exactly that, not that a date is missing. An "Expected" line likewise only ever reflects the company's own guidance (e.g. a study or permit decision targeted for a stated quarter) — most not-yet-reached milestones have none, and that absence means no such guidance has been disclosed, not that one is overdue.
A relative ranking of how closely this company matches the profile of juniors that have actually been acquired — not a probability, and not a reason to buy. Acquisitions are rare: only a few dozen significant deals happen a year across a universe of thousands of juniors, so even a high score here describes a long shot. The strongest signal the underlying research identifies — whether a major already holds a JV, earn-in, or 5–19.9% strategic stake — isn't tracked yet and is absent from this score.
Your Rankings
Management Team
Chief Executive Officer and Director of Magna Mining Inc. Over 25 years of experience in the mining industry spanning operations management, corporate development and project evaluation. Background includes FNX Mining, Sandstorm Gold, Premier Royalty and INCO.
Chief Operating Officer of Magna Mining Inc. (MBA, PMP) Over 20 years in operations management, project management and underground mine building. Previously President & COO at Dumas Contracting Ltd. Graduate of the Haileybury School of Mines.
Chief Financial Officer of Magna Mining Inc. (CA, CPA, CBV) Over 25 years of experience in finance roles in the mining sector. Former CFO at Wesdome Gold Mines Ltd. Holds a BBA from Lakehead University.
Senior Vice President, General Counsel of Magna Mining Inc. (JD) Almost 20 years of experience in the mining industry plus 25 years as a corporate/securities lawyer. Previously Senior Vice President, General Counsel at IAMGOLD Corporation.
Senior Vice President, Exploration and Geoscience of Magna Mining Inc. (M.Sc., P.Geo.) More than 25 years of base and precious metal experience. Former Vice President Exploration at TMAC Resources Inc.
Executive Vice President of Magna Mining Inc. (CFA) Over 17 years working with publicly-listed Canadian mining companies, with expertise in corporate development, M&A and capital raising. Most recently Manager, Corporate Development at Reunion Gold.
Senior Vice President, Capital Markets of Magna Mining Inc. Over 20 years of capital markets experience in the mining sector, spanning institutional mining equity sales, fund management and mining equity research. Former CEO/President of Nuclear Fuels Inc.
Insiders, Investors & Smart Money
Notable shareholders and insiders whose involvement is worth knowing about, plus what we're seeing from institutional/large-investor activity.
Alpayana S.A.C., a real Peruvian mining company with six operating underground mines, has signed a binding agreement for a C$140 million, ~19.9% strategic investment, but the deal had not yet closed as of Magna's own August 2026 quarterly report (closing anticipated Q3 2026). Polygon Global Partners LLP, a London/New York multi-strategy hedge fund manager (part of Tetragon's TFG Asset Management platform), separately discloses a real 8% stake -- a sizeable position, but a generalist public-equities book rather than a resource-sector conviction bet. No genuine open-market insider buying was found in the two-year record.
No notable insiders tracked for this miner yet.
Reports, Presentations & Documents
Crean Hill Nickel-Copper-Precious Metals Project (Sudbury, Ontario) updated PEA, released 17 Sep 2024 (mineral resource effective 15 Apr 2024): after-tax NPV(8%) of US$194.1 million, after-tax IRR of 129%, 13-year mine life; pre-tax NPV(8%) US$265.3M / IRR 142%. Base case metal prices: US$8.50/lb Ni, US$4.00/lb Cu, US$13.00/lb Co, US$900/oz Pt, US$1,000/oz Pd, US$2,150/oz Au, at 1.35 CAD/USD -- more conservative than the 2023 PEA's US$9.50/lb Ni assumption. IMPORTANT: this PEA covers Magna's Crean Hill DEVELOPMENT project, not the company's currently-producing McCreedy West Mine (the asset that drives NICU's PRODUCTION stage) -- Magna filed its own NI 43-101 technical report for McCreedy West on 1 Apr 2026 (effective 31 Dec 2025, SGS Canada), disclosing a Probable Mineral Reserve of 987,000 t @ 1.59% Cu/0.32% Ni/0.01% Co/1.15 g/t Pt/1.23 g/t Pd/0.32 g/t Au/6.65 g/t Ag for the 700 Copper and PM Copper-PGE Zones, but its NPV/IRR economics (if the report contains a cash-flow model at all, which reserve-support technical reports for an operating mine do not always carry) could not be extracted from available web sources in this pass -- the source PDF did not render as readable text. Written the Crean Hill figures here as the only currently-quantified NPV/IRR/mine-life set found, with this caveat, rather than leaving all three null; recheck McCreedy West's own Apr 2026 technical report directly (SEDAR+) in a future pass for a possibly more representative production-asset figure. Magna has since engaged Technica to complete a full PFS on Crean Hill (building on this PEA), expected to update these economics during 2026. ouncesFound left null -- see repo-wide OPEN POLICY QUESTION on the ouncesFound/copper unit mismatch (docs/GOLD-DATA-OPERATIONS-PLAYBOOK.md Section 9 Step 0 / Task #324), not resolved unilaterally here.
McCreedy West mine (Sudbury, Ontario, Cu-Ni-PGM), 2026 guidance 16-18 Mlb payable CuEq. Restart pipeline: Crean Hill (PFS targeted Q3 2026), Levack (PEA targeted Q3 2026, dewatering starting), Podolsky, Shakespeare. Neither the Crean Hill PFS nor the Levack PEA is complete yet -- no unified NPV/IRR/mine-life to cite. ouncesFound not written -- copper-commodity convention gap.