JUNIORMETRICS

Montage Gold Corp.

MAUTF·MAU·US$11.61 (CAD 16.32)·US$4.7B cap
GoldKoné Gold Project, Côte d'Ivoire Map

Montage Gold is building the large-scale Koné gold mine in northwest Côte d'Ivoire, one of the biggest gold mine builds under way globally. The oxide circuit poured first gold on 26 September 2026 (about 1,140 oz), ahead of the original Q2-2027 schedule; commercial production on the oxide circuit is expected in Q4-2026 and the hard-rock comminution circuit in Q2-2027. No gold sale had been disclosed as of 30 September 2026, so the company is still classed as under construction. Montage graduated from the TSX Venture Exchange to the senior TSX during its rapid build-out.

Notable vs. Peers

  • All-in sustaining cost of $998/oz is 45% lower than the peer producer average of $1,816/oz.
  • Jurisdiction risk score of 6/10 is meaningfully riskier than the peer average of 7.8/10.

Lifecycle Milestones

Grassroots
Resource Def.
PEA
PFS
Feasibility
Permitting
ConstructionCurrent
Production

Construction Milestones

4 of 5 reached
  1. Jul 2024 · Source
  2. Dec 2024 · Source
  3. Reached — date not disclosed
  4. Sep 2026 · Source
  5. Not yet reached
    Expected Q4 2026 · Oxide-circuit commercial production at Koné (Q4-2026); the first disclosed gold sale is the production trigger. Hard-rock comminution circuit Q2-2027. · Source

Milestones are recorded only from a company's own dated disclosure. A milestone with no date shown is one we can confirm was reached but for which no date was disclosed — we don't estimate one. "Not yet reached" means exactly that, not that a date is missing. An "Expected" line likewise only ever reflects the company's own guidance (e.g. a study or permit decision targeted for a stated quarter) — most not-yet-reached milestones have none, and that absence means no such guidance has been disclosed, not that one is overdue.

Prior Ownership & Infrastructure
Koné Gold Project, Côte d'Ivoire
Existing MillRoad Access5.7/10 built out

Not in place: tailings facility, grid power.

Didievi Project, Côte d'Ivoire
Road Access1 of 4 checked, 1 in place

Not yet determined: mill, tailings facility, grid power.

Combined view across 5 projects. Figures below are only combined where the underlying basis genuinely matches -- see the notes under each.

Combined resource
6.3M oz Au
Sum of 1 of 5 projects with a disclosed figure; others not yet researched
IRR, per project
  • 31%Koné Gold Project, Côte d'Ivoire
Each project's own figure -- IRR is not additive across independent projects, so these are never combined
Mine life, per project
  • 16 yrsKoné Gold Project, Côte d'Ivoire
Each project's own figure -- independent mine lives are never added or averaged
Combined NPV, by discount-rate basis
$1.1B
At 5% discount rate -- Koné Gold Project, Côte d'Ivoire
Excluded from the totals above: Didievi Project, Côte d'Ivoire (royalty or minority interest, 95.5% recorded); Konahiri North, Konahiri South and Koyekro Properties, Côte d'Ivoire (royalty or minority interest, 95.5% recorded); Sfariat and Zednes Properties, Mauritania (royalty or minority interest, 80% recorded)
7/10
Weak track recordStrong track record
7/10 vs.
5.9/10
Thin runwayWell-capitalized
5.9/10 vs.
How this is calculated
5.9/10
Weaker depositStronger deposit
5.9/10 vs.
How this is calculated
5.7/10
Harder place to buildEasier place to build
5.7/10 vs.
What goes into it
  • Jurisdiction (40%)6/10

    Côte d'Ivoire — a growing West African gold jurisdiction with an established mining code and a track record of successful nearby operations (e.g., Endeavour Mining), but higher political/currency risk than Canada/US/Australia.

  • Infrastructure (40%)5.7/10

    A confirmed mill, confirmed road access, no confirmed grid power, and no confirmed tailings facility at Koné Gold Project, Côte d'Ivoire.

  • Nearby producing mine (20%)Not yet researched

    No producing mine within 50 km in our reference list (nearest listed: Seguela (Fortuna Mining Corp.), 64 km). That list doesn't cover every mining district yet, so a longer distance isn't scored as remote.

6.1/10
Weaker profileStronger profile
6.1/10 vs.
Price Chart
$3.24$5.39$9.58$11.64$11.57JulNovMarJulOct
Jul 25, 2025 – Oct 20, 2026
News
$11.61
+162.6%from low-22.3%from high
$4.42$14.94
See who ↓
20.8%
Low alignmentHigh alignment
20.8% vs.
See who ↓
28.2%
Low alignmentHigh alignment
28.2% vs.
$4.7B
Far belowFar above
$4.7B vs. $541.4M peer median
Price (USD - Local)
US$11.61 (CAD 16.32)
Cash Position (USD)
$154.4M
Far belowFar above
$154.4M vs. $91.1M peer median
Debt (USD)
$64.5M
Far aboveFar below
$64.5M vs. $6.2M peer median
$4.6B
Far belowFar above
$4.6B vs. $457.7M peer median
403.3M
Far aboveFar below
403.3M vs. 316.1M peer median
Jurisdiction
Côte d'Ivoire
6,292,000 oz
Feeds Deposit Quality score
Measured229,000 oz
Indicated6,064,000 oz
Inferrednot scored2,025,000 oz
Total resource8,317,000 oz
Far belowFar above
6.3M oz vs. 1.3M oz peer median
Compares M&I only — Inferred isn't compared or scored.
$729.57/oz
M&I
Total resource (incl. Inferred)$551.93/oz
Peer median $67.95/oz
Far aboveFar below
$729.57/oz vs. $133.79/oz peer median
0.0234 oz/tCut-off: 0.20 g/t Au (Koné deposit); 0.50 g/t Au (Gbongogo Main, Gbongogo South, Koban North, Soman, Sena, Diouma North, Petit Yao, Lokolo Main, Lokolo NW); 0.60 g/t Au (ANV, Yéré North) -- all inside US$2,500/oz optimised pit shells
Far belowFar above
0.0234 oz/t vs. 0.0383 oz/t peer median
Open pit
16 yrs2024 study
Far belowFar above
16 yrs vs. 11.1 yrs peer median
$998/oz2024 study
@5%$1.1B2024 study · gold deck US$1,850 vs spot US$4,133/oz
Far belowFar above
$1.1B vs. $602M peer median
4.78x2024 study · gold deck US$1,850 vs spot US$4,133/oz
Far aboveFar below
4.78x vs. 0.32x peer median
4.68x2024 study · gold deck US$1,850 vs spot US$4,133/oz
Far aboveFar below
4.68x vs. 0.29x peer median
$712.1M2024 study
Far aboveFar below
$712.1M vs. $276.5M peer median
1.5xBelow Durrett's 2:1 bar2024 study · gold deck US$1,850 vs spot US$4,133/oz
Far belowFar above
1.5x vs. 2.4x peer median
$1,850/oz55% below spot ($4,133/oz)2024 study
31%Clears Durrett's 25% developer bar2024 study · gold deck US$1,850 vs spot US$4,133/oz
Far belowFar above
31% vs. 43% peer median
20.8%
0%100%
20.8% vs. 12.1% peer median
28.2%
0%100%
28.2% vs. 3.3% peer median
64 kmfrom Fortuna Mining Corp.'s Seguela
Outside typical bolt-on range

Acquisition Susceptibility

How this is calculated
6.9/10
Unlikely bolt-onFits the takeout profile

A relative ranking of how closely this company matches the profile of juniors that have actually been acquired — not a probability, and not a reason to buy. Acquisitions are rare: only a few dozen significant deals happen a year across a universe of thousands of juniors, so even a high score here describes a long shot. The strongest signal in the research, a producer that already owns part of the company, is scored from its disclosed strategic shareholders. A producer that is a joint-venture or earn-in partner on the project, rather than a shareholder, isn't captured yet.

How this score is built

  • Disclosed pending deal
    Sub-score: Not scored

    No pending acquisition or merger disclosed (checked)

    Not scored: having no deal in flight isn't held against a company.

    Weight 26.25%
  • Producer's strategic stake
    Sub-score:
    8.7/10

    Zijin Mining Group Co., Ltd. holds 9.9% (reported 14 Aug 2024) See holders

    An operating producer's stake scores 8 at 5%, rising to 10 at 20% (the take-over-bid threshold) and holding there up to 50%.

    Weight 25% · 34% here
  • Distance to a producing mine
    Sub-score:
    4.5/10

    Nearest producing mine: Seguela (Fortuna Mining Corp.), 64 km

    10 next to a producing mine, 8 at 20 km, 5 at 50 km, 0 beyond 200 km.

    Weight 22.5% · 31% here
  • Lifecycle stage
    Sub-score:
    7/10

    Stage: Construction

    Feasibility and permitting score 10, where deals cluster, and production 5.5; earlier stages score less, down to 1 at grassroots.

    Weight 15% · 20% here
  • Jurisdiction
    Sub-score:
    6/10

    Côte d'Ivoire: jurisdiction score 6/10

    Our jurisdiction score, used as is: higher means lower political and permitting risk.

    Weight 6.75% · 9% here
  • Commodity
    Sub-score:
    10/10

    Primary commodity: Gold

    Gold 10, copper 8, silver 5, nickel and uranium 4, others 2: most majors' deals are for gold.

    Weight 4.5% · 6% here

Weight is each input's share of the full score. “Here” is its share of this company's score: inputs that aren't scored are left out and the rest re-weighted, never counted as zero.

Overall Score Trend
-15.3% since 2026-07-23 · -20.8% from peak

Your Rankings

Community Sentiment
—SELLINGBUYING
CategoryCommunityYour Ranking
Overall— (0) 
Management— (0) 
Financials— (0) 
Jurisdiction— (0) 
Project Quality— (0) 

Management Team

20-year mining executive; CFA charterholder; appointed CEO of Montage Gold in February 2024, during which the company's market cap grew from ~$140M to over $4B and construction of Koné was launched; also a director of LunR Royalties Corp.

Former corporate lawyer turned mining entrepreneur with a long history in the Lundin group of companies; co-founded Montage Gold and served as its CEO from August 2022.

Insiders, Investors & Smart Money

Notable shareholders and insiders whose involvement is worth knowing about, plus what we're seeing from institutional/large-investor activity.

Smart money
7/10

Two informed owners built this register with cash. Zijin Mining, one of the largest gold and copper producers in the world, paid roughly C$57.3M for 32,714,829 shares at C$1.75 in July 2024, taking 9.9%. The Lundin family trusts -- who seeded the company -- went from 17.7% to 19.9% in the same raise, explicitly to defend against dilution, and bought a further 848,000 shares on-market at $6.75 in October 2025. Wheaton Precious Metals separately took a gold stream over Kone in October 2024. Van Eck Associates Corporation, the GDX/GDXJ gold-miner ETF sponsor, separately discloses a real 6.79% stake, largely index-driven rather than a discretionary specialist pick. Three insiders sold roughly $12M in April 2026 after the shares had run from C$1.75 to about $16.50, which is profit-taking on a nine-fold move rather than a change of view.

No notable insiders tracked for this miner yet.

Reports, Presentations & Documents

Technical Report Takeaways

Montage Gold is building the Kone gold project in Cote d'Ivoire, where it poured first gold on 26 Sep 2026; no gold sale had been reported as of the end of September 2026. The June 2026 updated resource for the whole Kone project (100% basis), including the Gbongogo and other satellite deposits, is 244 Mt at 0.80 g/t for 6.29 Moz measured and indicated (229 koz measured, 6.06 Moz indicated) and 2.03 Moz inferred. The project's January 2024 updated feasibility study showed an NPV of US$1.09B, a 31% IRR and a 16-year mine life.

Recent News

AfricaGoldMiningShare PriceShareholderUndervaluedValuation
AfricaExplorationGold MiningKone MineProduction