Masivo Silver Corp.
Masivo Silver Corp. explores for gold, copper and silver in Nevada and Mexico. Its two named flagship assets are the Boston Mine Project in Elko County, Nevada, a historic high-grade gold-silver-copper mine it has held since 2021, and the Cerro Colorado gold-copper-silver project in Sonora, Mexico, held under a four-year option signed in April 2025, 28km from Alamos and 11km north of the operating Piedras Verdes open-pit copper mine; a Phase I diamond-drill programme (~8 holes, 1,500-2,000m) is underway there testing high-priority silver-copper targets, with the first hole intersecting visible mineralization and confirming alteration/sulfide continuity. The company also owns an idle mill (up to 300 tonnes/day capacity) on its El Colomo property in Mexico.
Notable vs. Peers
- Jurisdiction risk score of 9/10 is meaningfully safer than the peer average of 6.8/10.
- Trading within 0% of its 52-week low — weak recent price momentum.
Lifecycle Milestones
Jurisdiction (40%)9/10
Nevada: Fraser PPI 2025 is 100.00 of 100 (rank 1 of 68), which maps to 9 on this site's scale. Masivo names two flagship assets, the Boston Mine project in Elko County, Nevada, which it has held since 2021, and the Cerro Colorado project in Sonora, Mexico, held under a four-year option signed in April 2025; the rating follows Boston, the one it holds. Mexico's higher security and permitting risk is not captured by this single flagship-based score.
Infrastructure (40%)No verified figure
Researched with nothing found: no source we could cite confirms or rules out an existing mill, road access, grid power, or tailings facility at Boston Mine Project, Elko County, Nevada, USA (checked Oct 5, 2026; recheck due Apr 3, 2027). Counts at a neutral 5/10 until one does.
Nearby producing mine (20%)Not yet researched
No project coordinates on file yet, so distance to a producing mine can't be measured.
Acquisition Susceptibility
A relative ranking of how closely this company matches the profile of juniors that have actually been acquired — not a probability, and not a reason to buy. Acquisitions are rare: only a few dozen significant deals happen a year across a universe of thousands of juniors, so even a high score here describes a long shot. The strongest signal in the research, a producer that already owns part of the company, is scored from its disclosed strategic shareholders. A producer that is a joint-venture or earn-in partner on the project, rather than a shareholder, isn't captured yet.
How this score is built
- Disclosed pending dealSub-score: Not scored
No pending acquisition or merger disclosed (checked)
Not scored: having no deal in flight isn't held against a company.
Weight 26.25% - Producer's strategic stakeSub-score: Not scored
No producer holds a disclosed stake on file (holder register researched) See holders
Not scored: most juniors that do get bought had no prior toehold, so a missing stake says little either way.
Weight 25% - Distance to a producing mineSub-score: Not yet researched
Distance not yet researched: no project coordinates on file
Distance can't be measured without coordinates, so excluded rather than counted as far.
Weight 22.5% - Lifecycle stageSub-score:1/10
Stage: Grassroots Exploration
Feasibility and permitting score 10, where deals cluster, and production 5.5; earlier stages score less, down to 1 at grassroots.
Weight 15% · 57% here - JurisdictionSub-score:9/10
United States: jurisdiction score 9/10
Our jurisdiction score, used as is: higher means lower political and permitting risk.
Weight 6.75% · 26% here - CommoditySub-score:5/10
Primary commodity: Silver
Gold 10, copper 8, silver 5, nickel and uranium 4, others 2: most majors' deals are for gold.
Weight 4.5% · 17% here
Weight is each input's share of the full score. “Here” is its share of this company's score: inputs that aren't scored are left out and the rest re-weighted, never counted as zero.
Your Rankings
Management Team
Founder, Chief Executive Officer and Director of Masivo Silver Corp. since 2014, focused on acquiring precious-metal operations in Mexico.
Chief Financial Officer and Director of Dryden Gold Corp.; also Chief Financial Officer & Corporate Secretary of Masivo Silver Corp. and Chief Executive Officer & Director of Canoe Mining Ventures Corp. 20 years' experience managing resource companies across North and South America through all development stages; previously CFO of Marlin Gold Mining Ltd, Mako Mining Corp, and Ely Gold Royalties; Bachelor of Commerce, Royal Roads University (2001).
Operations Manager of Masivo Silver Corp. Three decades of experience in precious and base metals; formerly Operations Supervisor at Barrick Gold's Pueblo Viejo facility (2010-2013), managing 24,000 tons of ore daily; has participated in nine plant start-ups with strong safety/environmental records.
Insiders, Investors & Smart Money
Notable shareholders and insiders whose involvement is worth knowing about, plus what we're seeing from institutional/large-investor activity.
Checked directly against the company's own site, which is live and current -- a corporate presentation dated June 2026 is posted, though the site's news section is not yet populated. No producer, specialist fund or named institution holds a disclosed position, and there are no insider trading records in our data.
No notable insiders tracked for this miner yet.
Reports, Presentations & Documents
Masivo Silver explores for gold, copper and silver in Nevada and Mexico, and names two flagship assets. The Boston Mine project in Elko County, Nevada, a historic high-grade gold-silver-copper mine held since 2021, returned 45 ft of 1.73 g/t gold, 34.7 g/t silver and 1.14% copper (3.25% copper equivalent) in hole BM21-01, and step-out drilling has extended the mineralization about 70m along strike, open at depth. The Cerro Colorado gold-copper-silver project in Sonora, Mexico, held under a four-year option signed in April 2025, lies 11km north of the operating Piedras Verdes open-pit copper mine, and a first-phase diamond drill program of about 8 holes and 1,500 to 2,000m has been testing high-priority silver-copper targets there in 2026. The company also owns an idle mill of up to 300 tonnes a day on its El Colomo property in Mexico, and no resource estimate has been published.