JUNIORMETRICS

Investigator Silver LimitedI

SUTAF·IVR·US$0.03 (AUD 0.043)·US$78.4M cap
SilverParis Silver Project, South Australia Map

Investigator Silver Limited (renamed from Investigator Resources Limited in November 2025) 100%-owns the Paris Silver Project, located north of Kimba on South Australia's Eyre Peninsula -- one of Australia's highest-grade pure-play silver developments. A Definitive Feasibility Study announced 27 February 2026 outlines a maiden Probable Ore Reserve of 33 million ounces of silver (12 million tonnes at 88g/t Ag), supporting an 11-year mine life at 1.5 million tonnes per annum throughput via a conventional shallow open-pit, contract-mined, whole-ore cyanide-leach operation. At spot pricing (US$80/oz silver) the DFS shows a pre-tax NPV8 of A$1.15 billion, a 93% IRR and an 11-month payback from first production, against approximately A$260 million in peak development funding. The broader project carries a JORC Mineral Resource of 57 million ounces of silver (24 million tonnes at 73g/t Ag plus 0.41% lead), and sits within a 15km mineralised corridor offering satellite-deposit growth options near the planned plant and tailings facility. Following an institutional placement, the company held A$58.8 million cash as at 30 June 2026, funding parallel permitting (environmental, technical, heritage and native title studies), detailed engineering and exploration workstreams as it targets a Mining Lease Application in the September 2026 quarter.

Notable vs. Peers

  • Financials score of 9.7/10 is stronger than the peer average of 5.8/10.
  • Jurisdiction risk score of 9/10 is meaningfully safer than the peer average of 6.8/10.
  • Trading within 4% of its 52-week low — weak recent price momentum.

Lifecycle Milestones

Grassroots
Resource Def.
PEA
PFS
FeasibilityCurrent
Permitting
Construction
Production
Prior Ownership & Infrastructure
3 of 4 checked, 0 in place

Not in place: mill, tailings facility, road access. Not yet determined: grid power.

8.4/10
Weak track recordStrong track record
8.4/10 vs.
9.7/10
Thin runwayWell-capitalized
9.7/10 vs.
How this is calculated
4.2/10
Weaker depositStronger deposit
4.2/10 vs.
How this is calculated
5.2/10
Harder place to buildEasier place to build
5.2/10 vs.
What goes into it
  • Jurisdiction (40%)9/10

    South Australia: Fraser PPI 2025 is 85.47 of 100 (rank 16 of 68), which maps to 9 on this site's scale. South Australia -- Tier-1 mining jurisdiction, matching this schema's established South Australia convention.

  • Infrastructure (40%)1.4/10

    No confirmed mill, no confirmed road access, and no confirmed tailings facility at Paris Silver Project; grid power not yet researched, counted at a neutral 5/10 until established.

  • Nearby producing mine (20%)Not yet researched

    No producing mine within 50 km in our reference list (nearest listed: Carrapateena (BHP Group Limited), 212 km). That list doesn't cover every mining district yet, so a longer distance isn't scored as remote.

6.9/10
Weaker profileStronger profile
6.9/10 vs.
Price Chart
$0.019$0.052$0.051$0.028$0.031AugDecAprJulOct
Aug 26, 2025 – Oct 20, 2026
$0.03
+13%from low-74%from high
$0.027$0.12
$78.4M
Far belowFar above
$78.4M vs. $20.4M peer median
Price (USD - Local)
US$0.03 (AUD 0.043)
Cash Position (USD)
$40.7M
Far belowFar above
$40.7M vs. $3.9M peer median
Debt (USD)
Far aboveFar below
$0 vs. $0 peer median
$37.8M
Far belowFar above
$37.8M vs. $16.2M peer median
2.6B
Far aboveFar below
2.6B vs. 119.7M peer median
Jurisdiction
Australia
40,997,838 oz
Feeds Deposit Quality score
Indicated40,997,838 oz
Inferrednot scored16,000,000 oz
Total resource56,997,838 oz
Far belowFar above
41M oz vs. 50.2M oz peer median
Compares M&I only — Inferred isn't compared or scored.
$0.922/oz
M&I
Total resource (incl. Inferred)$0.663/oz
Peer median $3.47/oz
Far aboveFar below
$0.922/oz vs. $4.95/oz peer median
11 yrs2026 study
Far belowFar above
11 yrs vs. 10.8 yrs peer median
$27.39/oz Ag, by-product2026 study
@8%$574.1M2026 study · silver deck US$80.00 vs spot US$57.79/oz
Far belowFar above
$574.1M vs. $550M peer median
0.14x2026 study · silver deck US$80.00 vs spot US$57.79/oz
Far aboveFar below
0.14x vs. 1.01x peer median
0.07x2026 study · silver deck US$80.00 vs spot US$57.79/oz
Far aboveFar below
0.07x vs. 0.74x peer median
$180M2026 study
Far aboveFar below
$180M vs. $302.6M peer median
3.2xClears Durrett's 2:1 bar2026 study · silver deck US$80.00 vs spot US$57.79/oz
Far belowFar above
3.2x vs. 2.4x peer median
$80.00/oz38% above spot ($57.79/oz)2026 study
78%Clears Durrett's 25% developer bar2026 study · silver deck US$80.00 vs spot US$57.79/oz
Far belowFar above
78% vs. 46% peer median
212 kmfrom BHP Group Limited's Carrapateena
Outside typical bolt-on range
-$5M
Far belowFar above
-$5M vs. -$3.6M peer median
-$0.002
Far belowFar above
-$0.002 vs. -$0.022 peer median

Acquisition Susceptibility

How this is calculated
4.8/10
Unlikely bolt-onFits the takeout profile

A relative ranking of how closely this company matches the profile of juniors that have actually been acquired — not a probability, and not a reason to buy. Acquisitions are rare: only a few dozen significant deals happen a year across a universe of thousands of juniors, so even a high score here describes a long shot. The strongest signal in the research, a producer that already owns part of the company, is scored from its disclosed strategic shareholders. A producer that is a joint-venture or earn-in partner on the project, rather than a shareholder, isn't captured yet.

How this score is built

  • Disclosed pending deal
    Sub-score: Not scored

    No pending acquisition or merger disclosed (checked)

    Not scored: having no deal in flight isn't held against a company.

    Weight 26.25%
  • Producer's strategic stake
    Sub-score: Not scored

    No producer holds a disclosed stake on file (holder register researched) See holders

    Not scored: most juniors that do get bought had no prior toehold, so a missing stake says little either way.

    Weight 25%
  • Distance to a producing mine
    Sub-score:
    0/10

    Nearest producing mine: Carrapateena (BHP Group Limited), 212 km

    10 next to a producing mine, 8 at 20 km, 5 at 50 km, 0 beyond 200 km.

    Weight 22.5% · 46% here
  • Lifecycle stage
    Sub-score:
    10/10

    Stage: Feasibility Study

    Feasibility and permitting score 10, where deals cluster, and production 5.5; earlier stages score less, down to 1 at grassroots.

    Weight 15% · 31% here
  • Jurisdiction
    Sub-score:
    9/10

    Australia: jurisdiction score 9/10

    Our jurisdiction score, used as is: higher means lower political and permitting risk.

    Weight 6.75% · 14% here
  • Commodity
    Sub-score:
    5/10

    Primary commodity: Silver

    Gold 10, copper 8, silver 5, nickel and uranium 4, others 2: most majors' deals are for gold.

    Weight 4.5% · 9% here

Weight is each input's share of the full score. “Here” is its share of this company's score: inputs that aren't scored are left out and the rest re-weighted, never counted as zero.

Overall Score Trend
-25.8% since 2026-08-26 · -25.8% from peak

Your Rankings

Community Sentiment
—SELLINGBUYING
CategoryCommunityYour Ranking
Overall— (0) 
Management— (0) 
Financials— (0) 
Jurisdiction— (0) 
Project Quality— (0) 

Management Team

Appointed Managing Director effective 1 July 2025, succeeding Andrew McIlwain; 20+ years of mining-sector experience. Total fixed remuneration set at $550,000 p.a. from July 2026.

Geoscientist with 35+ years of experience; former Mawson Professor of Geology, University of Adelaide.

Board member of Investigator Silver Limited (formerly Investigator Resources Limited, renamed November 2025).

Insiders, Investors & Smart Money

Notable shareholders and insiders whose involvement is worth knowing about, plus what we're seeing from institutional/large-investor activity.

Smart money

No smart-money tracking (institutional/large-investor activity) for this miner yet — this is a planned feature, not live data.

No notable insiders tracked for this miner yet.

Reports, Presentations & Documents

Technical Report Takeaways

Investigator Silver, renamed from Investigator Resources in November 2025, owns 100% of the Paris silver project north of Kimba on South Australia's Eyre Peninsula, one of Australia's highest-grade pure-play silver developments. Indicated resources contain 40,997,838 oz of silver (17 Mt at 75 g/t), with no measured category, plus 16,000,000 oz inferred. The February 2026 definitive feasibility study, with a maiden probable reserve of 33 Moz of silver (12 Mt at 88 g/t), plans a shallow, contract-mined open pit with whole-ore cyanide leaching at 1.5 Mtpa over an 11-year mine life and, in its spot-linked base case at US$80/oz silver, shows a post-tax NPV8% of US$574.1M (AUD 832M) and a 78% IRR, with an all-in sustaining cost of US$27.39/oz. A mining lease application was targeted for the September 2026 quarter.