Ivanhoe Mines Ltd.I

IVN·$8.42·$12.5B cap
Copperalso:Kamoa-Kakula Copper Complex, Lualaba Province, DRC (Ivanhoe 39.6%, Zijin Mining 39.6%, Crystal River Global 0.8%, DRC government 20%) -- the flagship, most-advanced asset Map

Ivanhoe Mines Ltd. (TSX: IVN) is a Vancouver-headquartered mining company built around three principal African assets. NOT to be confused with Ivanhoe Electric Inc. (NYSE American: IE), a separately-listed, separately-run US/Arizona-focused battery-metals explorer that shares a historical Robert Friedland association but is a distinct corporate entity already seeded in this database under its own ticker. Kamoa-Kakula (DRC, Ivanhoe 39.6% / Zijin Mining 39.6% / Crystal River Global 0.8% / DRC government 20%) is the flagship: initial copper concentrate production began 25 May 2021, with commercial production declared 1 July 2021; the Phase 2 concentrator reached commercial production in April 2022, four months ahead of schedule; 2026 guidance is 290,000-310,000 tonnes of copper, with the mine plan targeting steady-state production above 500,000 t/yr from 2028 at a 17-million-tonne-per-year processing rate over an approximately 25-year mine life. Kipushi (DRC, Ivanhoe 68% via 100%-owned Kipushi Holding, Gecamines 32%), a restarted historic zinc mine, produced a record 70,177 tonnes of zinc in concentrate in Q2 2026 alone, with 2026 guidance of 240,000-290,000 tonnes -- large enough to be a genuine, material secondary commodity exposure for the company, not a trace byproduct. Platreef (South Africa, Ivanhoe 64% / B-BBEE partners 26% / an ITOCHU-led Japanese consortium 10%) is the newest and least mature of the three: Shaft #3 ramp-up is complete and Phase 2 expansion is targeted for Q4 2027 completion; its platinum-group-metals/nickel/copper/gold production is real but still ramping and not yet separately quantified with the same confidence as Kamoa-Kakula/Kipushi, so it is described here in prose rather than tagged as a MinerCommodity this pass. The company's own stage-setting evidence throughout is Kamoa-Kakula, its most advanced project by a wide margin.

Notable vs. Peers

  • Jurisdiction risk score of 4/10 is meaningfully riskier than the peer average of 7.7/10.

Lifecycle Milestones

Grassroots
Resource Def.
PEA
PFS
Feasibility
Permitting
Construction
ProductionCurrent

Construction Milestones

5 of 5 reached
  1. Reached — date not disclosed · Construction visibly accelerated from 2019 (CITIC Metal's US$459M additional investment, announced 25 Apr 2019, explicitly tied to accelerating Kamoa-Kakula's development) through first production in May 2021, but no single, cleanly-dated permit-grant or formal Final Investment Decision announcement was found in this pass distinct from the general construction-progress reporting. Row exists to satisfy the stage=PRODUCTION lifecycle-gate check (src/lib/lifecycle-gates.ts); a future pass with more time on Ivanhoe's own historical (2016-2019) news-release archive could likely find the specific dates this record currently lacks -- unlike BHP/SCCO/FCX/CCO's equivalent rows, this is flagged as a real, closeable research gap rather than a structural 'no such date exists' case. · Source
  2. Reached — date not disclosed · Construction visibly accelerated from 2019 (CITIC Metal's US$459M additional investment, announced 25 Apr 2019, explicitly tied to accelerating Kamoa-Kakula's development) through first production in May 2021, but no single, cleanly-dated permit-grant or formal Final Investment Decision announcement was found in this pass distinct from the general construction-progress reporting. Row exists to satisfy the stage=PRODUCTION lifecycle-gate check (src/lib/lifecycle-gates.ts); a future pass with more time on Ivanhoe's own historical (2016-2019) news-release archive could likely find the specific dates this record currently lacks -- unlike BHP/SCCO/FCX/CCO's equivalent rows, this is flagged as a real, closeable research gap rather than a structural 'no such date exists' case. · Source
  3. Reached — date not disclosed · Construction visibly accelerated from 2019 (CITIC Metal's US$459M additional investment, announced 25 Apr 2019, explicitly tied to accelerating Kamoa-Kakula's development) through first production in May 2021, but no single, cleanly-dated permit-grant or formal Final Investment Decision announcement was found in this pass distinct from the general construction-progress reporting. Row exists to satisfy the stage=PRODUCTION lifecycle-gate check (src/lib/lifecycle-gates.ts); a future pass with more time on Ivanhoe's own historical (2016-2019) news-release archive could likely find the specific dates this record currently lacks -- unlike BHP/SCCO/FCX/CCO's equivalent rows, this is flagged as a real, closeable research gap rather than a structural 'no such date exists' case. · Source
  4. May 2021 · Kamoa-Kakula (the flagship, most-advanced asset and this record's commodity/milestone anchor) produced its first copper concentrate on 25 May 2021 at the Kakula mine processing plant. Full date precision, primary-company-announcement sourced. · Source
  5. Jul 2021 · Kamoa-Kakula declared commercial production on 1 July 2021, roughly five weeks after first copper concentrate (25 May 2021). Full date precision, primary-company-announcement sourced -- unlike the multi-asset 140-year-history majors already in this backlog (BHP/SCCO/FCX/CCO), Ivanhoe is young and single-flagship enough to have one clean, real, dated commercial-production milestone rather than a structural 'no single date exists' gap. · Source

Milestones are recorded only from a company's own dated disclosure. A milestone with no date shown is one we can confirm was reached but for which no date was disclosed — we don't estimate one. "Not yet reached" means exactly that, not that a date is missing. An "Expected" line likewise only ever reflects the company's own guidance (e.g. a study or permit decision targeted for a stated quarter) — most not-yet-reached milestones have none, and that absence means no such guidance has been disclosed, not that one is overdue.

6.1/10
Weak track recordStrong track record
4.4/10
Thin runwayWell-capitalized
4/10
High riskLow risk
How this is calculated
10/10
Weaker depositStronger deposit
6.1/10
Weaker profileStronger profile
Price Chart
$8.65$10.19$10.44$8.04$8.42AugNovMarJunSep
Aug 26, 2025Sep 4, 2026
News
$8.42
+23.7%from low-42.5%from high
$6.81$14.66
$12.5B
Far belowFar above
$1.5B median
Price (USD - Local)
$8.42 - CAD 11.66
Cash Position (USD)
$635M
Far belowFar above
$94M median
Debt (USD)
$1.3B
Far aboveFar below
$121.9M median
$13.2B
Far belowFar above
$1.4B median
1.4B
Far aboveFar below
541.8M median
Jurisdiction
Canada
This company's data hasn't been researched yet
This company's data hasn't been researched yet
This company's data hasn't been researched yet
Underground (Kamoa-Kakula, Kipushi) and underground shaft-access (Platreef)
25 yrs
Far belowFar above
14 yrs median
This company's data hasn't been researched yet
Not enough peer data yet
This company's data hasn't been researched yet
Not enough peer data yet
This company's data hasn't been researched yet
This company's data hasn't been researched yet
This company's data hasn't been researched yet
This company's data hasn't been researched yet
This company's data hasn't been researched yet
This company's data hasn't been researched yet
This company's data hasn't been researched yet
This company's data hasn't been researched yet
Acquisition Susceptibility
5.5/10
Unlikely bolt-onFits the takeout profile

A relative ranking of how closely this company matches the profile of juniors that have actually been acquired — not a probability, and not a reason to buy. Acquisitions are rare: only a few dozen significant deals happen a year across a universe of thousands of juniors, so even a high score here describes a long shot. The strongest signal the underlying research identifies — whether a major already holds a JV, earn-in, or 5–19.9% strategic stake — isn't tracked yet and is absent from this score.

Overall Score Trend
+0% since 2026-08-26

Your Rankings

Community Sentiment
SELLINGBUYING
CategoryCommunityYour Ranking
Overall (0)Log in to rank
Management (0)Log in to rank
Financials (0)Log in to rank
Jurisdiction (0)Log in to rank
Project Quality (0)Log in to rank

Management Team

President and Chief Executive Officer of Ivanhoe Mines Ltd, appointed CEO February 24, 2025 after serving as President since 2020 and CFO from 2009-2020.

Chief Financial Officer of Ivanhoe Mines Ltd, with the company since 2011.

Founder and Executive Co-Chairman of Ivanhoe Mines. Widely credited with two of the largest base-metal discoveries of the past several decades: the Voisey's Bay nickel-copper-cobalt deposit in Labrador (discovered via Diamond Fields Resources and sold to Inco in 1996) and the Kamoa-Kakula copper discovery in the Democratic Republic of Congo, developed through Ivanhoe Mines into one of the world's largest copper mines. Also carries a well-documented setback early in his career: Galactic Resources' Summitville mine in Colorado, which ended in bankruptcy and a major environmental cleanup. A fixture on Rick Rule's "Living Legends" panels.

Chief Operating Officer of Ivanhoe Mines Ltd, appointed January 1, 2026, bringing nearly four decades of mining and mine-development experience across Southern Africa.

Insiders, Investors & Smart Money

Notable shareholders and insiders whose involvement is worth knowing about, plus what we're seeing from institutional/large-investor activity.

Smart money

No smart-money tracking (institutional/large-investor activity) for this miner yet — this is a planned feature, not live data.

No notable insiders tracked for this miner yet.

Reports, Presentations & Documents

Technical Report Takeaways

Multi-asset producer across three countries/projects with different ownership percentages (Kamoa-Kakula 39.6%, Kipushi 68%, Platreef 64%) -- no single consolidated corporate-level dcfNpvUsd/irrPct/technicalReportPriceAssumptionUsd figure exists. ouncesFound is deliberately left null: this repo has an explicit, still-open, repo-wide policy question on the ouncesFound/copper unit mismatch (Task #324) that prior copper backfills (Ero Copper, Gunnison Copper, Anglo Asian, and BHP/SCCO/FCX in this same backlog) have all deliberately declined to resolve unilaterally on a single company -- this record follows that same established convention. mineLifeYears (25, Kamoa-Kakula) is used instead to satisfy the deposit-data gate, per the mine plan's own stated steady-state operating horizon.