GSP Resource Corp.
GSP Resource Corp. explores for copper, gold, silver, molybdenum and palladium in British Columbia. Its flagship is the 100%-owned Alwin Copper-Silver-Gold Project, a brownfield past-producing mine in the Kamloops Mining Division, which hosts a current NI 43-101 Inferred Mineral Resource of 1,455,056 tonnes at 1.08% Cu (34.6 million pounds of contained copper), effective 16 September 2024, prepared by APEX Geoscience Ltd. and filed on SEDAR+ in January 2025; the estimate is split between a pit-constrained 0.2% Cu cut-off and an out-of-pit underground 0.8% Cu cut-off, and is Inferred only. The company also holds the 185-hectare Mer Claims in the Highland Valley Copper Camp near Logan Lake, BC (adjacent to Teck's Highland Valley Copper mine) and the 3,021.87-hectare Olivine Mountain Project in the Similkameen Mining Division. No economic study (PEA, PFS or feasibility) has been completed on Alwin; 2026 work is exploration-led, with a Phase 1 drill program of roughly 1,801 metres over eight holes at Alwin and Mer completed in August 2026 and assays pending.
Notable vs. Peers
- Jurisdiction risk score of 10/10 is meaningfully safer than the peer average of 7.6/10.
Lifecycle Milestones
A relative ranking of how closely this company matches the profile of juniors that have actually been acquired — not a probability, and not a reason to buy. Acquisitions are rare: only a few dozen significant deals happen a year across a universe of thousands of juniors, so even a high score here describes a long shot. The strongest signal the underlying research identifies — whether a major already holds a JV, earn-in, or 5–19.9% strategic stake — isn't tracked yet and is absent from this score.
Trend data collecting — check back after a few more refreshes.
Your Rankings
Management Team
Chief Financial Officer of GSP Resource Corp. (CA). Over 35 years of public company experience; Bachelor of Commerce from UBC (1976), articled with Thorne Riddell (now KPMG), obtained accounting designation in 1981. Established his own accounting practice in 1981 and has served as an officer and director of public reporting issuers in Canada and the United States.
President, Chief Executive Officer and Director of both Aztec Minerals Corp. (since 2022) and GSP Resource Corp. (since 2018) -- concurrent seats at two real, distinct companies, confirmed by both companies' own management pages, not a duplicate role. Also serves as a director of IDEX Metals Corp. (since 2025), Independent Director of Essex Resources Corp. (since 2024), and Independent Director of Apogee Minerals Ltd. (since 2018). Over twelve years of corporate development and capital markets experience, formerly with Bank of Tokyo-Mitsubishi UFJ, Royal Bank of Canada, Salman Partners and Leede Financial. Holds an MBA from UBC, is a CFA charterholder, and holds an undergraduate finance degree from the University of Western Ontario. (Task #526 merge; sourced from Aztec Minerals' and GSP Resource's own management pages.)
Insiders, Investors & Smart Money
Notable shareholders and insiders whose involvement is worth knowing about, plus what we're seeing from institutional/large-investor activity.
Checked directly against the company's own site, which is live. No producer, specialist fund or named institution holds a disclosed position, and there are no insider trading records in our data.
No notable insiders tracked for this miner yet.
Reports, Presentations & Documents
NI 43-101 Technical Report on the Alwin Copper-Silver-Gold Project, Kamloops Mining Division -- effective 16 Sep 2024, report date 17 Jan 2025, filed SEDAR+ 20 Jan 2025, prepared by APEX Geoscience Ltd. (QP Warren Black, M.Sc., P.Geol./P.Geo., resource estimation; QP Kristopher J. Raffle, P.Geo. (B.C.), technical review). Inferred Mineral Resource only: 1,455,056 t @ 1.08% Cu = 34.6 Mlbs Cu, being 918,326 t @ 1.13% Cu (22.9 Mlbs) at a 0.2% Cu pit-constrained cut-off plus 536,730 t @ 0.98% Cu (11.7 Mlbs) at a 0.8% Cu out-of-pit underground cut-off. CIM 2014 Definition Standards / 2019 Best Practice Guidelines; US$4.30/lb Cu, 95% Cu recovery, US$15/t processing, US$2/t G&A, US$2.00/t mining, 45-degree pit slopes; historical mined-out voids removed from the block model. Copper only -- no Ag/Au credits, as many pre-2008 holes were never assayed for precious metals. This is a CURRENT estimate, not a historical one: the separate 1982 Dekalb Mining figure (390,000 t @ 2.5% Cu) carries the 'not treating as current mineral resources' disclaimer and was superseded by this MRE. No PEA, scoping study, PFS or feasibility study exists on Alwin as of Aug 2026. (Task #114: the prior STAGE FLAG on this field is resolved -- stage corrected GRASSROOTS -> RESOURCE_DEFINITION.)
No reports or presentations linked yet.