JUNIORMETRICS
Gold$4,479.95/oz
Silver$66.98/oz
Copper$6.00/lb

Goldstone Resources Limited

GRL·$0.01·$11.5M cap
GoldAkrokeri-Homase Gold Project (Ashanti region, Ghana) Map

Goldstone Resources Limited (AIM: GRL, Jersey-incorporated) is a gold producer and explorer in Ghana's Birimian Gold Belt. It holds a 100% interest in the Akrokeri Licence (former underground mine, being reassessed) and a 90% interest in the Homase Licence, where it is currently mining near-surface oxide material from Pit 3, targeting a steady-state production rate of 1,000oz/month; the company produced 2,917oz of gold in H1 2025. A JORC 2012-compliant Mineral Resource of 10.6Mt at 1.77g/t gold for 602,000oz along a 4.4km strike (compiled by independent consultants SEMS Exploration Services Limited) is still presented by the company as its current resource for the combined Homase/Akrokerri project. NOTE (Task #373 candidate-vs-current check): the UniverseCandidate's ticker GRL is shared with an unrelated ASX-listed company, Godolphin Resources Ltd; that row is livenessStatus DORMANT and out of this batch's scope, left untouched.

Notable vs. Peers

  • Financials score of 1/10 is weaker than the peer average of 6.5/10.
  • Jurisdiction risk score of 5/10 is meaningfully riskier than the peer average of 7.8/10.

Lifecycle Milestones

Grassroots
Resource Def.
PEA
PFS
Feasibility
Permitting
Construction
ProductionCurrent

Construction Milestones

5 of 5 reached
  1. Reached — date not disclosed · Ghana EPA granted the environmental permit for the Homase South Pit within the Akrokeri-Homase (AKHM) project, the final key permit (alongside the mining operating permit and water use permit) required before construction/mining could proceed -- reported February 12, 2021, following the 10-year Mining Lease's Parliamentary Ratification on December 22, 2020. Exact grant day not independently confirmed from available sourcing -- recorded reached-but-undated. · Source
  2. Mar 2020 · No release titled 'Board approves construction' or 'FID' was found; the clearest dated, sourced instance of the board committing capital specifically to construct (rather than explore/permit) is Goldstone's Mar 16, 2020 RNS 'Funding of up to US$4.3m to commence production' (US$3.0m secured gold loan plus US$1.3m of bonds with warrants), which states the funds will let Goldstone 'move forward rapidly with the development of the Homase South Pit and the construction of a low cost cyanide heap leach facility,' targeting production in H2 2020 (independently re-fetched and confirmed from investegate.co.uk). This followed completion of Goldstone's Definitive Economic Plan (feasibility study) for AKHM, announced June 27, 2019. Same financing-commits-capital-to-construction convention already used for this campaign's DMET/Zancudo CONSTRUCTION_DECISION row (Trafigura prepayment facility) and MUX/Stock Mine. · Source
  3. Reached — date not disclosed · Construction of the elution plant and smelt house at Homase began in September 2021. Exact day not confirmed from available sourcing -- recorded reached-but-undated. · Source
  4. Nov 2021 · GoldStone Resources completed its first commercial gold pour at the Homase open pit mine, Ashanti Gold Belt, Ghana -- 14.46kg of gold bars from the first smelt. · Source
  5. Reached — date not disclosed · Genuinely reached (a real milestone), but imprecisely dated across sources: Goldstone completed its first commercial gold pour at the Homase Mine (Ashanti Gold Belt, Ghana) during the commissioning of its Smelt House, reported in a range of late November 2021 to January 2022 across different sources with no single corroborated exact day. Left null rather than guess between the conflicting reported dates. This row was missing entirely prior to 2026-08-21 -- a genuine data gap, not a stage error; Miner.stage was already correctly PRODUCTION. · Source

Milestones are recorded only from a company's own dated disclosure. A milestone with no date shown is one we can confirm was reached but for which no date was disclosed — we don't estimate one. "Not yet reached" means exactly that, not that a date is missing. An "Expected" line likewise only ever reflects the company's own guidance (e.g. a study or permit decision targeted for a stated quarter) — most not-yet-reached milestones have none, and that absence means no such guidance has been disclosed, not that one is overdue.

10/10
Weak track recordStrong track record
1/10
Thin runwayWell-capitalized
5/10
High riskLow risk
How this is calculated
3.9/10
Weaker depositStronger deposit
5/10
Weaker profileStronger profile
Price Chart
$0.004$0.006$0.011$0.009$0.007AugNovFebJunSep
Aug 12, 2025Sep 4, 2026
News
$0.01
+56.4%from low-72.6%from high
$0.00$0.03
$11.5M
Far belowFar above
$563.3M median
Price (USD - Local)
$0.01 - GBP 0.01
Cash Position (USD)
$434.9K
Far belowFar above
$92.4M median
Debt (USD)
$11.6M
Far aboveFar below
$5.7M median
$22.6M
Far belowFar above
$527M median
1.3B
Far aboveFar below
303M median
Jurisdiction
Ghana
602,000 oz
Far belowFar above
1.3M median
$37.62/oz
Far aboveFar below
$158.80/oz median
Cut-off: 0.5 g/t Au
This company's data hasn't been researched yet
Open-pit (Homase Pit 3, oxide) + historical underground workings (Akrokeri, under review)
This company's data hasn't been researched yet
This company's data hasn't been researched yet
Not enough peer data yet
This company's data hasn't been researched yet
Not enough peer data yet
This company's data hasn't been researched yet
17.6%
0%100%
19.3% median
This company's data hasn't been researched yet
This company's data hasn't been researched yet
This company's data hasn't been researched yet
This company's data hasn't been researched yet
This company's data hasn't been researched yet
This company's data hasn't been researched yet
Acquisition Susceptibility
6.1/10
Unlikely bolt-onFits the takeout profile

A relative ranking of how closely this company matches the profile of juniors that have actually been acquired — not a probability, and not a reason to buy. Acquisitions are rare: only a few dozen significant deals happen a year across a universe of thousands of juniors, so even a high score here describes a long shot. The strongest signal the underlying research identifies — whether a major already holds a JV, earn-in, or 5–19.9% strategic stake — isn't tracked yet and is absent from this score.

Overall Score Trend
+4.2% since 2026-08-12

Your Rankings

Community Sentiment
SELLINGBUYING
CategoryCommunityYour Ranking
Overall (0)Log in to rank
Management (0)Log in to rank
Financials (0)Log in to rank
Jurisdiction (0)Log in to rank
Project Quality (0)Log in to rank

Management Team

Chief Executive Officer of Goldstone Resources Limited (AIM: GRL), which holds a 100% interest in the Akrokeri project and a 90% interest in the Homase project in Ghana. BEng, CEng, CRICS. Also serves as Independent Non-Executive Director of Oracle Power plc since July 24, 2024.

Non-Executive Chairman of Goldstone Resources Limited.

Insiders, Investors & Smart Money

Notable shareholders and insiders whose involvement is worth knowing about, plus what we're seeing from institutional/large-investor activity.

Smart money
1/10

The company's own website states it is supported, financially and technically, by major shareholder Paracale Gold Ltd, described elsewhere as a mining investment specialist -- real, named backing, though the exact size of the stake could not be confirmed from available sources.

No notable insiders tracked for this miner yet.

Reports, Presentations & Documents

Technical Report Takeaways

We haven't parsed this company's PEA/PFS/FS recommendations yet — cut-off grade, mine life, DCF/NPV, and the report's own next-steps guidance are a planned research pass, not live data for every company yet.