JUNIORMETRICS

Guardian Metal Resources PLC

GMTL·GMET·US$1.28 (GBP 0.96)·US$249.6M cap
OtherPilot Mountain & Tempiute Tungsten Projects, Nevada, USA Map

Guardian Metal Resources PLC is developing tungsten (WO3) projects in Nevada: the flagship Pilot Mountain project and the earlier-stage Tempiute project (maiden resource pending). The Pilot Mountain Pre-Feasibility Study (published mid-2026) outlines a 4,000 t/d open-pit operation with US$288.7 million initial capex, producing ~1,990 t/y WO3 in concentrate over an initial 8-year mine life (15,916 t WO3 total), for after-tax free cash flow of US$1.058 billion, an after-tax NPV (8% discount) of US$660.3 million and a post-tax IRR of 59.6% at a base-case tungsten price of US$197,300/t WO3, with a one-year capital payback from first commercial production. The company received a US$6.2 million non-dilutive award under US Defense Production Act Title III and raised US$21 million in equity to advance its Nevada tungsten projects, reflecting the strategic-minerals policy backdrop for US-sourced tungsten. For the six months ended 31 Dec 2025, the group reported a loss of US$5.2 million and total assets of US$37.6 million. Oliver Friesen is Chief Executive Officer; Jake Mather was appointed Chief Financial Officer effective 26 Mar 2026.

Notable vs. Peers

  • Financials score of 6.9/10 is stronger than the peer average of 4.9/10.
  • Trading within 2% of its 52-week low — weak recent price momentum.

Lifecycle Milestones

Grassroots
Resource Def.
PEA
PFSCurrent
Feasibility
Permitting
Construction
Production
5.1/10
Weak track recordStrong track record
5.1/10 vs.
6.9/10
Thin runwayWell-capitalized
6.9/10 vs.
How this is calculated
Not scored (no size scale for tungsten)
21,600 t WO₃ on file
Weaker depositStronger deposit
How this is calculated
6.6/10
Harder place to buildEasier place to build
6.6/10 vs.
What goes into it
  • Jurisdiction (40%)9/10

    Nevada: Fraser PPI 2025 is 100.00 of 100 (rank 1 of 68), which maps to 9 on this site's scale. Nevada, USA -- Tier-1 mining jurisdiction; the projects also carry US strategic-minerals policy tailwinds (Defense Production Act Title III funding) given tungsten's critical-minerals status.

  • Infrastructure (40%)No verified figure

    Researched with nothing found: no source we could cite confirms or rules out an existing mill, road access, grid power, or tailings facility at Pilot Mountain Tungsten Project, Mineral County, Nevada, USA (checked Sep 26, 2026; recheck due Mar 25, 2027). Counts at a neutral 5/10 until one does.

  • Nearby producing mine (20%)Not yet researched

    No project coordinates on file yet, so distance to a producing mine can't be measured.

5.9/10
Weaker profileStronger profile
5.9/10 vs.
Price Chart
$0.743$1.38$3.48$2.33$1.25AugDecMarJulOct
Aug 12, 2025 – Oct 20, 2026
News
$1.28
+4.1%from low-68.8%from high
$1.23$4.10
$249.6M
Far belowFar above
$249.6M vs. $15.6M peer median
Price (USD - Local)
US$1.28 (GBP 0.96)
Cash Position (USD)
$52.5M
Far belowFar above
$52.5M vs. $1.7M peer median
Debt (USD)
Far aboveFar below
$0 vs. $0 peer median
$197.2M
Far belowFar above
$197.2M vs. $12.5M peer median
194.8M
Far aboveFar below
194.8M vs. 233.6M peer median
Jurisdiction
United States
21,600 t WO₃
Feeds Deposit Quality score
Indicated21,600 t WO₃
Inferrednot scored3,400 t WO₃
Total resource25,000 t WO₃
Not enough peer companies report this metric
Compares M&I only — Inferred isn't compared or scored.
$9,128.42/t
M&I
Total resource (incl. Inferred)$7,886.95/t
Not enough peer companies report this metric
Cut-off: 0.04% WO3 cut-off -- applies identically to both the Mineral Resource and the Mineral Reserve at Pilot Mountain (Desert Scheelite + Garnet deposits). Basis: US$115,000/t WO3 price, 75% recovery, 4,000 t/d processing rate, US$3.50/t open-pit mining cost, US$23.00/t processing cost, US$5.17/t processed G&A, 82% payability. Mineral Resource (effective 2026-05-26): Indicated 12,136kt @ 0.178% WO3 (21,600t contained WO3, 9.93 g/t Ag / 3,877koz Ag); Inferred 2,297kt @ 0.150% WO3 (3,400t contained WO3). Mineral Reserve/Probable (effective 2026-06-15): 11,822kt @ 0.171% WO3 (20,275t contained WO3, 9.28 g/t Ag / 3,529koz Ag) -- same 0.040% WO3 cutoff applied.
Pre-feasibility stage, no active mine
8 yrs2026 study
Far belowFar above
8 yrs vs. 17.5 yrs peer median
$58,151/t WO32026 study
@8%$660.3M(at $197,300/t WO3)2026 study
Far belowFar above
$660.3M vs. $527.5M peer median
0.38x2026 study
Far aboveFar below
0.38x vs. 0.08x peer median
0.30x2026 study
Far aboveFar below
0.30x vs. 0.08x peer median
$288.7M2026 study
Far aboveFar below
$288.7M vs. $471M peer median
2.3xClears Durrett's 2:1 bar2026 study
Far belowFar above
2.3x vs. 1.8x peer median
$197,300/t WO32026 study
60%Clears Durrett's 25% developer bar2026 study
Far belowFar above
60% vs. 28% peer median
-$32.1M
Far belowFar above
-$32.1M vs. -$2.9M peer median
-$0.165
Far belowFar above
-$0.165 vs. -$0.011 peer median

Acquisition Susceptibility

How this is calculated
7.2/10
Unlikely bolt-onFits the takeout profile

A relative ranking of how closely this company matches the profile of juniors that have actually been acquired — not a probability, and not a reason to buy. Acquisitions are rare: only a few dozen significant deals happen a year across a universe of thousands of juniors, so even a high score here describes a long shot. The strongest signal in the research, a producer that already owns part of the company, is scored from its disclosed strategic shareholders. A producer that is a joint-venture or earn-in partner on the project, rather than a shareholder, isn't captured yet.

How this score is built

  • Disclosed pending deal
    Sub-score: Not scored

    No pending acquisition or merger disclosed (checked)

    Not scored: having no deal in flight isn't held against a company.

    Weight 26.25%
  • Producer's strategic stake
    Sub-score: Not scored

    No producer holds a disclosed stake on file (holder register researched) See holders

    Not scored: most juniors that do get bought had no prior toehold, so a missing stake says little either way.

    Weight 25%
  • Distance to a producing mine
    Sub-score: Not yet researched

    Distance not yet researched: no project coordinates on file

    Distance can't be measured without coordinates, so excluded rather than counted as far.

    Weight 22.5%
  • Lifecycle stage
    Sub-score:
    8/10

    Stage: Pre-Feasibility Study

    Feasibility and permitting score 10, where deals cluster, and production 5.5; earlier stages score less, down to 1 at grassroots.

    Weight 15% · 57% here
  • Jurisdiction
    Sub-score:
    9/10

    United States: jurisdiction score 9/10

    Our jurisdiction score, used as is: higher means lower political and permitting risk.

    Weight 6.75% · 26% here
  • Commodity
    Sub-score:
    2/10

    Primary commodity: Other

    Gold 10, copper 8, silver 5, nickel and uranium 4, others 2: most majors' deals are for gold.

    Weight 4.5% · 17% here

Weight is each input's share of the full score. “Here” is its share of this company's score: inputs that aren't scored are left out and the rest re-weighted, never counted as zero.

Overall Score Trend
+7.3% since 2026-08-09 · -10.6% from peak

Your Rankings

Community Sentiment
—SELLINGBUYING
CategoryCommunityYour Ranking
Overall— (0) 
Management— (0) 
Financials— (0) 
Jurisdiction— (0) 
Project Quality— (0) 

Management Team

Chief Executive Officer of Guardian Metal Resources PLC.

Chief Financial Officer of Guardian Metal Resources PLC, appointed effective 26 Mar 2026.

Insiders, Investors & Smart Money

Notable shareholders and insiders whose involvement is worth knowing about, plus what we're seeing from institutional/large-investor activity.

Smart money
3/10

Goehring & Rozencwajg Resources, a real specialist fund, holds a small stake. Five insiders bought stock on the open market repeatedly through the trailing year with no offsetting selling on record.

No notable insiders tracked for this miner yet.

Reports, Presentations & Documents

Technical Report Takeaways

Guardian Metal Resources is developing tungsten projects in Nevada: the 100%-owned Pilot Mountain project in Mineral County, which has a pre-feasibility study, and the earlier-stage Tempiute project. Pilot Mountain's indicated resource, effective 26 May 2026, is 12,136 kt at 0.178% WO3 for 21,600 t of contained WO3, with 3,400 t more inferred, and the probable reserve is 11,822 kt at 0.171% WO3. The pre-feasibility study published in mid-2026 outlines a 4,000 t/d open-pit operation and shows an after-tax NPV8% of US$660.3M and a 59.6% IRR at US$197,300/t WO3, with initial capital of US$288.7M, an 8-year mine life producing about 1,990 t of WO3 a year, and an all-in sustaining cost of US$58,151/t of WO3 in concentrate. The company received a US$6.2M award under the US Defense Production Act Title III, and drilling in 2026 has reported tungsten results from the Tremor and Good Hope zones beyond the resource used in the study.