Generation Mining LimitedG

GENMF·GENM·US$0.32 (CAD 0.46)·US$226.3M cap
Multi-Metalalso:Marathon Copper-Palladium Project (Marathon, Geordie & Sally deposits, Ontario, Canada) Map

Generation Mining Limited (TSX: GENM; OTCQB: GENMF) is a Canadian development-stage company advancing the 100%-owned Marathon Copper-Palladium Project near Marathon, Ontario -- a combined open-pit resource across the Marathon, Geordie and Sally deposits. The 2025 Feasibility Study (Ausenco, effective 1 Nov 2024) outlines a 12.5-year open-pit mine and process plant with an after-tax NPV6% of C$1.07 billion, 28% IRR and 1.9-year payback (3-year trailing average metal prices), and average annual payable production of 42 Mlb copper, 168 koz palladium, 38 koz platinum, 12 koz gold and 240 koz silver. Revenue is roughly evenly split between palladium (52%) and copper (34% at FS-case prices), with platinum/gold/silver as further byproducts. Initial capital is C$992 million. The project is fully permitted federally and awaiting the final Ontario provincial permit; a Wheaton Precious Metals PMPA (precious-metals purchase agreement) is part of the financing structure.

Notable vs. Peers

  • Financials score of 6.5/10 is stronger than the peer average of 4.9/10.

Lifecycle Milestones

Grassroots
Resource Def.
PEA
PFS
FeasibilityCurrent
Permitting
Construction
Production
Prior Ownership & Infrastructure
Road AccessGrid Power5.7/10 built out

Not in place: mill, tailings facility.

5.4/10
Weak track recordStrong track record
5.4/10 vs.
6.5/10
Thin runwayWell-capitalized
6.5/10 vs.
How this is calculated
5.9/10
Weaker depositStronger deposit
5.9/10 vs.
How this is calculated
7.7/10
Harder place to buildEasier place to build
7.7/10 vs.
What goes into it
  • Jurisdiction (40%)9/10

    Ontario: Fraser PPI 2025 is 93.70 of 100 (rank 5 of 68), which maps to 9 on this site's scale. Marathon Copper-Palladium Project sits near the Town of Marathon, Northwestern Ontario, Canada -- a stable, top-tier-rule-of-law jurisdiction with an active domestic critical-minerals financing push (Canada Growth Fund, Canada Infrastructure Bank both anchor investors in the project's own recent financing round).

  • Infrastructure (40%)5.7/10

    No confirmed mill, confirmed road access, confirmed grid power, and no confirmed tailings facility at Marathon Copper-Palladium Project (Marathon, Geordie & Sally Deposits), Ontario, Canada.

  • Nearby producing mine (20%)9.3/10

    Williams (Hemlo) (Hemlo Mining Corp.) is 31 km away -- within regional-platform range.

6.4/10
Weaker profileStronger profile
6.4/10 vs.
Price Chart
$0.268$0.601$0.45$0.436$0.324SepDecAprJulOct19
Sep 19, 2025 – Oct 15, 2026
News
$0.32
+26%from low-50.7%from high
$0.26$0.66
$226.3M
Far belowFar above
$226.3M vs. $16.2M peer median
Price (USD - Local)
US$0.32 (CAD 0.46)
Cash Position (USD)
$23.6M
Far belowFar above
$23.6M vs. $1.7M peer median
Debt (USD)
Far aboveFar below
$0 vs. $0 peer median
$202.8M
Far belowFar above
$202.8M vs. $12.7M peer median
697.8M
Far aboveFar below
697.8M vs. 232M peer median
Jurisdiction
Canada
4,039,000 oz
Feeds Deposit Quality score
Measured2,973,000 oz
Indicated1,066,000 oz
Inferrednot scored370,000 oz
Total resource4,409,000 oz
Far belowFar above
4M oz vs. 8.5M oz peer median
Compares M&I only — Inferred isn't compared or scored.
$50.20/oz
M&I
Total resource (incl. Inferred)$45.99/oz
Peer median $5.15/oz
Far aboveFar below
$50.20/oz vs. $7.63/oz peer median
12.5 yrs2024 study
Far belowFar above
12.5 yrs vs. 17.5 yrs peer median
All-In Sustaining Cost
$765M2024 study
Far belowFar above
$765M vs. $527.5M peer median
0.30x2024 study
Far aboveFar below
0.30x vs. 0.08x peer median
0.27x2024 study
Far aboveFar below
0.27x vs. 0.08x peer median
$709.2M2024 study
Far aboveFar below
$709.2M vs. $462M peer median
1.1xBelow Durrett's 2:1 bar2024 study
Far belowFar above
1.1x vs. 1.8x peer median
28%Clears Durrett's 25% developer bar2024 study
Far belowFar above
28% vs. 30% peer median
31 kmfrom Hemlo Mining Corp.'s Williams (Hemlo)
Within regional-platform range (~50km)
-$10.2M
Far belowFar above
-$10.2M vs. -$2.9M peer median
-$0.015
Far belowFar above
-$0.015 vs. -$0.011 peer median

Acquisition Susceptibility

How this is calculated
7.7/10
Unlikely bolt-onFits the takeout profile

A relative ranking of how closely this company matches the profile of juniors that have actually been acquired — not a probability, and not a reason to buy. Acquisitions are rare: only a few dozen significant deals happen a year across a universe of thousands of juniors, so even a high score here describes a long shot. The strongest signal in the research, a producer that already owns part of the company, is scored from its disclosed strategic shareholders. A producer that is a joint-venture or earn-in partner on the project, rather than a shareholder, isn't captured yet.

How this score is built

  • Disclosed pending deal
    Sub-score: Not scored

    No pending acquisition or merger disclosed (checked)

    Not scored: having no deal in flight isn't held against a company.

    Weight 26.25%
  • Producer's strategic stake
    Sub-score: Not scored

    No producer holds a disclosed stake on file (holder register researched) See holders

    Not scored: most juniors that do get bought had no prior toehold, so a missing stake says little either way.

    Weight 25%
  • Distance to a producing mine
    Sub-score:
    6.9/10

    Nearest producing mine: Williams (Hemlo) (Hemlo Mining Corp.), 31 km

    10 next to a producing mine, 8 at 20 km, 5 at 50 km, 0 beyond 200 km.

    Weight 22.5% · 46% here
  • Lifecycle stage
    Sub-score:
    10/10

    Stage: Feasibility Study

    Feasibility and permitting score 10, where deals cluster, and production 5.5; earlier stages score less, down to 1 at grassroots.

    Weight 15% · 31% here
  • Jurisdiction
    Sub-score:
    9/10

    Canada: jurisdiction score 9/10

    Our jurisdiction score, used as is: higher means lower political and permitting risk.

    Weight 6.75% · 14% here
  • Commodity
    Sub-score:
    2/10

    Primary commodity: Other

    Gold 10, copper 8, silver 5, nickel and uranium 4, others 2: most majors' deals are for gold.

    Weight 4.5% · 9% here

Weight is each input's share of the full score. “Here” is its share of this company's score: inputs that aren't scored are left out and the rest re-weighted, never counted as zero.

Overall Score Trend
-17.9% since 2026-09-19 · -17.9% from peak

Your Rankings

Community Sentiment
—SELLINGBUYING
CategoryCommunityYour Ranking
Overall— (0) 
Management— (0) 
Financials— (0) 
Jurisdiction— (0) 
Project Quality— (0) 

Management Team

Chairman of Generation Mining Limited. Co-founder with four decades of mining company experience -- founded Wheaton River (parent of Wheaton Precious Metals), Thompson Creek Metals (major molybdenum producer), and Glencairn Gold (three Central American operating mines).

Director of Generation Mining Limited since 2011. B.A.Sc., P.Eng. Senior Geophysicist & Head of Smart Geophysical Interpretation at Xcalibur Smart Mapping; formerly President of Paterson, Grant & Watson Limited (2016-2025).

Chief Financial Officer of Signature Resources Ltd.; also Director, Audit Committee Chair of Generation Mining Limited. Chartered Professional Accountant with 23 years' experience, including senior audit roles at Grant Thornton LLP and PricewaterhouseCoopers.

Director of Generation Mining Limited. MBA. Mining project executive with over a decade of experience leading large-scale mining developments; currently at Equinox Gold overseeing project development, prior roles managing the Valentine Gold Project construction at Marathon Gold, plus JDS Energy & Mining, Nuna Group and Stantec.

President, CEO and Director of Generation Mining Limited; also a non-executive director of Montero Mining and Exploration Ltd. Approximately 22 years of experience in the mining industry; previously President and CEO of Pine Point Mining (2013-2018).

COO of Generation Mining Limited, appointed June 2026. B.A.Sc., Mining Engineer. Four decades of international experience in operations, project development and executive leadership; led De Beers' Victor Diamond Mine development in Northern Ontario through construction and commissioning.

Non-Executive Director of PMET Resources Inc.; also Chief Financial Officer of Generation Mining Limited.

VP Projects of Generation Mining Limited. Project leader with 25+ years of international experience in mining and engineering, specializing in multibillion-dollar developments and EPCM/EPC delivery models; previously senior roles at Ausenco, DRA and Wood.

VP Finance of Generation Mining Limited, appointed June 2026. 18 years' finance experience in the mining sector spanning project development, construction, production and ongoing operations.

EVP Corporate Affairs and Human Resources of Generation Mining Limited. 30+ years' experience in Human Resources, Governance and Sustainability within the mining industry; held senior positions at Detour Gold, Kirkland Lake Gold, De Beers Canada and NexGold Mining.

VP Engineering of Generation Mining Limited. Mechanical engineer with an MBA, 27+ years building mines worldwide; former Senior VP Engineering (EMEA) at DRA Global with experience at Glencore/Xstrata, Anglo Platinum and Impala Platinum.

Director of Generation Mining Limited. P.Geo, P.Eng. Former President and CEO of Marathon Gold Corporation (2010-2019); founded Marathon PGM Corporation, owner of the Marathon Palladium-Copper Project, guided it through advanced exploration until Stillwater Mining Company's 2010 takeover for US$118 million.

Insiders, Investors & Smart Money

Notable shareholders and insiders whose involvement is worth knowing about, plus what we're seeing from institutional/large-investor activity.

Smart money

No smart-money tracking (institutional/large-investor activity) for this miner yet — this is a planned feature, not live data.

No notable insiders tracked for this miner yet.

Reports, Presentations & Documents

Technical Report Takeaways

Generation Mining owns 100% of the Marathon copper-palladium project near Marathon, Ontario, a combined open-pit resource across the Marathon, Geordie and Sally deposits, where palladium provides 52% of feasibility-case revenue and copper 34%. Measured and indicated resources contain 4,039,000 oz of palladium (2,973,000 oz measured and 1,066,000 oz indicated), plus 370,000 oz inferred, effective 1 November 2024, alongside 1,091 Mlb of copper and platinum, gold and silver. The 2025 feasibility study shows an after-tax NPV6% of US$765.0M (CAD 1.07B) and a 27.6% IRR at three-year trailing average metal prices, with initial capital of US$709.2M (CAD 992M) and a 12.5-year mine life producing on average 42 Mlb of copper and 168,000 oz of palladium a year. The project holds its federal permits and awaits its final Ontario permit, and in September 2026 the company secured the final tranche of a construction financing package of about US$1.3B, which includes a Wheaton Precious Metals precious-metals purchase agreement; the board expects to make a construction decision once all tranches close and after a special shareholder meeting targeted for the fourth quarter of 2026.