JUNIORMETRICS
Gold$4,479.95/oz
Silver$66.98/oz
Copper$6.00/lb

ExGen Resources Inc.

EXG·$0.08·$8M cap
Copperalso:Empire Mine Project, Alder Creek district, Custer County, Idaho, USA -- 20% interest via Konnex Resources Inc. (Phoenix Copper Ltd 80%, operator) Map

ExGen Resources Inc. (TSXV: EXG; OTC: BXXRF), Vancouver-headquartered, is a copper-gold-lithium explorer whose principal asset is a 20% equity interest in Konnex Resources Inc., holder of the Empire Mine Project in the Alder Creek district near Mackay, Custer County, Idaho. Phoenix Copper Ltd (AIM:PXC / OTCQX:PXCLF) holds the other 80% and is the operator -- Konnex constructs and operates the project. Empire is a genuine PFS-stage development asset: the Pre-Feasibility Study published 19 Sep 2024 carries an inaugural Proven+Probable reserve of 10,097 kt @ 0.49% Cu / 0.32 g/t Au / 14.34 g/t Ag (109.5 Mlb Cu, 104 koz Au, 4.65 Moz Ag) at an NSR US$22.59/t cut-off, an 8-year open pit, US$62.6m capex, and after-tax NPV-7.5 of US$73.75m at a 40.2% IRR. Under a Carried Interest Agreement signed 17 Dec 2024, Phoenix funds 100% of ExGen's 20% share of construction and operating costs via a loan to Konnex, repaid from ExGen's 20% share of project profits; ExGen also holds 1,330,000 Phoenix shares. Execution risk is high and independent of the study's quality: only US$5m of Phoenix's US$80m NIU Invest SE copper bond was ever drawn, a replacement US$75m LOI did not close, Phoenix disclosed unauthorised payments in February and March 2026, and NIU requisitioned an EGM in April 2026 seeking an independent investigation; permitting (Idaho Department of Lands mine plan and federal NEPA review) remains incomplete. ExGen's directly-held ground is all claim/drill-stage with no resource estimate: the Buena Vista Copper and Spark North Lithium projects in Nevada, plus the Telegraph (~350 km2) and Southmore (~50 km2) copper-gold projects and royalties on four Golden Triangle properties in British Columbia acquired when the MTB Metals Corp. plan of arrangement completed on 19 Dec 2025 (0.286 ExGen shares per MTB share). Stage and businessModel therefore follow the Empire interest, per this repo's settled treatment of non-operating JV holders (Teuton/Treaty Creek, Nickel 28/Ramu, Rand Mining/East Kundana) rather than the company's own immaterial exploration ground.

Lifecycle Milestones

Grassroots
Resource Def.
PEA
PFSCurrent
Feasibility
Permitting
Construction
Production
Weak track recordStrong track record
Thin runwayWell-capitalized
9/10
High riskLow risk
How this is calculated
5.3/10
Weaker depositStronger deposit
7.2/10
Weaker profileStronger profile
Price Chart
$0.072$0.093$0.108$0.079$0.076AugNovFebJunSep
Aug 12, 2025Sep 4, 2026
Stage changeNews
$0.08
+31.9%from low-44.4%from high
$0.06$0.14
See who ↓
11.3%
Low alignmentHigh alignment
See who ↓
0%
Low alignmentHigh alignment
$8M
Far belowFar above
$41.2M median
Price (USD - Local)
$0.08 - CAD 0.11
Cash Position (USD)
This company's data hasn't been researched yet
Debt (USD)
This company's data hasn't been researched yet
$8M
Far belowFar above
$35.6M median
117.2M
Far aboveFar below
171.7M median
Jurisdiction
United States
This company's data hasn't been researched yet
This company's data hasn't been researched yet
Cut-off: NSR $22.59/tonne (2024 inaugural PFS-level reserve; currency not explicitly labeled in the source reviewed, treated as US$ given the project is in the US)
This company's data hasn't been researched yet
N/A -- non-operating 20% carried JV interest in the planned Empire open-pit copper-gold-silver mine (Custer County, Idaho); operator Phoenix Copper Ltd holds the other 80% of Konnex Resources Inc. and funds ExGen's share of construction and operating costs. ExGen's directly-held ground (Buena Vista Cu, Spark North Li, Nevada; Telegraph, Southmore Cu-Au, BC) is claim-stage with no active mine.
8 yrs
Far belowFar above
15 yrs median
@7.5%$73.8M(at $4.45/lb)
Far belowFar above
$930M median
0.54x
Far aboveFar below
0.36x median
$62.6M
Far aboveFar below
$136.6M median
1.2xBelow Durrett's 2:1 bar
Far belowFar above
2x median
$4.45/lb26% below reference ($6.00/lb)
40%Clears Durrett's 25% developer bar
Far belowFar above
25% median
11.3%
0%100%
14.8% median
0%
0%100%
2.5% median
This company's data hasn't been researched yet
This company's data hasn't been researched yet
This company's data hasn't been researched yet
This company's data hasn't been researched yet
This company's data hasn't been researched yet
Acquisition Susceptibility
8.3/10
Unlikely bolt-onFits the takeout profile

A relative ranking of how closely this company matches the profile of juniors that have actually been acquired — not a probability, and not a reason to buy. Acquisitions are rare: only a few dozen significant deals happen a year across a universe of thousands of juniors, so even a high score here describes a long shot. The strongest signal the underlying research identifies — whether a major already holds a JV, earn-in, or 5–19.9% strategic stake — isn't tracked yet and is absent from this score.

Overall Score Trend
+0% since 2026-08-15

Your Rankings

Community Sentiment
SELLINGBUYING
CategoryCommunityYour Ranking
Overall (0)Log in to rank
Management (0)Log in to rank
Financials (0)Log in to rank
Jurisdiction (0)Log in to rank
Project Quality (0)Log in to rank

Management Team

Director, Chairman and Chief Executive Officer of ExGen Resources Inc. President and Chief Executive Officer of the Corporation since May 5, 2014; Executive Vice-President since September 11, 2013. Previously led Konnex Resources Inc. and founded EVOS Media Inc.

Chief Financial Officer of ExGen Resources Inc. (CPA, CA, CFA). Two decades of experience in accounting, corporate advisory and strategic planning across technology, healthcare, finance, consumer goods and mining sectors in both private and public company roles.

Insiders, Investors & Smart Money

Notable shareholders and insiders whose involvement is worth knowing about, plus what we're seeing from institutional/large-investor activity.

Smart money
1/10

No institutional or strategic holder is on record, and no open-market insider buying was found. ExGen itself holds a stake in Phoenix Copper Limited (an outbound investment, not backing into ExGen), and is the ACQUIRER (not target) in a pending merger with MTB Metals Corp, so this does not affect the smart-money read on ExGen itself.

No notable insiders tracked for this miner yet.

Reports, Presentations & Documents

Technical Report Takeaways

Current governing technical study: the Empire Mine Pre-Feasibility Study, published by RNS on 19 Sep 2024 by Phoenix Copper Ltd (AIM:PXC / OTCQX:PXCLF), the 80% owner and operator of Konnex Resources Inc. ExGen holds the other 20%. Inaugural Proven+Probable reserve (first stated May 2024): 10,097 kt @ 0.49% Cu / 0.32 g/t Au / 14.34 g/t Ag = 109,487,970 lb Cu, 104,000 oz Au, 4,654,400 oz Ag, at an NSR cut-off of US$22.59/t. 8-year open pit; capex US$62.6m; total cash cost $2.44/lb CuEq; cumulative pre-tax net free cashflow US$152.98m. Economics: pre-tax NPV-7.5 US$87.86m / IRR 46.4%; after-tax NPV-7.5 US$73.75m / IRR 40.2%, on $4.45/lb Cu, $2,325/oz Au, $27.25/oz Ag (approx. spot at 15 Apr 2024). NOTE the mine-life discrepancy: several aggregators report a nine-year life; the PFS RNS itself says 8 years and is used here. All figures are 100%-project; ExGen's economic share is 20% (see projectOwnershipPct). No PEA, feasibility study or updated PFS has superseded it -- the project is in detailed engineering design, and Phoenix's RNS of 10 Apr 2026 restates the same reserve. CAUTION on execution risk, not on the study: construction is unfunded. Of the US$80m NIU Invest SE copper bond announced fully subscribed in May 2024 only one US$5m tranche was ever drawn (Jun 2024) and 'as no further funding has been forthcoming, the warrants have since been cancelled'; a replacement US$75m LOI (Jun 2025) did not close; Phoenix disclosed unauthorised payments on 9 Feb and 9 Mar 2026, and NIU (11.7%) requisitioned an EGM on 10 Apr 2026 seeking an independent investigation and disclosure of liquidity and near-term funding plans. Permitting is also incomplete (Idaho Department of Lands mine plan plus federal NEPA review). Hence stage=PFS and not PERMITTING/CONSTRUCTION. ouncesFound deliberately left null: the reserve above is the whole project's and no source disaggregates a figure attributable to ExGen's 20% carried (not equity-proportional) interest -- the same reason recorded on TUO/Teuton -- compounded by the copper-row convention that left VCU/VMXX/CY5/CCCM/BSX null.