Eloro Resources Ltd.

ELRRF·ELO·US$0.97 (CAD 1.36)·US$115.8M cap
SilverIska Iska Silver-Tin Polymetallic Project, Potosi Department, southern Bolivia Map

Eloro Resources Ltd. is advancing the large Iska Iska silver-tin polymetallic discovery in Potosi Department, southern Bolivia. An Apr 2026 updated Mineral Resource Estimate reported an Indicated Resource of 85.17Mt at 40 g/t Ag (78.38 g/t AgEq) containing 109.53Moz silver, plus an Inferred Resource of 945.43Mt at 8.5 g/t Ag (22.04 g/t AgEq) containing 248.60Moz silver -- over 350Moz of contained silver combined, alongside associated zinc, lead, and tin. Following the positive updated MRE, the company commenced an expansion diamond-drilling program (Major Drilling Group International engaged, two rigs mobilized with a third planned within three months; up to 40,000-50,000m planned across ~75 holes) aimed at better defining the higher-grade Ag-Sn zones ahead of a planned Preliminary Economic Assessment. The company was accepted into the U.S. Defense Industrial Base Consortium (reflecting the project's tin content) and has completed its option payments on the Iska Iska property. As of Mar 2026 the company held CA$25 million in cash and was debt-free. Chairman & CEO is Tom Larsen.

Notable vs. Peers

  • Jurisdiction risk score of 4/10 is meaningfully riskier than the peer average of 6.9/10.

Lifecycle Milestones

Grassroots
Resource Def.Current
PEA
PFS
Feasibility
Permitting
Construction
Production
Prior Ownership & Infrastructure
Road Access1 of 4 checked, 1 in place

Not yet determined: mill, tailings facility, grid power.

5.4/10
Weak track recordStrong track record
5.4/10 vs.
6.7/10
Thin runwayWell-capitalized
6.7/10 vs.
How this is calculated
5.2/10
Weaker depositStronger deposit
5.2/10 vs.
How this is calculated
5.2/10
Harder place to buildEasier place to build
5.2/10 vs.
What goes into it
  • Jurisdiction (40%)4/10

    Potosi Department, southern Bolivia -- a historic mining region with a long silver-mining tradition, but Bolivia carries real risk from political instability, resource-nationalism rhetoric, and a less predictable federal fiscal/permitting regime than top-tier jurisdictions.

  • Infrastructure (40%)6.4/10

    Confirmed road access at Iska Iska Silver-Tin Polymetallic Project, Potosi Department, Bolivia; existing mill, grid power, and tailings facility not yet researched, counted at a neutral 5/10 until established.

  • Nearby producing mine (20%)Not yet researched

    No project coordinates on file yet, so distance to a producing mine can't be measured.

5.6/10
Weaker profileStronger profile
5.6/10 vs.
Price Chart
$1.00$1.23$1.41$1.19$0.996AugDecMarJulOct
Aug 12, 2025 – Oct 20, 2026
News
$0.97
+19.9%from low-59.7%from high
$0.81$2.40
$115.8M
Far belowFar above
$115.8M vs. $20.4M peer median
Price (USD - Local)
US$0.97 (CAD 1.36)
Cash Position (USD)
$17.9M
Far belowFar above
$17.9M vs. $3.9M peer median
Debt (USD)
Far aboveFar below
$0 vs. $0 peer median
$97.9M
Far belowFar above
$97.9M vs. $16.2M peer median
119.7M
Far aboveFar below
119.7M vs. 134.9M peer median
Jurisdiction
Bolivia
109,530,000 oz
Feeds Deposit Quality score
Indicated109,530,000 oz
Inferrednot scored248,600,000 oz
Total resource358,130,000 oz
Far belowFar above
109.5M oz vs. 44.4M oz peer median
Compares M&I only — Inferred isn't compared or scored.
$0.894/oz
M&I
Total resource (incl. Inferred)$0.273/oz
Peer median $3.47/oz
Far aboveFar below
$0.894/oz vs. $4.95/oz peer median
Cut-off: Indicated, Polymetallic (Ag-Pb-Zn): 51 g/t AgEq; Inferred, Ag-dominant: 20 g/t Ag; Inferred, Zn-dominant: 0.90% Zn; Inferred, Sn-dominant: 0.12% Sn; Inferred, Polymetallic 1 (medium grade): 36 g/t AgEq; Inferred, Polymetallic 2 (lower grade): 11.14 g/t AgEq; overall pit-optimization cutoff: 11.14 g/t AgEq (1:1 strip ratio)
Underground (conceptual)
6.2%
0%100%
6.2% vs. 5% peer median
-$9.6M
Far belowFar above
-$9.6M vs. -$3.6M peer median
-$0.08
Far belowFar above
-$0.08 vs. -$0.022 peer median

Acquisition Susceptibility

How this is calculated
3.9/10
Unlikely bolt-onFits the takeout profile

A relative ranking of how closely this company matches the profile of juniors that have actually been acquired — not a probability, and not a reason to buy. Acquisitions are rare: only a few dozen significant deals happen a year across a universe of thousands of juniors, so even a high score here describes a long shot. The strongest signal in the research, a producer that already owns part of the company, is scored from its disclosed strategic shareholders. A producer that is a joint-venture or earn-in partner on the project, rather than a shareholder, isn't captured yet.

How this score is built

  • Disclosed pending deal
    Sub-score: Not scored

    No pending acquisition or merger disclosed (checked)

    Not scored: having no deal in flight isn't held against a company.

    Weight 26.25%
  • Producer's strategic stake
    Sub-score: Not scored

    No producer holds a disclosed stake on file (holder register researched) See holders

    Not scored: most juniors that do get bought had no prior toehold, so a missing stake says little either way.

    Weight 25%
  • Distance to a producing mine
    Sub-score: Not yet researched

    Distance not yet researched: no project coordinates on file

    Distance can't be measured without coordinates, so excluded rather than counted as far.

    Weight 22.5%
  • Lifecycle stage
    Sub-score:
    3.5/10

    Stage: Resource Definition

    Feasibility and permitting score 10, where deals cluster, and production 5.5; earlier stages score less, down to 1 at grassroots.

    Weight 15% · 57% here
  • Jurisdiction
    Sub-score:
    4/10

    Bolivia: jurisdiction score 4/10

    Our jurisdiction score, used as is: higher means lower political and permitting risk.

    Weight 6.75% · 26% here
  • Commodity
    Sub-score:
    5/10

    Primary commodity: Silver

    Gold 10, copper 8, silver 5, nickel and uranium 4, others 2: most majors' deals are for gold.

    Weight 4.5% · 17% here

Weight is each input's share of the full score. “Here” is its share of this company's score: inputs that aren't scored are left out and the rest re-weighted, never counted as zero.

Overall Score Trend
-13.8% since 2026-08-09 · -24.3% from peak

Your Rankings

Community Sentiment
—SELLINGBUYING
CategoryCommunityYour Ranking
Overall— (0) 
Management— (0) 
Financials— (0) 
Jurisdiction— (0) 
Project Quality— (0) 

Management Team

Chairman and CEO of Eloro Resources Ltd., leading the advancement of the Iska Iska silver-tin polymetallic project in southern Bolivia.

Insiders, Investors & Smart Money

Notable shareholders and insiders whose involvement is worth knowing about, plus what we're seeing from institutional/large-investor activity.

Smart money
4/10

Crescat Capital LLC, a well-known specialist resources-focused fund, is Eloro's largest shareholder at over 14%. Senior officer Christopher Holden bought stock on the open market repeatedly through 2026, though he also sold shares in January 2026.

No notable insiders tracked for this miner yet.

Reports, Presentations & Documents

Technical Report Takeaways

Eloro Resources is advancing the Iska Iska silver-tin polymetallic discovery in Potosi Department, southern Bolivia, and has completed its option payments on the property. The April 2026 updated resource has 109,530,000 oz of silver indicated (85.17 Mt at 40 g/t silver, or 78.38 g/t silver-equivalent), with no measured category, plus 248,600,000 oz inferred (945.43 Mt at 8.5 g/t silver), alongside zinc, lead and tin. In May 2026 the company began a 40,000 m, roughly 75-hole expansion drilling program aimed at better defining the higher-grade silver-tin zones, particularly in the Santa Barbara zone, ahead of a planned preliminary economic assessment. Reflecting the project's tin content, Eloro has been accepted into the U.S. Defense Industrial Base Consortium.