JUNIORMETRICS

Eldorado Gold Corporation

EGO·ELD·US$35.16 (CAD 49.44)·US$9.2B cap
Goldalso:Skouries Project, Greece (construction, nearing completion) -- also Lamaque (Quebec, Canada), Kisladag and Efemcukuru (Turkey), Olympias (Greece, producing) and the McIlvenna Bay copper-zinc mine (Saskatchewan, Canada, ramping up) Map

Eldorado Gold Corporation is a TSX/NYSE-listed (ticker EGO on NYSE) intermediate gold producer with a multi-country portfolio: Lamaque (Quebec, Canada -- the current largest producer by ounces), Kisladag and Efemcukuru (Turkey), and Olympias (Greece, undergoing a mill expansion to 650ktpa targeted for completion end of 2026). Its flagship growth project, Skouries (Greece, wholly-owned gold-copper), is in the final stages of construction: first ore was crushed on temporary power in Q2 2026, first concentrate is targeted for Q3 2026, and commercial production for Q4 2026, at a total capital cost of approximately $1.315 billion to commercial production. Q2 2026 group results: 104,616 oz gold produced, consolidated AISC of $1,926/oz, cash of $554.6M, and total debt of $1.75 billion -- peak leverage from Skouries/McIlvenna Bay project financing, not distress; debt servicing and repayment begin end of 2026 as Skouries ramps. Free cash flow was negative $334.1M in Q2 2026 (growth-capex driven) but positive $40.9M excluding growth-project spend. Confirmed not ASX-listed -- delisted 2012-08-31 (ticker EAU) due to low CDI trading volume relative to TSX/NYSE. George Burns is President & CEO, retiring effective 2026-09-30 with Christian Milau (currently a director) taking over the same date -- a planned succession timed to Skouries entering its operating phase.

Notable vs. Peers

  • Financials score of 2.9/10 is weaker than the peer average of 6.5/10.

Lifecycle Milestones

Grassroots
Resource Def.
PEA
PFS
Feasibility
Permitting
Construction
ProductionCurrent

Construction Milestones

5 of 5 reached
  1. Jan 2022 · Source
  2. Jan 2022 · Source
  3. Jun 2022 · Source
  4. Reached — date not disclosed · Source
  5. Reached — date not disclosed · Source

Milestones are recorded only from a company's own dated disclosure. A milestone with no date shown is one we can confirm was reached but for which no date was disclosed — we don't estimate one. "Not yet reached" means exactly that, not that a date is missing. An "Expected" line likewise only ever reflects the company's own guidance (e.g. a study or permit decision targeted for a stated quarter) — most not-yet-reached milestones have none, and that absence means no such guidance has been disclosed, not that one is overdue.

Prior Ownership & Infrastructure
Lamaque Complex
Existing MillTailings FacilityRoad AccessGrid Power10/10 built out
Kışladağ
Existing MillRoad AccessGrid Power8.6/10 built out

Not in place: tailings facility.

Efemçukuru
Existing MillTailings FacilityRoad AccessGrid Power10/10 built out
Olympias
Existing MillTailings FacilityRoad AccessGrid Power10/10 built out
Skouries
Existing MillRoad Access5.7/10 built out

Not in place: tailings facility, grid power.

McIlvenna Bay Mine, Saskatchewan
Existing MillTailings FacilityRoad AccessGrid Power10/10 built out

Combined view across 6 projects. Figures below are only combined where the underlying basis genuinely matches -- see the notes under each.

Combined resource
16.4M oz Au
Sum of 5 of 6 projects with a disclosed figure; others not yet researched
IRR, per project
  • 19%Skouries
  • 23%McIlvenna Bay Mine, Saskatchewan
Each project's own figure -- IRR is not additive across independent projects, so these are never combined
Mine life, per project
  • 8 yrsLamaque Complex
  • 13 yrsKışladağ
  • 8 yrsEfemçukuru
  • 16 yrsOlympias
  • 20 yrsSkouries
  • 19 yrsMcIlvenna Bay Mine, Saskatchewan
Each project's own figure -- independent mine lives are never added or averaged
Combined NPV, by discount-rate basis
$1.9B
At 5% discount rate -- Lamaque Complex + Skouries
Sum of 2 studies dated 2021-2025 on different price decks -- see each project
$497.3M
At 7% discount rate -- McIlvenna Bay Mine, Saskatchewan

Shown as separate totals, not summed together: these projects' studies used different discount rates, so a single combined NPV would not be a real number.

5.6/10
Weak track recordStrong track record
5.6/10 vs.
2.9/10
Thin runwayWell-capitalized
2.9/10 vs.
How this is calculated
5/10
Weaker depositStronger deposit
5/10 vs.
How this is calculated
9.6/10
Harder place to buildEasier place to build
9.6/10 vs.
What goes into it
  • Jurisdiction (40%)9/10

    Quebec: Fraser PPI 2025 is 79.39 of 100 (rank 23 of 68), which maps to 9 on this site's scale. Eldorado's flagship is the Lamaque complex at Val-d'Or, Quebec. Kisladag and Efemcukuru (Türkiye) and Olympias and Skouries (Greece, where Skouries has a history of construction delays and local opposition) carry different risks, which this single flagship-based score does not capture.

  • Infrastructure (40%)10/10

    A confirmed mill, confirmed road access, confirmed grid power, and a confirmed tailings facility at Lamaque Complex.

  • Nearby producing mine (20%)10/10

    Goldex (Agnico Eagle Mines Limited) is 10 km away -- within shared-mill trucking range.

5.8/10
Weaker profileStronger profile
5.8/10 vs.
Price Chart
$22.23$31.37$34.29$32.29$35.32AugDecMarJulOct2222
Aug 12, 2025 – Oct 20, 2026
News
$35.16
+47.5%from low-27.3%from high
$23.84$48.35
See who ↓
0.3%
Low alignmentHigh alignment
0.3% vs.
See who ↓
64.2%
Low alignmentHigh alignment
64.2% vs.
$9.2B
Far belowFar above
$9.2B vs. $541.4M peer median
Price (USD - Local)
US$35.16 (CAD 49.44)
Cash Position (USD)
$554.6M
Far belowFar above
$554.6M vs. $91.1M peer median
Debt (USD)
$1.8B
Far aboveFar below
$1.8B vs. $6.2M peer median
$10.4B
Far belowFar above
$10.4B vs. $457.7M peer median
260.8M
Far aboveFar below
260.8M vs. 336.8M peer median
Jurisdiction
Canada
17,382,000 oz
Feeds Deposit Quality score
Measured9,763,000 oz
Indicated7,618,000 oz
Inferrednot scored8,166,000 oz
Total resource25,548,000 oz
Far belowFar above
17.4M oz vs. 1.3M oz peer median
Compares M&I only — Inferred isn't compared or scored.
$596.34/oz
M&I
Total resource (incl. Inferred)$405.73/oz
Peer median $67.95/oz
Far aboveFar below
$596.34/oz vs. $133.79/oz peer median
0.0303 oz/t
Far belowFar above
0.0303 oz/t vs. 0.0383 oz/t peer median
Open pit, underground, and heap leach
See projects ↓
$1,926/oz
See projects ↓
See projects ↓
See projects ↓
See projects ↓
0.3%
0%100%
0.3% vs. 12.1% peer median
64.2%
0%100%
64.2% vs. 3.3% peer median
10 kmfrom Agnico Eagle Mines Limited's Goldex
Within shared-mill range (~20km)
-$334.1M
Far belowFar above
-$334.1M vs. $52.7M peer median
-$1.281
Far belowFar above
-$1.281 vs. $0.164 peer median
-$311.8M
Far belowFar above
-$311.8M vs. $592.2M peer median
-$1.196
Far belowFar above
-$1.196 vs. $2.11 peer median

Acquisition Susceptibility

How this is calculated
8/10
Unlikely bolt-onFits the takeout profile

A relative ranking of how closely this company matches the profile of juniors that have actually been acquired — not a probability, and not a reason to buy. Acquisitions are rare: only a few dozen significant deals happen a year across a universe of thousands of juniors, so even a high score here describes a long shot. The strongest signal in the research, a producer that already owns part of the company, is scored from its disclosed strategic shareholders. A producer that is a joint-venture or earn-in partner on the project, rather than a shareholder, isn't captured yet.

How this score is built

  • Disclosed pending deal
    Sub-score: Not scored

    No pending acquisition or merger disclosed (checked)

    Not scored: having no deal in flight isn't held against a company.

    Weight 26.25%
  • Producer's strategic stake
    Sub-score: Not yet researched

    Holder register not researched yet

    Not scored: most juniors that do get bought had no prior toehold, so a missing stake says little either way.

    Weight 25%
  • Distance to a producing mine
    Sub-score:
    9/10

    Nearest producing mine: Goldex (Agnico Eagle Mines Limited), 10 km

    10 next to a producing mine, 8 at 20 km, 5 at 50 km, 0 beyond 200 km.

    Weight 22.5% · 46% here
  • Lifecycle stage
    Sub-score:
    5.5/10

    Stage: Production

    Feasibility and permitting score 10, where deals cluster, and production 5.5; earlier stages score less, down to 1 at grassroots.

    Weight 15% · 31% here
  • Jurisdiction
    Sub-score:
    9/10

    Canada: jurisdiction score 9/10

    Our jurisdiction score, used as is: higher means lower political and permitting risk.

    Weight 6.75% · 14% here
  • Commodity
    Sub-score:
    10/10

    Primary commodity: Gold

    Gold 10, copper 8, silver 5, nickel and uranium 4, others 2: most majors' deals are for gold.

    Weight 4.5% · 9% here

Weight is each input's share of the full score. “Here” is its share of this company's score: inputs that aren't scored are left out and the rest re-weighted, never counted as zero.

Overall Score Trend
+20.8% since 2026-08-08 · -19.4% from peak

Your Rankings

Community Sentiment
—SELLINGBUYING
CategoryCommunityYour Ranking
Overall— (0) 
Management— (0) 
Financials— (0) 
Jurisdiction— (0) 
Project Quality— (0) 

Management Team

President and Chief Executive Officer of Eldorado Gold Corporation since Apr 2017 (joined Feb 2017), retiring effective 30 Sep 2026 and remaining on the Board of Directors thereafter -- Christian Milau (currently a director) is set to succeed him as President and CEO. Began his career at Anaconda Company in 1978; held various roles at Asarco LLC (including VP of Mining) and numerous roles at Cyprus Minerals Corporation (no specific dates confirmed for these three early-career employers).

Joined Eldorado in May 2021 as SVP, Chief Growth and Integration Officer, then EVP, Chief Strategy & Commercial Officer, before his CFO appointment. Before Eldorado, spent nearly two decades with Talisman Energy Inc. and its successor Repsol SA (Repsol acquired Talisman in 2015), most recently as Executive Director leading Repsol's North American upstream oil and gas division. Chartered Accountant, Institute of Chartered Accountants of England and Wales.

Insiders, Investors & Smart Money

Notable shareholders and insiders whose involvement is worth knowing about, plus what we're seeing from institutional/large-investor activity.

Smart money

Not scored. Smart-money tracking covers companies below about US$5B in market cap, where a single specialist fund or strategic investor taking a stake is a meaningful signal. This company was above that size when it was assessed.

No notable insiders tracked for this miner yet.

Reports, Presentations & Documents

Technical Report Takeaways

Eldorado Gold operates Lamaque in Quebec, Kisladag and Efemcukuru in Turkey and Olympias in Greece, and is completing construction of the wholly owned Skouries gold-copper project in Greece. Skouries' December 2021 feasibility study showed an NPV (5%) of US$1.3B and a 19% IRR at US$1,500/oz gold and US$3.85/lb copper over a 20-year mine life; that is a single-project figure, not a company-wide one.

Recent News

Critical Raw MaterialsEarningsGoldMiningQ2 2026
Fourth QuarterGoldInflationMiningProject DevelopmentShare PriceShareholderUndervalued
Fourth QuarterGoldInvestment NarrativeMiningRevenue Growth
Autonomous SystemsDefenseGovernment ContractsIndustrialInitial Public OfferingPhysical Ai
Commercial ProductionCopperFourth QuarterGoldMiningRatings
Cash FlowEarningsFree Cash FlowGoldIntrinsic ValuePrice TargetShare PriceSplit
CopperFourth QuarterFree Cash FlowGoldMiningPrice TargetPrice TargetUpgrade Downgrade