JUNIORMETRICS
Gold$4,479.95/oz
Silver$66.98/oz
Copper$6.00/lb

Eldorado Gold Corporation

EGO·ELD·$43.67·$9.8B cap
Goldalso:Skouries Project, Greece (construction, nearing completion) -- also Lamaque (Quebec, Canada), Kisladag and Efemcukuru (Turkey), and Olympias (Greece, producing) Map

Eldorado Gold Corporation is a TSX/NYSE-listed (ticker EGO on NYSE) intermediate gold producer with a genuinely multi-country portfolio: Lamaque (Quebec, Canada -- the current largest producer by ounces), Kisladag and Efemcukuru (Turkey), and Olympias (Greece, undergoing a mill expansion to 650ktpa targeted for completion end of 2026). Its flagship growth project, Skouries (Greece, wholly-owned gold-copper), is in the final stages of construction: first ore was crushed on temporary power in Q2 2026, first concentrate is targeted for Q3 2026, and commercial production for Q4 2026, at a total capital cost of approximately $1.315 billion to commercial production. Skouries' December 2021 Feasibility Study disclosed an after-tax NPV of $1.3 billion (5% discount rate) and 19% IRR at $1,500/oz gold and $3.85/lb copper long-term price assumptions (a study now several years old; capex has since risen from the original FS estimate, and no updated NPV has been published as of this pass). Q2 2026 group results: 104,616 oz gold produced, consolidated AISC of $1,926/oz, cash of $554.6M, and total debt of $1.75 billion -- peak leverage from Skouries/McIlvenna Bay project financing, not distress; debt servicing and repayment begin end of 2026 as Skouries ramps. Free cash flow was negative $334.1M in Q2 2026 (growth-capex driven) but positive $40.9M excluding growth-project spend. Confirmed NOT ASX-listed -- delisted 2012-08-31 (ticker EAU) due to low CDI trading volume relative to TSX/NYSE. George Burns is President & CEO, retiring effective 2026-09-30 with Christian Milau (currently a director) taking over the same date -- a planned succession timed to Skouries entering its operating phase.

Notable vs. Peers

  • Financials score of 3.1/10 is weaker than the peer average of 6.4/10.

Lifecycle Milestones

Grassroots
Resource Def.
PEA
PFS
Feasibility
Permitting
Construction
ProductionCurrent

Construction Milestones

5 of 5 reached
  1. Jan 2022 · Anchored to Skouries securing its EUR680M project financing and board construction approval in 2022, which presupposes the underlying environmental/mining permits (a long, contested Greek permitting history for this specific project). Not a company-wide date across the older Lamaque/Kisladag/Efemcukuru/Olympias operations, each permitted separately over decades. · Source
  2. Jan 2022 · Skouries board construction approval and EUR680M project financing announced 2022, per Eldorado's own release. · Source
  3. Jun 2022 · Approximate -- Skouries construction ramped through 2022 following the financing/approval above. Lamaque/Kisladag/Efemcukuru/Olympias have each been in continuous production for years; this row reflects Skouries specifically, the live construction-stage project. · Source
  4. Reached — date not disclosed · Approximate -- Lamaque (Eldorado's current largest producer) has been in continuous production since 2019-2020; current company-wide production status is directly evidenced by Q2 2026 group output of 104,616 oz across Lamaque, Kisladag, Efemcukuru, and Olympias. Skouries' own first production is still pending (targeted Q3-Q4 2026) and is deliberately not asserted here. [Task #697 chronology ruling, 2026-08-25] achievedDate cleared (was 2020-01-01). This single row was responsible for THREE of Task #696's flagged inversions on this ticker (PERMIT_GRANTED, CONSTRUCTION_DECISION and CONSTRUCTION_START all appearing to postdate first production). It was never a real assertion: the note above calls it "Approximate" and describes a RANGE ("continuous production since 2019-2020") rounded to 1 January, for the Lamaque mine -- whereas the three rows it contradicts are all SKOURIES, a different project whose own first production the note explicitly and correctly declines to assert ("still pending, targeted Q3-Q4 2026"). So the row was comparing a rounded portfolio-wide approximation against three precise single-project dates. This miner's COMMERCIAL_PRODUCTION row already handles exactly this with achievedDate=null and a "no single company-wide commercial-production date exists across a multi-mine portfolio" hedge; this row now matches it. All Lamaque/Kisladag/Efemcukuru research above is preserved, as is the Q2 2026 production evidence, and the lifecycle gate reading this row is unaffected (hasMilestone() keys on disputed). · Source
  5. Reached — date not disclosed · Genuinely reached, but no single company-wide commercial-production date exists across a multi-mine portfolio (Lamaque in Quebec, Kisladag and Efemcukuru in Turkiye) built over decades, with the new Skouries copper-gold project (Greece) on track for first production Q3 2026 (not yet part of this claim). Q2 2026 results (released 2026-07-30) reported 104,616 oz gold produced across the three existing mines (Lamaque 52,340 oz, Kisladag 19,108 oz, Efemcukuru 18,019 oz). This row was missing entirely prior to 2026-08-21 -- a genuine data gap, not a stage error; Miner.stage was already correctly PRODUCTION. · Source

Milestones are recorded only from a company's own dated disclosure. A milestone with no date shown is one we can confirm was reached but for which no date was disclosed — we don't estimate one. "Not yet reached" means exactly that, not that a date is missing. An "Expected" line likewise only ever reflects the company's own guidance (e.g. a study or permit decision targeted for a stated quarter) — most not-yet-reached milestones have none, and that absence means no such guidance has been disclosed, not that one is overdue.

Combined view across 5 projects. Figures below are only combined where the underlying basis genuinely matches -- see the notes under each.

Combined resource
7.9M oz
Sum of 4 of 5 projects with a disclosed figure (others not yet researched)
IRR
Not combined
IRR is not additive across independent projects -- see each project's own tab for its figure
Combined NPV, by discount-rate basis
$555M
At rate not disclosed discount rate -- Lamaque Complex
$1.3B
At 5% discount rate -- Skouries

Shown as separate totals, not summed together: these projects' studies used different discount rates, so a single combined NPV would not be a real number.

10/10
Weak track recordStrong track record
3.1/10
Thin runwayWell-capitalized
8/10
High riskLow risk
How this is calculated
7.5/10
Weaker depositStronger deposit
7.2/10
Weaker profileStronger profile
Price Chart
$22.23$28.04$44.74$31.90$43.67AugNovFebJunSep2
Aug 12, 2025Sep 4, 2026
News
$43.67
+105.7%from low-12%from high
$21.23$49.64
See who ↓
0.3%
Low alignmentHigh alignment
See who ↓
64.2%
Low alignmentHigh alignment
$9.8B
Far belowFar above
$557.1M median
Price (USD - Local)
$43.67 - CAD 60.44
Cash Position (USD)
$554.6M
Far belowFar above
$90.6M median
Debt (USD)
$1.8B
Far aboveFar below
$5.7M median
$11B
Far belowFar above
$486M median
260.8M
Far aboveFar below
305.4M median
Jurisdiction
Canada
17,400,000 oz
Far belowFar above
1.3M median
$633.70/oz
Far aboveFar below
$157.18/oz median
This company's data hasn't been researched yet
Open pit, underground, and heap leach
See projects ↓
This company's data hasn't been researched yet
$1,926/oz
See projects ↓
This company's data hasn't been researched yet
See projects ↓
Not enough peer data yet
This company's data hasn't been researched yet
Not enough peer data yet
See projects ↓
This company's data hasn't been researched yet
0.3%
0%100%
19.3% median
64.2%
0%100%
3% median
1860 kmfrom Anglo Asian Mining plc's Gedabek
Outside typical bolt-on range
-$334.1M
Far belowFar above
$44.1M median
-$1.281
Far belowFar above
$0.152 median
This company's data hasn't been researched yet
-$311.8M
Far belowFar above
$524.2M median
-$1.196
Far belowFar above
$2.11 median
Acquisition Susceptibility
3.7/10
Unlikely bolt-onFits the takeout profile

A relative ranking of how closely this company matches the profile of juniors that have actually been acquired — not a probability, and not a reason to buy. Acquisitions are rare: only a few dozen significant deals happen a year across a universe of thousands of juniors, so even a high score here describes a long shot. The strongest signal the underlying research identifies — whether a major already holds a JV, earn-in, or 5–19.9% strategic stake — isn't tracked yet and is absent from this score.

Overall Score Trend
+50% since 2026-08-08

Your Rankings

Community Sentiment
SELLINGBUYING
CategoryCommunityYour Ranking
Overall (0)Log in to rank
Management (0)Log in to rank
Financials (0)Log in to rank
Jurisdiction (0)Log in to rank
Project Quality (0)Log in to rank

Management Team

President and Chief Executive Officer of Eldorado Gold Corporation since Apr 2017 (joined Feb 2017), retiring effective 30 Sep 2026 and remaining on the Board of Directors thereafter -- Christian Milau (currently a director) is set to succeed him as President and CEO. Began his career at Anaconda Company in 1978; held various roles at Asarco LLC (including VP of Mining) and numerous roles at Cyprus Minerals Corporation (no specific dates confirmed for these three early-career employers). Immediately before Eldorado: COO of Centerra Gold Inc. (already tracked in this DB, CG, 2003-2007); Senior VP Canada/US Operations then EVP & COO of Goldcorp Inc. (2007-2017).

Executive Vice President and Chief Financial Officer of Eldorado Gold Corporation since 2 Jan 2024 (expanding to EVP, Strategy and CFO effective 30 Sep 2026, assuming oversight of Corporate Development and Legal) -- missing from this DB entirely before this batch (only the CEO was tracked). Joined Eldorado in May 2021 as SVP, Chief Growth and Integration Officer, then EVP, Chief Strategy & Commercial Officer, before his CFO appointment. Before Eldorado, spent nearly two decades with Talisman Energy Inc. and its successor Repsol SA (Repsol acquired Talisman in 2015), most recently as Executive Director leading Repsol's North American upstream oil and gas division. Chartered Accountant, Institute of Chartered Accountants of England and Wales.

Insiders, Investors & Smart Money

Notable shareholders and insiders whose involvement is worth knowing about, plus what we're seeing from institutional/large-investor activity.

Smart money

Task #172 gate batch: smartMoneyScore rubric (playbook §7.6) applied 2026-08-15 -- GATED: marketCapUsd $9.83B >= $5.0B applicability threshold. At this size, index membership (GDX, S&P/TSX 60, Russell 1000) mechanically dominates the shareholder register, so absence of a visible specialist bet carries no information. RESEARCHED_UNKNOWN per playbook §6.4/§7.6.

No notable insiders tracked for this miner yet.

Reports, Presentations & Documents

Technical Report Takeaways

Eldorado Gold Corporation is a TSX/NYSE-listed (ticker EGO on NYSE) intermediate gold producer with a genuinely multi-country portfolio: Lamaque (Quebec), Kisladag and Efemcukuru (Turkey), Olympias (Greece), and Skouries (Greece, wholly-owned gold-copper, in construction). Per the Task #347 multi-project convention, company-level dcfNpvUsd/irrPct/mineLifeYears/ouncesFound are deliberately left null rather than represented by one asset's figures -- Eldorado is a genuine 5-mine producer with no single consolidated corporate-level DCF. [Task #868] The description's "NPV of $1.3 billion" / "19% IRR" figures are Skouries' own Dec 2021 Feasibility Study economics (5% discount rate, $1,500/oz gold / $3.85/lb copper long-term price assumptions, 20-year mine life) -- already fully researched, cited (globenewswire.com/.../Eldorado-Gold-Announces-Results-of-Skouries-Project-Feasibility-Study...) and stored on the Skouries Project row (dcfNpvUsd, dcfNpvDiscountRatePct, irrPct, mineLifeYears all populated there with ProjectMetricSource citations), independently re-verified live 2026-09-01 against Eldorado's own press release. Writing Skouries' study economics into this Miner-level field would misrepresent them as a company-wide figure across 4 other producing mines Skouries' study says nothing about -- the correct fix is the Project row that already exists, not this field.