JUNIORMETRICS

Elevate Uranium Limited

ELVUF·EL8·US$0.14 (AUD 0.20)·US$64.4M cap
UraniumKoppies Project, Namibia Map

Elevate Uranium's flagship Koppies project in Namibia carries a 76.2Mlb U3O8 resource (55.9Mlb plus additional; 43.6Mlb, or 78%, in the JORC Indicated category); the company is the largest uranium tenement holder in Namibia and is testing its proprietary U-pgrade beneficiation process in a pilot plant in Namibia, with results for the first four of five stages reported in August 2026. Its next planned study is a Marenica scoping study, and no economic study has been published for Koppies. Cash of A$36.65 million (reflecting a 2026 raise) against immaterial debt of A$390,561.

Notable vs. Peers

  • Financials score of 8/10 is stronger than the peer average of 5.7/10.
  • Trading within 3% of its 52-week low — weak recent price momentum.

Lifecycle Milestones

Grassroots
Resource Def.Current
PEA
PFS
Feasibility
Permitting
Construction
Production
Prior Ownership & Infrastructure
Road Access1 of 4 checked, 1 in place

Not yet determined: mill, tailings facility, grid power.

Not yet researched
Weak track recordStrong track record
8/10
Thin runwayWell-capitalized
8/10 vs.
How this is calculated
4.9/10
Weaker depositStronger deposit
4.9/10 vs.
How this is calculated
6.8/10
Harder place to buildEasier place to build
6.8/10 vs.
What goes into it
  • Jurisdiction (40%)8/10

    Namibia is one of Africa's most established uranium jurisdictions, already home to two large operating mines (Rössing, Husab), with a stable, mining-friendly regulatory framework.

  • Infrastructure (40%)6.4/10

    Confirmed road access at Koppies Project, Namibia; existing mill, grid power, and tailings facility not yet researched, counted at a neutral 5/10 until established.

  • Nearby producing mine (20%)Not yet researched

    No producing mine within 50 km in our reference list (nearest listed: Langer Heinrich (Paladin Energy Ltd / CNNC Overseas Uranium Holding Ltd), 109 km). That list doesn't cover every mining district yet, so a longer distance isn't scored as remote.

6.2/10
Weaker profileStronger profile
6.2/10 vs.
Price Chart
$0.166$0.191$0.212$0.162$0.14AugDecMarJulOct
Aug 12, 2025 – Oct 20, 2026
Stage changeNews
$0.14
+4.6%from low-59.9%from high
$0.13$0.34
See who ↓
14.7%
Low alignmentHigh alignment
14.7% vs.
See who ↓
41%
Low alignmentHigh alignment
41% vs.
$64.4M
Far belowFar above
$64.4M vs. $16.1M peer median
Price (USD - Local)
US$0.14 (AUD 0.20)
Cash Position (USD)
$19.9M
Far belowFar above
$19.9M vs. $6.4M peer median
Debt (USD)
Far aboveFar below
$0 vs. $0 peer median
$44.5M
Far belowFar above
$44.5M vs. $12.9M peer median
466M
Far aboveFar below
466M vs. 138.4M peer median
Jurisdiction
Namibia
43,600,000 lb U₃O₈
Feeds Deposit Quality score
Indicated43,600,000 lb U₃O₈
Inferrednot scored12,300,000 lb U₃O₈
Total resource55,900,000 lb U₃O₈
Far belowFar above
43.6M lb vs. 40M lb peer median
Compares M&I only — Inferred isn't compared or scored.
$1.02/lb
M&I
Total resource (incl. Inferred)$0.795/lb
Peer median $2.91/lb
Far aboveFar below
$1.02/lb vs. $4.02/lb peer median
Cut-off: Koppies Project: 100 ppm eU3O8
14.7%
0%100%
14.7% vs. 2.9% peer median
41%
0%100%
41% vs. 10% peer median
109 kmfrom Paladin Energy Ltd (75%) / CNNC Overseas Uranium Holding Ltd (25%)'s Langer Heinrich
Outside typical bolt-on range
-$9.2M
Far belowFar above
-$9.2M vs. -$5.4M peer median
-$0.02
Far belowFar above
-$0.02 vs. -$0.024 peer median

Acquisition Susceptibility

How this is calculated
4/10
Unlikely bolt-onFits the takeout profile

A relative ranking of how closely this company matches the profile of juniors that have actually been acquired — not a probability, and not a reason to buy. Acquisitions are rare: only a few dozen significant deals happen a year across a universe of thousands of juniors, so even a high score here describes a long shot. The strongest signal in the research, a producer that already owns part of the company, is scored from its disclosed strategic shareholders. A producer that is a joint-venture or earn-in partner on the project, rather than a shareholder, isn't captured yet.

How this score is built

  • Disclosed pending deal
    Sub-score: Not scored

    No pending acquisition or merger disclosed (checked)

    Not scored: having no deal in flight isn't held against a company.

    Weight 26.25%
  • Producer's strategic stake
    Sub-score: Not scored

    No producer holds a disclosed stake on file (holder register researched) See holders

    Not scored: most juniors that do get bought had no prior toehold, so a missing stake says little either way.

    Weight 25%
  • Distance to a producing mine
    Sub-score:
    3/10

    Nearest producing mine: Langer Heinrich (Paladin Energy Ltd / CNNC Overseas Uranium Holding Ltd), 109 km

    10 next to a producing mine, 8 at 20 km, 5 at 50 km, 0 beyond 200 km.

    Weight 22.5% · 46% here
  • Lifecycle stage
    Sub-score:
    3.5/10

    Stage: Resource Definition

    Feasibility and permitting score 10, where deals cluster, and production 5.5; earlier stages score less, down to 1 at grassroots.

    Weight 15% · 31% here
  • Jurisdiction
    Sub-score:
    8/10

    Namibia: jurisdiction score 8/10

    Our jurisdiction score, used as is: higher means lower political and permitting risk.

    Weight 6.75% · 14% here
  • Commodity
    Sub-score:
    4/10

    Primary commodity: Uranium

    Gold 10, copper 8, silver 5, nickel and uranium 4, others 2: most majors' deals are for gold.

    Weight 4.5% · 9% here

Weight is each input's share of the full score. “Here” is its share of this company's score: inputs that aren't scored are left out and the rest re-weighted, never counted as zero.

Overall Score Trend
-31.1% since 2026-08-04 · -31.1% from peak

Your Rankings

Community Sentiment
—SELLINGBUYING
CategoryCommunityYour Ranking
Overall— (0) 
Management— (0) 
Financials— (0) 
Jurisdiction— (0) 
Project Quality— (0) 

Management Team

Managing Director and Chief Executive Officer of Elevate Uranium Limited, appointed Chief Executive Officer on 1 May 2012 and Managing Director on 2 May 2016. (BSc (Metallurgy), FAusIMM) 41 years' experience in the mining industry and a respected metallurgist with extensive experience in the design, operation and commissioning of gold, uranium and base metal process plants, broadened by management of a metallurgical testwork laboratory and a role as process engineer in an engineering group. For the 10 years prior to joining the company he operated his own business providing metallurgical consulting services to the mining industry worldwide.

Chief Financial Officer of Elevate Uranium Limited since 1 May 2017 and Company Secretary since 8 June 2017. (BBus (Acct), FCPA, FGIA, FCG, MAICD) 43 years of commercial management experience gained in listed Australian public companies, spanning corporate management, project development, mine site operations management, management and financial accounting, corporate finance, investor relations and company secretarial functions. Has been closely involved with exploration, development, scoping and pre-feasibility studies and financing activities, and was managing director of an ASX-listed mining company that acquired and operated an SX/EW copper cathode production facility in Queensland.

Insiders, Investors & Smart Money

Notable shareholders and insiders whose involvement is worth knowing about, plus what we're seeing from institutional/large-investor activity.

Smart money
3/10

Paradice Investment Management holds just under 10% of Elevate Uranium, and several insiders -- led by Non-Executive Chairman Scott Perry -- bought shares on the open market over the past year with no offsetting selling found.

No notable insiders tracked for this miner yet.

Reports, Presentations & Documents

Technical Report Takeaways

Elevate Uranium is the largest uranium tenement holder in Namibia, and its flagship Koppies project forms part of a 76.2 Mlb U3O8 district resource. The main Koppies deposit has 43,600,000 lb of U3O8 indicated, 78% of its 55.9 Mlb total, plus 12,300,000 lb inferred, while the Hirabeb and Namib IV deposits are entirely inferred and the separate Marenica project holds 40.2 Mlb. The company is testing its proprietary U-pgrade beneficiation process in a pilot plant in Namibia on Marenica ore, with results for the first four of five stages reported on 31 August 2026 and Koppies ore to follow. Its next planned study is a scoping study for Marenica, and no economic study has been published for Koppies.