JUNIORMETRICS
Gold$4,479.95/oz
Silver$66.98/oz
Copper$6.00/lb

Elevate Uranium Limited

EL8·$0.19·$73.6M cap
UraniumKoppies Project, Namibia Map

Elevate Uranium's flagship Koppies project in Namibia carries a 76.2Mlb U3O8 resource (55.9Mlb + additional, 43.6Mlb / 78% in JORC Indicated category); the company is the largest uranium tenement holder in Namibia and is running its proprietary U-pgrade beneficiation process through pilot-plant testing (results expected Aug 2026) ahead of a Koppies scoping study, seeded here as PEA-stage. Cash of A$36.65 million (reflecting a 2026 raise) against immaterial debt of A$390,561.

Notable vs. Peers

  • Financials score of 10/10 is stronger than the peer average of 7.5/10.

Lifecycle Milestones

Grassroots
Resource Def.
PEACurrent
PFS
Feasibility
Permitting
Construction
Production
Weak track recordStrong track record
10/10
Thin runwayWell-capitalized
8/10
High riskLow risk
How this is calculated
6.1/10
Weaker depositStronger deposit
8/10
Weaker profileStronger profile
Price Chart
$0.166$0.191$0.265$0.198$0.195AugNovFebJunSep
Aug 12, 2025Sep 4, 2026
News
$0.19
+28.7%from low-45.4%from high
$0.15$0.36
See who ↓
14.7%
Low alignmentHigh alignment
See who ↓
41%
Low alignmentHigh alignment
$73.6M
Far belowFar above
$29.8M median
Price (USD - Local)
$0.19 - AUD 0.27
Cash Position (USD)
$25.7M
Far belowFar above
$8.2M median
Debt (USD)
$274K
Far aboveFar below
$0 median
$48.1M
Far belowFar above
$21.7M median
466M
Far aboveFar below
199.4M median
Jurisdiction
Namibia
43,600,000 lb U₃O₈
Far belowFar above
33.8M median
$1.10/lb
Far aboveFar below
$3.45/lb median
Cut-off: Koppies Project: 100 ppm eU3O8 (Marenica cutoff not independently confirmed, not written)
This company's data hasn't been researched yet
This company's data hasn't been researched yet
This company's data hasn't been researched yet
Not enough peer data yet
This company's data hasn't been researched yet
Not enough peer data yet
This company's data hasn't been researched yet
14.7%
0%100%
3.3% median
41%
0%100%
10% median
1805 kmfrom CMOC Group Limited's Tenke Fungurume
Outside typical bolt-on range
This company's data hasn't been researched yet
This company's data hasn't been researched yet
This company's data hasn't been researched yet
This company's data hasn't been researched yet
This company's data hasn't been researched yet
Acquisition Susceptibility
3.3/10
Unlikely bolt-onFits the takeout profile

A relative ranking of how closely this company matches the profile of juniors that have actually been acquired — not a probability, and not a reason to buy. Acquisitions are rare: only a few dozen significant deals happen a year across a universe of thousands of juniors, so even a high score here describes a long shot. The strongest signal the underlying research identifies — whether a major already holds a JV, earn-in, or 5–19.9% strategic stake — isn't tracked yet and is absent from this score.

Overall Score Trend
-11.1% since 2026-08-04 · -11.1% from peak

Your Rankings

Community Sentiment
SELLINGBUYING
CategoryCommunityYour Ranking
Overall (0)Log in to rank
Management (0)Log in to rank
Financials (0)Log in to rank
Jurisdiction (0)Log in to rank
Project Quality (0)Log in to rank

Management Team

Managing Director and Chief Executive Officer of Elevate Uranium Limited, appointed Chief Executive Officer on 1 May 2012 and Managing Director on 2 May 2016. (BSc (Metallurgy), FAusIMM) 41 years' experience in the mining industry and a respected metallurgist with extensive experience in the design, operation and commissioning of gold, uranium and base metal process plants, broadened by management of a metallurgical testwork laboratory and a role as process engineer in an engineering group. For the 10 years prior to joining the company he operated his own business providing metallurgical consulting services to the mining industry worldwide.

Chief Financial Officer of Elevate Uranium Limited since 1 May 2017 and Company Secretary since 8 June 2017. (BBus (Acct), FCPA, FGIA, FCG, MAICD) 43 years of commercial management experience gained in listed Australian public companies, spanning corporate management, project development, mine site operations management, management and financial accounting, corporate finance, investor relations and company secretarial functions. Has been closely involved with exploration, development, scoping and pre-feasibility studies and financing activities, and was managing director of an ASX-listed mining company that acquired and operated an SX/EW copper cathode production facility in Queensland.

Insiders, Investors & Smart Money

Notable shareholders and insiders whose involvement is worth knowing about, plus what we're seeing from institutional/large-investor activity.

Smart money
3/10

Paradice Investment Management holds just under 10% of Elevate Uranium, and several insiders -- led by Non-Executive Chairman Scott Perry -- bought shares on the open market over the past year with no offsetting selling found.

No notable insiders tracked for this miner yet.

Reports, Presentations & Documents

Technical Report Takeaways

Marenica Project (separate deposit, same company) has a disclosed resource grade/tonnage (40.2Mlb U3O8 @ 185ppm average, Indicated alone 15.2Mt @ 200ppm, March 2026 quarter) but the specific cutoff grade used for Marenica's own MRE was NOT independently located/confirmed this pass -- genuine gap, not written. [Task #529 update, Aug 2026]: ouncesFound now written as 43,600,000 lb U3O8 -- the main Koppies deposit's Indicated component (43.6 Mlb of its 55.9 Mlb total, 78%), per Elevate's 15 Apr 2026 Namib IV release already referenced above. The remaining 76.2 Mlb district total (main Koppies' own 12.3 Mlb Inferred slice, plus Hirabeb's 10.2 Mlb and Namib IV's 10.1 Mlb, both entirely Inferred) is excluded per Measured+Indicated-only convention -- Marenica's disclosed 40.2 Mlb (separate deposit, same company) is likewise excluded, having no confirmed Measured/Indicated split this pass (see this note's existing Marenica caveat above).