JUNIORMETRICS

Empire Metals Limited

EEE·US$0.43 (GBP 0.32)·US$318.4M cap
OtherPitfield Titanium Project, Western Australia Map

Empire Metals Limited is advancing the Pitfield project in Western Australia's wheatbelt (~160km south of Geraldton), originally acquired in Apr 2022 as a copper-gold (IOCG-style) target from Century Minerals but which drilling in 2023 revealed to host one of the world's largest known titanium (TiO2) deposits instead. Its JORC Mineral Resource Estimate, upgraded with an effective date of 19 August 2026, stands at 8.16 billion tonnes at 4.3% TiO2 for 349 Mt of contained TiO2 (21.6 Mt Measured and 154.7 Mt Indicated) across the Thomas and Cosgrove deposits on a 100% basis; Empire holds 70% of Pitfield in a joint venture with Century Minerals. Metallurgical test work has produced titanium dioxide pigment of 99.25% purity with minimal contaminants. Bulk metallurgical testing, mining studies and continuous piloting were planned through 2026 to support a Scoping Study. The company raised £7 million via a share placing to fund this work; cash stood at £8.4 million as at 20 Mar 2026. Shaun Bunn is Managing Director; Greg Kuenzel is Finance Director.

Lifecycle Milestones

Grassroots
Resource Def.Current
PEA
PFS
Feasibility
Permitting
Construction
Production
Prior Ownership & Infrastructure
Road Access1 of 4 checked, 1 in place

Not yet determined: mill, tailings facility, grid power.

4.7/10
Weak track recordStrong track record
4.7/10 vs.
4.8/10
Thin runwayWell-capitalized
4.8/10 vs.
How this is calculated
Not scored (no size scale for titanium)
176,294,000 t TiO₂ on file
Weaker depositStronger deposit
How this is calculated
7.2/10
Harder place to buildEasier place to build
7.2/10 vs.
What goes into it
  • Jurisdiction (40%)9/10

    Western Australia: Fraser PPI 2025 is 88.53 of 100 (rank 13 of 68), which maps to 9 on this site's scale. Western Australia -- Tier-1 mining jurisdiction.

  • Infrastructure (40%)6.4/10

    Confirmed road access at Pitfield Titanium Project, Western Australia; existing mill, grid power, and tailings facility not yet researched, counted at a neutral 5/10 until established.

  • Nearby producing mine (20%)Not yet researched

    No producing mine within 50 km in our reference list (nearest listed: Deflector (Vault Minerals Limited), 118 km). That list doesn't cover every mining district yet, so a longer distance isn't scored as remote.

5.4/10
Weaker profileStronger profile
5.4/10 vs.
Price Chart
$0.398$0.506$0.405$0.533$0.419AugDecMarJulOct2
Aug 12, 2025 – Oct 20, 2026
News
$0.43
+26.2%from low-60.5%from high
$0.34$1.08
See who ↓
1.3%
Low alignmentHigh alignment
1.3% vs.
See who ↓
2.9%
Low alignmentHigh alignment
2.9% vs.
$318.4M
Far belowFar above
$318.4M vs. $15.6M peer median
Price (USD - Local)
US$0.43 (GBP 0.32)
Cash Position (USD)
$16.4M
Far belowFar above
$16.4M vs. $1.7M peer median
Debt (USD)
Far aboveFar below
$0 vs. $0 peer median
$302M
Far belowFar above
$302M vs. $12.5M peer median
743.8M
Far aboveFar below
743.8M vs. 232M peer median
Jurisdiction
Australia
176,294,000 t TiO₂
Feeds Deposit Quality score
Measured21,640,000 t TiO₂
Indicated154,654,000 t TiO₂
Inferrednot scored172,950,000 t TiO₂
Total resource349,244,000 t TiO₂
Not enough peer companies report this metric
Compares M&I only — Inferred isn't compared or scored.
$1.71/t
M&I
Total resource (incl. Inferred)$0.865/t
Not enough peer companies report this metric
Cut-off: 2.5% TiO2 cut-off, applied within a Reasonable Prospects for Eventual Economic Extraction (RPEEE) pit-shell constraint (optimisation studies indicated a break-even cut-off of 2.36% TiO2). JORC (2012) estimate effective 19 August 2026 (100% basis), Thomas and Cosgrove deposits: Measured 374 Mt at 5.8% TiO2, Indicated 3,585 Mt at 4.3% and Inferred 4,200 Mt at 4.1%, in total 8,159 Mt at 4.3% for 349 Mt of contained TiO2. Signed off under the JORC Code (2012) by Andrew Faragher (MAusIMM), Empire's Exploration Manager.
Resource-definition stage, no active mine
All-In Sustaining Cost
1.3%
0%100%
1.3% vs. 19.8% peer median
2.9%
0%100%
2.9% vs. 0% peer median
118 kmfrom Vault Minerals Limited's Deflector
Outside typical bolt-on range
-$12.9M
Far belowFar above
-$12.9M vs. -$2.9M peer median
-$0.017
Far belowFar above
-$0.017 vs. -$0.011 peer median

Acquisition Susceptibility

How this is calculated
3.8/10
Unlikely bolt-onFits the takeout profile

A relative ranking of how closely this company matches the profile of juniors that have actually been acquired — not a probability, and not a reason to buy. Acquisitions are rare: only a few dozen significant deals happen a year across a universe of thousands of juniors, so even a high score here describes a long shot. The strongest signal in the research, a producer that already owns part of the company, is scored from its disclosed strategic shareholders. A producer that is a joint-venture or earn-in partner on the project, rather than a shareholder, isn't captured yet.

How this score is built

  • Disclosed pending deal
    Sub-score: Not scored

    No pending acquisition or merger disclosed (checked)

    Not scored: having no deal in flight isn't held against a company.

    Weight 26.25%
  • Producer's strategic stake
    Sub-score: Not scored

    No producer holds a disclosed stake on file (holder register researched) See holders

    Not scored: most juniors that do get bought had no prior toehold, so a missing stake says little either way.

    Weight 25%
  • Distance to a producing mine
    Sub-score:
    2.7/10

    Nearest producing mine: Deflector (Vault Minerals Limited), 118 km

    10 next to a producing mine, 8 at 20 km, 5 at 50 km, 0 beyond 200 km.

    Weight 22.5% · 46% here
  • Lifecycle stage
    Sub-score:
    3.5/10

    Stage: Resource Definition

    Feasibility and permitting score 10, where deals cluster, and production 5.5; earlier stages score less, down to 1 at grassroots.

    Weight 15% · 31% here
  • Jurisdiction
    Sub-score:
    9/10

    Australia: jurisdiction score 9/10

    Our jurisdiction score, used as is: higher means lower political and permitting risk.

    Weight 6.75% · 14% here
  • Commodity
    Sub-score:
    2/10

    Primary commodity: Other

    Gold 10, copper 8, silver 5, nickel and uranium 4, others 2: most majors' deals are for gold.

    Weight 4.5% · 9% here

Weight is each input's share of the full score. “Here” is its share of this company's score: inputs that aren't scored are left out and the rest re-weighted, never counted as zero.

Overall Score Trend
-3.6% since 2026-08-09 · -22.9% from peak

Your Rankings

Community Sentiment
—SELLINGBUYING
CategoryCommunityYour Ranking
Overall— (0) 
Management— (0) 
Financials— (0) 
Jurisdiction— (0) 
Project Quality— (0) 

Management Team

Managing Director of Empire Metals Limited.

Finance Director of Empire Metals Limited.

Insiders, Investors & Smart Money

Notable shareholders and insiders whose involvement is worth knowing about, plus what we're seeing from institutional/large-investor activity.

Smart money
2/10

Three non-executive directors bought stock on the open market on the same day in November 2025, with no offsetting director selling found. The largest disclosed shareholders are UK retail-broker nominee accounts (Hargreaves Lansdown, Interactive Investor, AJ Bell and others), which are custody lines rather than institutional or specialist positions, so they do not count toward this metric.

No notable insiders tracked for this miner yet.

Reports, Presentations & Documents

Technical Report Takeaways

Empire Metals is advancing the Pitfield titanium project in the wheatbelt of Western Australia, about 160 km south of Geraldton, which it acquired in April 2022 as a copper-gold target before drilling in 2023 revealed a large titanium dioxide (TiO2) deposit. An upgraded resource estimate announced in August 2026 for the Thomas and Cosgrove deposits totals 8.16 billion tonnes at 4.3% TiO2, or about 349 million tonnes of contained TiO2, and introduced a measured category of 374 million tonnes at 5.8% TiO2 (21,640,000 tonnes contained). Metallurgical test work has produced titanium dioxide pigment of 99.25% purity. Continuous metallurgical piloting is under way in support of a scoping study, and no economic study has been published yet.