JUNIORMETRICS

Endeavour Silver Corp.

EXK·EDR·US$8.20 (CAD 11.53)·US$2.4B cap
Silveralso:Guanacevi & Terronera Mines, Mexico (and Kolpa Mine, Peru) Map

Endeavour Silver operates the Guanacevi silver-gold mine and the newly commissioned Terronera silver-gold mine in Mexico, plus the Kolpa polymetallic mine in Peru following its January 2026 sale of the Bolañitos mine; Q1 2026 revenue jumped to $209.7 million from $63.5 million a year earlier on higher metal prices and Terronera's ramp-up, with $231.8 million of cash and $236.1 million of convertible senior notes outstanding as of March 31, 2026.

Notable vs. Peers

  • All-in sustaining cost of $36.89/oz Ag, by-product is 100% higher than the peer producer average of $18.45/oz Ag, by-product.
  • Financials score of 5.4/10 is weaker than the peer average of 7.1/10.

Lifecycle Milestones

Grassroots
Resource Def.
PEA
PFS
Feasibility
Permitting
Construction
ProductionCurrent

Construction Milestones

5 of 5 reached
  1. Reached — date not disclosed · Source
  2. Apr 2023 · Source
  3. Apr 2023 · Source
  4. Mar 2025 · Source
  5. Reached — date not disclosed · Source

Milestones are recorded only from a company's own dated disclosure. A milestone with no date shown is one we can confirm was reached but for which no date was disclosed — we don't estimate one. "Not yet reached" means exactly that, not that a date is missing. An "Expected" line likewise only ever reflects the company's own guidance (e.g. a study or permit decision targeted for a stated quarter) — most not-yet-reached milestones have none, and that absence means no such guidance has been disclosed, not that one is overdue.

Prior Ownership & Infrastructure
Guanacevi & Terronera Mines, Mexico (and Kolpa Mine, Peru)
Existing MillTailings FacilityRoad Access3 of 4 checked, 3 in place

Not yet determined: grid power.

Combined view across 2 projects. Figures below are only combined where the underlying basis genuinely matches -- see the notes under each.

Combined resource
—
No project has a disclosed resource figure yet
IRR, per project
  • 21.3%Terronera Project, Jalisco, Mexico
Each project's own figure -- IRR is not additive across independent projects, so these are never combined
Mine life, per project
  • 12 yrsTerronera Project, Jalisco, Mexico
Each project's own figure -- independent mine lives are never added or averaged
Combined NPV, by discount-rate basis
$174.1M
At 5% discount rate -- Terronera Project, Jalisco, Mexico
8.1/10
Weak track recordStrong track record
8.1/10 vs.
5.4/10
Thin runwayWell-capitalized
5.4/10 vs.
How this is calculated
Not yet researched
Weaker depositStronger deposit
How this is calculated
7.5/10
Harder place to buildEasier place to build
7.5/10 vs.
What goes into it
  • Jurisdiction (40%)6/10

    Mexico has a long mining tradition and skilled workforce, but security concerns in some states and an evolving regulatory/mining-law environment add meaningful risk versus the US/Canada; Endeavour's Kolpa mine in Peru adds further jurisdictional diversification.

  • Infrastructure (40%)8.6/10

    A confirmed mill, confirmed road access, and a confirmed tailings facility at Guanacevi & Terronera Mines, Mexico (and Kolpa Mine, Peru); grid power not yet researched, counted at a neutral 5/10 until established.

  • Nearby producing mine (20%)8.3/10

    San Julian (Fresnillo plc) is 46 km away -- within regional-platform range.

6.5/10
Weaker profileStronger profile
6.5/10 vs.
Price Chart
$5.68$8.74$9.55$7.85$8.30AugDecAprJulOct3
Aug 12, 2025 – Oct 20, 2026
News
$8.20
+25.5%from low-43.8%from high
$6.54$14.60
See who ↓
0.2%
Low alignmentHigh alignment
0.2% vs.
See who ↓
61.6%
Low alignmentHigh alignment
61.6% vs.
$2.4B
Far belowFar above
$2.4B vs. $689M peer median
Price (USD - Local)
US$8.20 (CAD 11.53)
Cash Position (USD)
$236.6M
Far belowFar above
$236.6M vs. $57.3M peer median
Debt (USD)
$246.8M
Far aboveFar below
$246.8M vs. $8.1M peer median
$2.4B
Far belowFar above
$2.4B vs. $599.2M peer median
296.1M
Far aboveFar below
296.1M vs. 270.1M peer median
Jurisdiction
Mexico
Underground
See projects ↓
$36.89/oz Ag, by-product
See projects ↓
See projects ↓
See projects ↓
$20.00/oz65% below spot ($57.79/oz)2021 study
See projects ↓
0.2%
0%100%
0.2% vs. 5.2% peer median
61.6%
0%100%
61.6% vs. 3.3% peer median
46 kmfrom Fresnillo plc's San Julian
Within regional-platform range (~50km)
-$41M
Far belowFar above
-$41M vs. $44.5M peer median
-$0.138
Far belowFar above
-$0.138 vs. $0.103 peer median
$40M
Far belowFar above
$40M vs. $568M peer median
$0.135
Far belowFar above
$0.135 vs. $1.26 peer median

Acquisition Susceptibility

How this is calculated
5.5/10
Unlikely bolt-onFits the takeout profile

A relative ranking of how closely this company matches the profile of juniors that have actually been acquired — not a probability, and not a reason to buy. Acquisitions are rare: only a few dozen significant deals happen a year across a universe of thousands of juniors, so even a high score here describes a long shot. The strongest signal in the research, a producer that already owns part of the company, is scored from its disclosed strategic shareholders. A producer that is a joint-venture or earn-in partner on the project, rather than a shareholder, isn't captured yet.

How this score is built

  • Disclosed pending deal
    Sub-score: Not scored

    No pending acquisition or merger disclosed (checked)

    Not scored: having no deal in flight isn't held against a company.

    Weight 26.25%
  • Producer's strategic stake
    Sub-score: Not scored

    No producer holds a disclosed stake on file (holder register researched) See holders

    Not scored: most juniors that do get bought had no prior toehold, so a missing stake says little either way.

    Weight 25%
  • Distance to a producing mine
    Sub-score:
    5.4/10

    Nearest producing mine: San Julian (Fresnillo plc), 46 km

    10 next to a producing mine, 8 at 20 km, 5 at 50 km, 0 beyond 200 km.

    Weight 22.5% · 46% here
  • Lifecycle stage
    Sub-score:
    5.5/10

    Stage: Production

    Feasibility and permitting score 10, where deals cluster, and production 5.5; earlier stages score less, down to 1 at grassroots.

    Weight 15% · 31% here
  • Jurisdiction
    Sub-score:
    6/10

    Mexico: jurisdiction score 6/10

    Our jurisdiction score, used as is: higher means lower political and permitting risk.

    Weight 6.75% · 14% here
  • Commodity
    Sub-score:
    5/10

    Primary commodity: Silver

    Gold 10, copper 8, silver 5, nickel and uranium 4, others 2: most majors' deals are for gold.

    Weight 4.5% · 9% here

Weight is each input's share of the full score. “Here” is its share of this company's score: inputs that aren't scored are left out and the rest re-weighted, never counted as zero.

Overall Score Trend
+12.1% since 2026-07-30 · -8.5% from peak

Your Rankings

Community Sentiment
—SELLINGBUYING
CategoryCommunityYour Ranking
Overall— (0) 
Management— (0) 
Financials— (0) 
Jurisdiction— (0) 
Project Quality— (0) 

Management Team

Chief Executive Officer of Endeavour Silver Corp., appointed effective 13 May 2021, responsible for the Company's strategic direction, vision, growth and performance. BComm, University of British Columbia. Joined Endeavour Silver in Mar 2007 as Controller, rising to CFO and building the Company's financial infrastructure over 14 years as it grew from four employees to a team of over 2,000. Earlier career: assurance group, KPMG LLP (2001-2007), focused on publicly traded precious-metals companies.

Chief Financial Officer of Endeavour Silver Corp. effective 1 Jan 2024. Fellow of the Institute of Chartered Accountants in England and Wales; undergraduate degree in Psychology, Oxford University. Over 20 years of accounting, corporate-finance and corporate-treasury experience. Career: began at Deloitte and Touche LLP's mining group (2002); Group Treasurer, First Quantum Minerals, London office (8 years); CFO for a group of Vancouver-based exploration companies (Fury Gold Mines, Tier One Silver, Coppernico Metals, Torq Resources) formed through acquisitions and spin-outs, immediately before Endeavour Silver.

Chief Operating Officer of Endeavour Silver Corp., appointed effective 1 Mar 2026, succeeding Don Gray (retired 30 Apr 2026). Mexican geological engineer, Geological Engineering degree, Instituto Politecnico Nacional (Mexico City, 1989), 33+ years of mineral exploration and mining experience. Joined Endeavour Silver as Project Geologist in 2004, promoted to Exploration Manager (2008) and Vice President of Exploration (2012), directly involved in guiding Endeavour's exploration programs including numerous new mineral discoveries in the Guanacevi and Guanajuato districts. Earlier career: geological engineer/projects manager/department head across the Mexican Government (Mexican Geological Survey, CONAE), 1990-1998; exploration manager for private Mexican mining companies (Minera Zocalo, Minera Fuerte Mayo, Minera Real de Panuco), 1998-2004.

Insiders, Investors & Smart Money

Notable shareholders and insiders whose involvement is worth knowing about, plus what we're seeing from institutional/large-investor activity.

Smart money
3/10

Two directors put real money in at the June 2026 lows while most of the executive team was selling into strength. Kenneth Pickering bought 20,000 shares at $10.80 on 9 June and George Paspalas 5,000 at $12.72 on 3 June, both opening or building genuine positions. Against that, nine insiders sold about 125,000 shares between March and May at $13.30 to $15.41 -- roughly five times the buying -- so this is a divided register rather than a unified one. Precious-metals specialists including Sprott and Baker Steel Capital are present among the institutional holders, though our sources do not disclose the sizes of their positions. Van Eck Associates Corporation, the sponsor behind the GDX/GDXJ gold-miner ETF family, separately discloses a real 10.31% stake, though that exposure is largely index-driven rather than a specialist's discretionary pick.

No notable insiders tracked for this miner yet.

Reports, Presentations & Documents

Technical Report Takeaways

Endeavour Silver operates the Guanaceví silver-gold mine and the Terronera silver-gold mine in Mexico, along with the Kolpa polymetallic mine in Peru, after selling its Bolañitos mine in January 2026; silver accounted for 57.2% of 2025 revenue. Terronera, its newest mine, in Jalisco, produced its first concentrate in March 2025 and declared commercial production effective 1 October 2025. Terronera's 2021 feasibility study, prepared before construction, shows an NPV5% of US$174.1M and a 21.3% IRR at US$20/oz silver over a 12-year life; the mine's capital cost has since risen well above that study's estimate, and no newer study has been published. Q2 2026 consolidated production was a record 1,943,955 oz of silver and 10,474 oz of gold (3.4 million oz silver-equivalent), at an all-in sustaining cost of US$36.89 per silver ounce.

Recent News

Balance SheetEarningsEarnings GrowthMiningOperational DisruptionShare PriceShareholderSilverValuation