JUNIORMETRICS

DPM Metals Inc.

DPMLF·DPM·DPM·US$41.64 (CAD 58.55)·US$9.1B cap
Goldalso:Multi-project operator -- see Projects tab (Chelopech, Ada Tepe, Vares, Coka Rakita/Timok, Loma Larga) Map

DPM Metals Inc. (renamed from Dundee Precious Metals Inc. effective 12 Sep 2025) is a diversified gold producer operating the Chelopech underground gold-copper-silver mine and the Ada Tepe open-pit gold mine in Bulgaria, plus the newly-acquired Vares Silver Project in Bosnia and Herzegovina (via the Sep 2025 Adriatic Metals acquisition). Growth pipeline includes the Coka Rakita (Timok) gold project in Serbia, advancing toward a construction decision, and the Loma Larga gold-silver-copper feasibility-stage project in Ecuador. Dual-listed on the TSX (primary) and ASX (CDIs, added alongside the Adriatic Metals acquisition/rebrand).

Notable vs. Peers

  • Jurisdiction risk score of 6/10 is meaningfully riskier than the peer average of 7.8/10.
  • All-in sustaining cost of $1,417/oz AuEq is 42% lower than the peer producer average of $2,438/oz AuEq.

Lifecycle Milestones

Grassroots
Resource Def.
PEA
PFS
Feasibility
Permitting
Construction
ProductionCurrent

Construction Milestones

5 of 5 reached
  1. Aug 2016 · Source
  2. Reached — date not disclosed · Source
  3. Reached — date not disclosed · Source
  4. Mar 2019 · Source
  5. Reached — date not disclosed · Source

Milestones are recorded only from a company's own dated disclosure. A milestone with no date shown is one we can confirm was reached but for which no date was disclosed — we don't estimate one. "Not yet reached" means exactly that, not that a date is missing. An "Expected" line likewise only ever reflects the company's own guidance (e.g. a study or permit decision targeted for a stated quarter) — most not-yet-reached milestones have none, and that absence means no such guidance has been disclosed, not that one is overdue.

Prior Ownership & Infrastructure
Chelopech
Existing MillTailings FacilityRoad AccessGrid Power10/10 built out
Ada Tepe
Existing MillTailings FacilityRoad AccessGrid Power10/10 built out
Vares Silver Project
Existing MillTailings FacilityRoad AccessGrid Power10/10 built out
Coka Rakita (Timok)
0/10 built out

Not in place: mill, tailings facility, road access, grid power.

Loma Larga
0/10 built out

Not in place: mill, tailings facility, road access, grid power.

Tierras Coloradas
2 of 4 checked, 0 in place

Not in place: mill, tailings facility. Not yet determined: road access, grid power.

Combined view across 6 projects. Figures below are only combined where the underlying basis genuinely matches -- see the notes under each.

Combined resource
2.7M oz Au
Sum of 1 of 6 projects with a disclosed figure; others not yet researched
IRR, per project
  • 36%Coka Rakita (Timok)
  • 18.1%Loma Larga
Each project's own figure -- IRR is not additive across independent projects, so these are never combined
Mine life, per project
  • 10 yrsChelopech
  • 4 yrsAda Tepe
  • 14.75 yrsVares Silver Project
  • 10 yrsCoka Rakita (Timok)
  • 11 yrsLoma Larga
Each project's own figure -- independent mine lives are never added or averaged
Combined NPV, by discount-rate basis
$4.5B
At 5% discount rate -- Chelopech + Ada Tepe + Vares Silver Project + Coka Rakita (Timok) + Loma Larga
Sum of 5 studies dated 2022-2026 on different price decks -- see each project
7.5/10
Weak track recordStrong track record
7.5/10 vs.
7.2/10
Thin runwayWell-capitalized
7.2/10 vs.
How this is calculated
5.9/10
Weaker depositStronger deposit
5.9/10 vs.
How this is calculated
8.4/10
Harder place to buildEasier place to build
8.4/10 vs.
What goes into it
  • Jurisdiction (40%)6/10

    DPM's operating mines are in Bulgaria (Chelopech, Ada Tepe), an EU member with an established mining industry, though its permitting and legal framework is not fully settled. It also holds Coka Rakita (Timok) in EU-candidate Serbia, the Vares silver project in Bosnia and Herzegovina (acquired with Adriatic Metals in September 2025), and Loma Larga in Ecuador, its highest-risk asset, where drilling was paused in September 2025 over community concerns about water contamination.

  • Infrastructure (40%)10/10

    A confirmed mill, confirmed road access, confirmed grid power, and a confirmed tailings facility at Chelopech.

  • Nearby producing mine (20%)10/10

    Assarel (Assarel-Medet JSC) is 18 km away -- within shared-mill trucking range.

7.3/10
Weaker profileStronger profile
7.3/10 vs.
Price Chart
$17.16$28.20$35.16$37.65$41.44AugDecMarJulOct222
Aug 12, 2025 – Oct 20, 2026
News
$41.64
+105.2%from low-17.9%from high
$20.29$50.73
See who ↓
3.3%
Low alignmentHigh alignment
3.3% vs.
See who ↓
75.7%
Low alignmentHigh alignment
75.7% vs.
$9.1B
Far belowFar above
$9.1B vs. $541.2M peer median
Price (USD - Local)
US$41.64 (CAD 58.55)
Cash Position (USD)
$761.2M
Far belowFar above
$761.2M vs. $91.1M peer median
Debt (USD)
Far aboveFar below
$0 vs. $6.5M peer median
$8.4B
Far belowFar above
$8.4B vs. $457.8M peer median
219.4M
Far aboveFar below
219.4M vs. 336.8M peer median
Jurisdiction
Bulgaria
2,700,000 oz
Feeds Deposit Quality score
Far belowFar above
2.7M oz vs. 1.3M oz peer median
$3,101.37/oz
Far aboveFar below
$3,101.37/oz vs. $132.92/oz peer median
Underground (Chelopech, Coka Rakita, Vares); Ada Tepe was open-pit heap-leach and concluded active mining 15 Jul 2026
9 yrs2023 study
Far belowFar above
9 yrs vs. 11.1 yrs peer median
$1,417/oz AuEq
See projects ↓
See projects ↓
See projects ↓
See projects ↓
3.3%
0%100%
3.3% vs. 12.1% peer median
75.7%
0%100%
75.7% vs. 3.3% peer median
18 kmfrom Assarel-Medet JSC's Assarel
Within shared-mill range (~20km)
$430.6M
Far belowFar above
$430.6M vs. $51.8M peer median
$1.96
Far belowFar above
$1.96 vs. $0.155 peer median
21.21x
Far aboveFar below
21.21x vs. 27.49x peer median
$471.1M
Far belowFar above
$471.1M vs. $592.2M peer median
$2.15
Far belowFar above
$2.15 vs. $2.02 peer median

Acquisition Susceptibility

How this is calculated
7.2/10
Unlikely bolt-onFits the takeout profile

A relative ranking of how closely this company matches the profile of juniors that have actually been acquired — not a probability, and not a reason to buy. Acquisitions are rare: only a few dozen significant deals happen a year across a universe of thousands of juniors, so even a high score here describes a long shot. The strongest signal in the research, a producer that already owns part of the company, is scored from its disclosed strategic shareholders. A producer that is a joint-venture or earn-in partner on the project, rather than a shareholder, isn't captured yet.

How this score is built

  • Disclosed pending deal
    Sub-score: Not scored

    No pending acquisition or merger disclosed (checked)

    Not scored: having no deal in flight isn't held against a company.

    Weight 26.25%
  • Producer's strategic stake
    Sub-score: Not yet researched

    Holder register not researched yet

    Not scored: most juniors that do get bought had no prior toehold, so a missing stake says little either way.

    Weight 25%
  • Distance to a producing mine
    Sub-score:
    8.2/10

    Nearest producing mine: Assarel (Assarel-Medet JSC), 18 km

    10 next to a producing mine, 8 at 20 km, 5 at 50 km, 0 beyond 200 km.

    Weight 22.5% · 46% here
  • Lifecycle stage
    Sub-score:
    5.5/10

    Stage: Production

    Feasibility and permitting score 10, where deals cluster, and production 5.5; earlier stages score less, down to 1 at grassroots.

    Weight 15% · 31% here
  • Jurisdiction
    Sub-score:
    6/10

    Bulgaria: jurisdiction score 6/10

    Our jurisdiction score, used as is: higher means lower political and permitting risk.

    Weight 6.75% · 14% here
  • Commodity
    Sub-score:
    10/10

    Primary commodity: Gold

    Gold 10, copper 8, silver 5, nickel and uranium 4, others 2: most majors' deals are for gold.

    Weight 4.5% · 9% here

Weight is each input's share of the full score. “Here” is its share of this company's score: inputs that aren't scored are left out and the rest re-weighted, never counted as zero.

Overall Score Trend
+10.6% since 2026-08-08 · -1.4% from peak

Your Rankings

Community Sentiment
—SELLINGBUYING
CategoryCommunityYour Ranking
Overall— (0) 
Management— (0) 
Financials— (0) 
Jurisdiction— (0) 
Project Quality— (0) 

Management Team

President and Chief Executive Officer of DPM Metals Inc. (formerly Dundee Precious Metals) since 7 May 2020 (COO 2014-2020; SVP Operations 2012-2014). Leading the company through its Sep 2025 rebrand and the acquisition of Adriatic Metals. A seasoned international mining and smelting executive with roles in Africa, Europe and Canada, including VP Commercial at Falconbridge Ltd. (2004-2006) and VP Commercial and Strategy at Xstrata Nickel (2006-2008, formed via Xstrata's acquisition of Falconbridge). Also held senior roles at BHP and Anglo American plc (specific dates not confirmed). BSc (Physical Metallurgy), Leeds University.

Executive Vice President and Chief Financial Officer of DPM Metals Inc. (formerly Dundee Precious Metals) since 14 Nov 2022. Over 25 years of finance and public-company experience. Before DPM, SVP & CFO of Teranga Gold Corporation for 9 years, until its Feb 2021 merger with Endeavour Mining Corporation; 7 years (2005-2012) at Barrick Mining Corporation in finance leadership roles including Head of Finance, Copper Business Unit; finance roles at a telecommunications firm (2003-2005); and an auditor at PricewaterhouseCoopers (1999-2003). Chartered Professional Accountant, Chartered Accountant; BCom, University of Toronto.

Insiders, Investors & Smart Money

Notable shareholders and insiders whose involvement is worth knowing about, plus what we're seeing from institutional/large-investor activity.

Smart money

Not scored. Smart-money tracking covers companies below about US$5B in market cap, where a single specialist fund or strategic investor taking a stake is a meaningful signal. This company was above that size when it was assessed.

No notable insiders tracked for this miner yet.

Reports, Presentations & Documents

Technical Report Takeaways

DPM Metals operates Chelopech and Ada Tepe in Bulgaria and Vares in Bosnia and Herzegovina, and is developing Coka Rakita in Serbia and Loma Larga in Ecuador. Its February 2026 statement gives 1.63 Moz of gold reserves (effective 31 May 2025) plus 1.07 Moz of additional measured and indicated resources, 2.7 Moz in total.

Recent News

CommoditiesEarningsFree Cash FlowMiningProduction Guidance
Bosnia HerzegovinaConcessionFinancial ResultsForestryFuture Cash FlowsGoldMining
CopperDrillingExplorationFinancial ResultsFuture Cash FlowsGoldMiningSplit