JUNIORMETRICS
Gold$4,479.95/oz
Silver$66.98/oz
Copper$6.00/lb

Dynacor Group Inc.

DNG·$4.18·$201.8M cap
GoldVeta Dorada Ore-Processing Plant, Peru (flagship) Map

Dynacor Group Inc. is an industrial gold-ore processing company, not a conventional mine operator -- it buys ore from licensed artisanal and small-scale miners in Peru, processes it at its Veta Dorada plant under a responsible, audited/traceable supply-chain model, and sells refined gold. Since 1996 the company has pioneered this traceability-and-audit approach for the artisanal mining industry. Q4 2025 gold-equivalent production was 32,838oz, capping a record year that beat revised annual production guidance; 2026 outlook targets continued optimisation in Peru plus first contributions from new plants launching in Ecuador and Senegal. As at 31 Mar 2026 (Q1 2026), working capital was $85.9m including $30.7m cash (up from $82.0m/$33.5m cash at 31 Dec 2025 on a working-capital basis, though the cash component itself declined q/q); total assets $183.6m. The company reports no debt. Board recently appointed Rejean Gourde as Chair; President & CEO is Jean Martineau. Commodity=GOLD given its output, though the business model (toll/purchase processing of third-party artisanal ore rather than owning/operating mines) is materially different from a conventional miner -- noted here so the figures aren't misread as reserve-backed mine economics.

Notable vs. Peers

  • Jurisdiction risk score of 6/10 is meaningfully riskier than the peer average of 7.8/10.

Lifecycle Milestones

Grassroots
Resource Def.
PEA
PFS
Feasibility
Permitting
Construction
ProductionCurrent

Construction Milestones

5 of 5 reached
  1. Mar 2015 · Construction permit issued to Minera Veta Dorada (Dynacor's Peruvian subsidiary) on 17 March 2015 for the 300tpd Veta Dorada ore processing plant in Chala, Peru. (A separate operating-concession permit, Resolucion Directoral No 0235-2016-MEM/DGM, was issued by Peru's Ministry of Energy and Mines on 1 September 2016 authorising the plant's 300tpd operation and tailings pond -- both permits are part of the same real chain; the earlier construction permit is used here as the gate's target milestone since it precedes construction.) · Source
  2. Reached — date not disclosed · No separately labelled board/FID release found distinct from the March 2015 construction permit (see PERMIT_GRANTED), which directly enabled construction of the Veta Dorada plant to proceed. Recorded reached-but-undated to that point. · Source
  3. Reached — date not disclosed · Construction of the Veta Dorada plant was underway through 2015 (reported 52% complete at one interim update) and finished at the end of May 2016, with MEM construction-conformity certification received in June 2016. Exact construction-start day not confirmed; recorded reached-but-undated to 2015. · Source
  4. Oct 2016 · First gold poured at the Veta Dorada plant in Chala, Peru -- announced 14 October 2016, following the plant's construction completion (end May 2016), MEM conformity certification (June 2016), operating-concession grant (1 Sept 2016) and official inauguration (3 Oct 2016). · Source
  5. Reached — date not disclosed · A genuine structural distinction: Dynacor does not operate a mine/deposit -- it buys ore from registered artisanal and small-scale miners in Peru and processes it at its own plant (a toll-processing business model, not conventional mining). The Veta Dorada ore-processing plant (Chala, Peru) began operating 2016-09-30, was inaugurated 2016-10-03, and poured first gold 2016-10-14 -- but no source found ever frames this with 'commercial production declared' language (contrast SBMI's explicitly-titled announcement, below), consistent with a continuously-ramping toll-processing operation rather than a single-threshold mine. Left null with the structural context and the September/October 2016 start dates noted; multiple later capacity expansions (300->430->500 tpd) are the same plant, same company, not a reset. This row was missing entirely prior to 2026-08-21 -- a genuine data gap, not a stage error; Miner.stage was already correctly PRODUCTION. · Source

Milestones are recorded only from a company's own dated disclosure. A milestone with no date shown is one we can confirm was reached but for which no date was disclosed — we don't estimate one. "Not yet reached" means exactly that, not that a date is missing. An "Expected" line likewise only ever reflects the company's own guidance (e.g. a study or permit decision targeted for a stated quarter) — most not-yet-reached milestones have none, and that absence means no such guidance has been disclosed, not that one is overdue.

Weak track recordStrong track record
7.7/10
Thin runwayWell-capitalized
6/10
High riskLow risk
How this is calculated
Not enough info
Weaker depositStronger deposit
6.9/10
Weaker profileStronger profile
Price Chart
$3.48$3.37$4.84$4.74$4.18AugNovFebJunSep
Aug 12, 2025Sep 4, 2026
News
$4.18
+41.7%from low-16.6%from high
$2.95$5.01
$201.8M
Far belowFar above
$563.3M median
Price (USD - Local)
$4.18 - CAD 5.79
Cash Position (USD)
$22M
Far belowFar above
$92.4M median
Debt (USD)
Far aboveFar below
$6.2M median
$179.8M
Far belowFar above
$527M median
42M
Far aboveFar below
305.4M median
Jurisdiction
Peru
This company's data hasn't been researched yet
This company's data hasn't been researched yet
This company's data hasn't been researched yet
N/A -- industrial gold-ore processing plant (buys ore from third-party artisanal/small-scale miners), not a conventional mine operator
This company's data hasn't been researched yet
This company's data hasn't been researched yet
Not enough peer data yet
This company's data hasn't been researched yet
Not enough peer data yet
This company's data hasn't been researched yet
7.3%
0%100%
19.3% median
This company's data hasn't been researched yet
This company's data hasn't been researched yet
This company's data hasn't been researched yet
This company's data hasn't been researched yet
This company's data hasn't been researched yet
This company's data hasn't been researched yet
Acquisition Susceptibility
6.4/10
Unlikely bolt-onFits the takeout profile

A relative ranking of how closely this company matches the profile of juniors that have actually been acquired — not a probability, and not a reason to buy. Acquisitions are rare: only a few dozen significant deals happen a year across a universe of thousands of juniors, so even a high score here describes a long shot. The strongest signal the underlying research identifies — whether a major already holds a JV, earn-in, or 5–19.9% strategic stake — isn't tracked yet and is absent from this score.

Overall Score Trend
+0% since 2026-08-09

Your Rankings

Community Sentiment
SELLINGBUYING
CategoryCommunityYour Ranking
Overall (0)Log in to rank
Management (0)Log in to rank
Financials (0)Log in to rank
Jurisdiction (0)Log in to rank
Project Quality (0)Log in to rank

Management Team

President and CEO of Dynacor Group Inc.

Insiders, Investors & Smart Money

Notable shareholders and insiders whose involvement is worth knowing about, plus what we're seeing from institutional/large-investor activity.

Smart money
2/10

No strategic or fund backing was found for Dynacor, but four different company insiders bought stock on the open market between March and May 2026, with no offsetting insider selling in that window.

No notable insiders tracked for this miner yet.

Reports, Presentations & Documents

Technical Report Takeaways

We haven't parsed this company's PEA/PFS/FS recommendations yet — cut-off grade, mine life, DCF/NPV, and the report's own next-steps guidance are a planned research pass, not live data for every company yet.