Capricorn Metals operates the 100%-owned Karlawinda open-pit gold mine in Western Australia (FY26 guidance 115,000-125,000oz, tracking toward the top of range) and is advancing the 100%-owned Mt Gibson Gold Project through final permitting (process plant design ~98% complete). The company reported record half-year results in February 2026 and paid its first-ever dividend (a fully franked 5 cents/share interim payment).
Notable vs. Peers
- All-in sustaining cost of $1,140/oz is 42% lower than the peer producer average of $1,965/oz.
Lifecycle Milestones
Construction Milestones
5 of 5 reached- Reached — date not disclosed · Karlawinda's mining lease and Native Title Access Agreement were granted/completed ahead of the December 2019 construction start (see CONSTRUCTION_START already on file). No single dated 'permit granted' press release was located distinct from the project's general pre-construction permitting reporting; recorded reached-but-undated, prior to Dec 2019. · Source
- Reached — date not disclosed · No discrete, separately-labelled board/FID release was located distinct from the already-on-file December 2019 CONSTRUCTION_START row; recorded reached-but-undated, immediately prior to that construction start (Capricorn's 2017 Feasibility Study and subsequent permitting had already established project economics). · Source
- Reached — date not disclosed · Construction of the Karlawinda Gold Project commenced following the Capricorn Metals board's approval of the commencement of project construction in December 2019. Development proceeded through 2020 with commissioning guided to the March 2021 quarter; first gold was poured 30 June 2021 (see the FIRST_PRODUCTION row) and operations commenced June 2021, on time and on budget. Corroborating sources: Capricorn's FY2020 financial report (https://capmetals.com.au/wp-content/uploads/2020/09/2020.09.17-CMM-Financial-Report-2020-Final-signed.pdf) and https://im-mining.com/2020/11/19/capricorn-metals-moves-final-development-stretch-karlawinda-gold-project/. achievedDate left null: December 2019 is a month-level board-approval date and no source gives a distinct day on which site construction physically began. Task #610 (2026-08-25): this row was referenced in prose by CMM's existing PERMIT_GRANTED note ('see CONSTRUCTION_START already on file') but had never actually been created -- the note asserted a row that did not exist. · Source
- Jun 2021 · First gold pour at the Karlawinda Gold Project (65km south-east of Newman, Pilbara, Western Australia) on 30 June 2021: gold bars weighing 12kg (386 oz) were poured in the first smelt on site. Karlawinda was delivered on time and on budget, with operations commencing June 2021, following the board's December 2019 approval to commence construction. Day-level date corroborated by trade press reporting of the company's own announcement: https://www.globalminingreview.com/mining/05072021/capricorn-metals-pours-first-gold-at-karlawinda-gold-project/ and https://www.mining-technology.com/news/capricorn-metals-pours-first-gold-at-karlawinda-mine-in-australia/. Distinct from the already-on-file COMMERCIAL_PRODUCTION row (Q3 2021, Jul-Sep), which correctly post-dates this first pour. The Karlawinda Expansion Project (KEP) and the separate Mt Gibson project are NOT the basis for this row -- KEP first gold is guided to Q1 FY27 and Mt Gibson has not reached production. Task #610 (2026-08-25): row was missing entirely; stage=PRODUCTION was already correct. · Source
- Reached — date not disclosed · Genuinely reached: Capricorn Metals is currently a single-producing-asset company -- the Karlawinda Gold Project in Western Australia reached commercial production in Q3 2021 (calendar Jul-Sep 2021), but no source with an exact day-level date was found, so achievedDate is left null rather than invented. The company's second project, Mt Gibson, received federal environmental approval 2026-06-30 and is targeting construction start in the December 2026 quarter -- it has NOT yet reached production and is explicitly not part of this claim. FY26 delivered 123,589 oz gold from Karlawinda. This row was missing entirely prior to 2026-08-21 -- a genuine data gap, not a stage error; Miner.stage was already correctly PRODUCTION. · Source
Milestones are recorded only from a company's own dated disclosure. A milestone with no date shown is one we can confirm was reached but for which no date was disclosed — we don't estimate one. "Not yet reached" means exactly that, not that a date is missing. An "Expected" line likewise only ever reflects the company's own guidance (e.g. a study or permit decision targeted for a stated quarter) — most not-yet-reached milestones have none, and that absence means no such guidance has been disclosed, not that one is overdue.
A relative ranking of how closely this company matches the profile of juniors that have actually been acquired — not a probability, and not a reason to buy. Acquisitions are rare: only a few dozen significant deals happen a year across a universe of thousands of juniors, so even a high score here describes a long shot. The strongest signal the underlying research identifies — whether a major already holds a JV, earn-in, or 5–19.9% strategic stake — isn't tracked yet and is absent from this score.
Your Rankings
Management Team
Chief Executive Officer and Executive Chairman of Capricorn Metals Ltd (Executive Chairman since joining Jul 2019; personally resumed CEO duties in May 2025 after Deputy CEO Paul Criddle -- also tracked in this DB -- stepped down as CEO). Overseen the development and commissioning of the Karlawinda Gold Project and the acquisition and progress of the Mt Gibson Gold Project. 35+ years of experience in corporate advisory and public-company management, beginning his career in the 1980s as a corporate lawyer advising on resource project acquisitions, financing and development. CFO/Company Secretary then Managing Director of Equigold NL (1995-Jun 2008, through its A$1.2bn merger with Lihir Gold). Managing Director then Executive Chairman of Regis Resources Limited (May 2009-Oct 2018), overseeing development of the Duketon Gold Project's three operating mines.
Deputy Chief Executive Officer of Capricorn Metals Ltd -- confirmed current in this role as of an Aug 2026 shareholder call. Qualified metallurgist with 20+ years of operating and development experience across Australian and Canadian-listed companies, developing projects in Africa, Australia and Canada. Joined Capricorn as COO in May 2024, was appointed CEO in Feb 2025, and resigned that role in May 2025 'to focus on personal priorities' -- days after an aggravated-assault charge against him (unrelated to any company conduct) was dismissed in court; Capricorn publicly stated its intent to welcome him back, and he subsequently returned to the company as Deputy CEO (an internal Capricorn progression, not written as an external role). Before Capricorn, COO of the TSX-listed Roxgold Inc. (2013-2020, through its acquisition by Fortuna Mining) and, before that, senior roles at Perseus Mining (already tracked in this DB, PRU) developing the Edikan and Sissingue Projects in West Africa.
Insiders, Investors & Smart Money
Notable shareholders and insiders whose involvement is worth knowing about, plus what we're seeing from institutional/large-investor activity.
No producer or strategic investor holds a stake, and the register is dominated by index money -- VanEck's gold ETFs at 7.17%, plus Vanguard, Schwab and SPDR. Paradice Investment Management has crossed above 5% and back out three times in nine months, most recently ceasing in June 2026, which reads as trading rather than conviction. What is current and clean is a director purchase: Jillian Irvin bought 7,750 shares on-market at $12.86 on 6 May 2026, from a starting position of nil. It is a small sum, so read it as direction rather than as a large financial commitment. Management separately owns about 10%.
No notable insiders tracked for this miner yet.
Reports, Presentations & Documents
Capricorn Metals Group Mineral Resource (KGP + MGGP combined), effective 31 Mar 2026, per the 27 Jul 2026 ASX release 'Capricorn Gold Reserves Increase to 5.2 Million Ounces': Indicated 275.8 Mt @ 0.8 g/t Au for 7,082,000 oz (KGP 124.9 Mt @ 0.6 g/t for 2,382koz + MGGP OP&UG 150.9 Mt @ 1.0 g/t for 4,700koz) + a separate 1,577,000 oz Inferred (73.2 Mt @ 0.7 g/t), not included here per this repo's M+I-only convention -- no Measured category exists at either project. Group Ore Reserve (Probable only) is 5,241,000 oz (195.7 Mt @ 0.8 g/t), a subset of the above. dcfNpvUsd/irrPct/mineLifeYears intentionally left null and flagged for Task #387: no combined group figure exists -- Mt Gibson's same-day PFS states its own standalone A$6.1B pre-tax NPV7.5/19.25yr mine life (a pre-production growth project, not the whole company), and Karlawinda is a mature operating asset the JORC Table 1 itself states is 'not subject to project-type analysis' (LOM plans updated annually rather than a discrete NPV study). Same shape as the AAUC/RSG/SRB/THX Wave 3/4 precedent and the 26 mega-cap companies flagged in Wave 5 batch 1, at Capricorn's two-asset scale.