JUNIORMETRICS
Gold$4,479.95/oz
Silver$66.98/oz
Copper$6.00/lb

Cabral Gold Inc.

CBGZF·CBR·$1.09·$225.5M cap
GoldCuiú Cuiú Gold Project, Tapajós, Pará State, Brazil Map

Cabral Gold's 100%-owned Cuiú Cuiú district covers ~30,563 hectares in Brazil's Tapajós gold region. A July 2025 PFS on the 1Mtpa gold-in-oxide heap leach starter project reported 78% after-tax IRR and US$74M NPV5% at US$2,500/oz gold, a 10-month payback, and life-of-mine AISC of US$1,210/oz. Construction was fully funded via the US$45.1M Gold Loan; as of July 2026 mining, stacking and plant commissioning are underway, targeting first gold/commercial production in Q4 2026.

Notable vs. Peers

  • Financials score of 4.5/10 is weaker than the peer average of 6.4/10.
  • Jurisdiction risk score of 6/10 is meaningfully riskier than the peer average of 7.8/10.
  • All-in sustaining cost of $1,210/oz is 38% lower than the peer producer average of $1,965/oz.
  • Trading within 5% of its 52-week high — strong recent price momentum.

Lifecycle Milestones

Grassroots
Resource Def.
PEA
PFS
Feasibility
Permitting
ConstructionCurrent
Production

Construction Milestones

3 of 5 reached
  1. Reached — date not disclosed · Phase 1 construction has proceeded under previously-issued GU's (Guias de Utilização / Trial Mining Licenses, combined 500,000 tpa capacity) -- referenced as 'currently licensed' in the March 10, 2026 release below, which itself grants a separate, larger Licença Prévia (LP) for the FULL mining license (enabling later expansion to 1,000,000 tpa and Phase 2 hard-rock development). The GU's exact grant date was not found in available primary sourcing -- recorded reached-but-undated rather than inventing one. (Real, sourced case of construction/financing preceding the broader LP permit, same shape as the SKE precedent in batch 1.) · Source
  2. Oct 2025 · Board of Directors approved the construction decision for the Phase 1 heap leach starter operation on execution of a US$45M gold loan with Precious Metals Yield Fund (Phoenix Gold Fund affiliate) that fully funds the project's estimated US$37.7M capex. · Source
  3. Reached — date not disclosed · Mining, stacking and plant commissioning underway as of July 2026; construction fully funded via the US$45.1M Gold Loan
  4. Not yet reached
    Expected Sep 2026 · First gold at Cuiú Cuiú Phase I gold-in-oxide heap leach; commercial production targeted Q4 2026 · Source
  5. Not yet reached

Milestones are recorded only from a company's own dated disclosure. A milestone with no date shown is one we can confirm was reached but for which no date was disclosed — we don't estimate one. "Not yet reached" means exactly that, not that a date is missing. An "Expected" line likewise only ever reflects the company's own guidance (e.g. a study or permit decision targeted for a stated quarter) — most not-yet-reached milestones have none, and that absence means no such guidance has been disclosed, not that one is overdue.

10/10
Weak track recordStrong track record
4.5/10
Thin runwayWell-capitalized
6/10
High riskLow risk
How this is calculated
3.5/10
Weaker depositStronger deposit
6/10
Weaker profileStronger profile
Price Chart
$0.294$0.402$0.646$0.617$1.09AugNovMarJunSep
Aug 12, 2025Sep 4, 2026
News
$1.09
+296.3%from low-4.1%from high
$0.28$1.14
$225.5M
Far belowFar above
$563.3M median
Price (USD - Local)
$1.09 - CAD 1.51
Cash Position (USD)
$35.8M
Far belowFar above
$92.4M median
Debt (USD)
$47M
Far aboveFar below
$5.7M median
$236.7M
Far belowFar above
$527M median
305.4M
Far aboveFar below
303M median
Jurisdiction
Brazil
128,903 oz
Far belowFar above
1.3M median
$1,836.44/oz
Far aboveFar below
$157.18/oz median
Cut-off: 0.1 g/t Au (Central & Machichie open pit Mineral Resource cut-off, pit-constrained at US$2,600/oz gold price)
This company's data hasn't been researched yet
Open pit, heap leach
6.2 yrs
Far belowFar above
11 yrs median
$1,210/oz
@5%$73.9M(at $2,500/oz)
Far belowFar above
$603M median
3.05x
Far aboveFar below
0.40x median
This company's data hasn't been researched yet
Not enough peer data yet
$2,500/oz44% below spot ($4,480/oz)
78%Clears Durrett's 25% developer bar
Far belowFar above
41% median
6%
0%100%
19.3% median
This company's data hasn't been researched yet
1235 kmfrom Zijin Mining Group's Rosebel
Outside typical bolt-on range
This company's data hasn't been researched yet
This company's data hasn't been researched yet
This company's data hasn't been researched yet
This company's data hasn't been researched yet
This company's data hasn't been researched yet
Acquisition Susceptibility
3.9/10
Unlikely bolt-onFits the takeout profile

A relative ranking of how closely this company matches the profile of juniors that have actually been acquired — not a probability, and not a reason to buy. Acquisitions are rare: only a few dozen significant deals happen a year across a universe of thousands of juniors, so even a high score here describes a long shot. The strongest signal the underlying research identifies — whether a major already holds a JV, earn-in, or 5–19.9% strategic stake — isn't tracked yet and is absent from this score.

Overall Score Trend
+13.2% since 2026-07-31 · -1.6% from peak

Your Rankings

Community Sentiment
SELLINGBUYING
CategoryCommunityYour Ranking
Overall (0)Log in to rank
Management (0)Log in to rank
Financials (0)Log in to rank
Jurisdiction (0)Log in to rank
Project Quality (0)Log in to rank

Management Team

President, Chief Executive Officer and Director of Cabral Gold Inc. Credited with 5 gold discoveries in Brazil with NI 43-101 compliant resources; one of the company's largest shareholders.

Chief Financial Officer and Corporate Secretary of Cabral Gold Inc.

President, Brazil for Cabral Gold Inc.

VP Technical Services at Cabral Gold Inc.

Vice President Project Development at Cabral Gold Inc.

VP Brazil Operations at Cabral Gold Inc.

VP Exploration at Cabral Gold Inc. Appointed August 2026; exploration geologist.

Insiders, Investors & Smart Money

Notable shareholders and insiders whose involvement is worth knowing about, plus what we're seeing from institutional/large-investor activity.

Smart money
2/10

Eric Sprott invested roughly $2 million in an April 2025 financing -- a real but modest-sized specialist stake at this company's scale. Director Lawrence Lepard, himself a well-regarded precious-metals investor, personally bought 63,500 shares on the open market on 2025-08-19. An earlier claim of a large Dundee Resources stake did not hold up: the last verifiable filing (2020) shows Dundee selling down to about 9.4% and falling, six years stale, so it was not counted.

No notable insiders tracked for this miner yet.

Reports, Presentations & Documents

Technical Report Takeaways

We haven't parsed this company's PEA/PFS/FS recommendations yet — cut-off grade, mine life, DCF/NPV, and the report's own next-steps guidance are a planned research pass, not live data for every company yet.