JUNIORMETRICS
Gold$4,479.95/oz
Silver$66.98/oz
Copper$6.00/lb

Central Asia Metals plc

CAML·$2.40·$365.5M cap
Copperalso:Kounrad Copper Operation, Kazakhstan (and Sasa Mine, North Macedonia; Antler Project, Arizona) Map

Central Asia Metals operates the 100%-owned Kounrad SX-EW copper operation in central Kazakhstan (producing since 2012) and the Sasa zinc-lead-silver mine in North Macedonia, and in 2025 acquired the high-grade Antler copper project in Arizona, USA, adding a US critical-minerals growth option. First-half 2026 Kounrad copper output rose 1% to 6,304 tonnes while Sasa's zinc and lead output rose 5-6%; net cash strengthened to $96.7 million at June 30, 2026 against minimal debt of roughly $0.9 million.

Notable vs. Peers

  • Financials score of 10/10 is stronger than the peer average of 5.3/10.
  • All-in sustaining cost of $0.82/lb is 68% lower than the peer producer average of $2.56/lb.
  • Jurisdiction risk score of 6/10 is meaningfully riskier than the peer average of 7.6/10.

Lifecycle Milestones

Grassroots
Resource Def.
PEA
PFS
Feasibility
Permitting
Construction
ProductionCurrent

Construction Milestones

5 of 5 reached
  1. Aug 2007 · CAML's own AIM Admission Document (Nov 2022 edition), "Summary of key agreements - Kounrad" section, verbatim: "The Kounrad Contract[,] The Contract for Exploration and Development of Copper out of the Technical Mineral Generations (Heaps) of the Kounrad Mine[,] was entered into by and between the Ministry of Energy and Mineral Resources of Kazakhstan ('MEMR') and the National Company Social and Entrepreneurial Corporation 'Saryarka' Joint Stock Company ('Saryarka') dated 20 August 2007... duly approved by the necessary competent authorities and registered with MEMR under registration number 2447." This is the founding subsoil-use contract underlying every later transfer/amendment, including the 60% transfer of subsoil use rights to CAML's own subsidiary Sary Kazna LLP (Amendment No. 1, dated 15 Nov 2007) -- the real permit-grant event, not a corporate-transaction proxy. Extracted via direct PDF text extraction (pdftotext) from the primary regulatory filing, not a search-engine summary. · Source
  2. Reached — date not disclosed · CAML's September 2010 IPO raised $60M specifically earmarked to build the Kounrad SX-EW recovery plant. No separately labelled FID release found distinct from the IPO/use-of-proceeds announcement; per the established site convention (financing committed for construction = practical decision-equivalent), this is used as CONSTRUCTION_DECISION. Exact day within September 2010 not confirmed; recorded reached-but-undated. · Source
  3. Reached — date not disclosed · Initial construction groundworks for the Kounrad SX-EW plant were underway by late 2010/early 2011, with the plant completed ~15% under budget in early 2012. Exact construction-start day not confirmed; recorded reached-but-undated. · Source
  4. Reached — date not disclosed · First copper cathode production from the Kounrad Eastern Dumps SX-EW plant in April 2012 (construction completed early 2012, $9M under budget). Exact day within April 2012 not confirmed; recorded reached-but-undated. · Source
  5. Reached — date not disclosed · Genuinely reached, but no single company-wide commercial-production date exists across two mines with very different histories: Kounrad (Kazakhstan, copper; CAML's own greenfield-style development, plant completed early 2012, production commencing April 2012) and Sasa (North Macedonia, zinc-lead; commercial production originally declared in 1966 under state ownership, decades before CAML's acquisition of Sasa in November 2017). Matches the Centerra Gold precedent (batch4): two separately-developed assets under entirely different ownership histories, no single company-wide date. This row was missing entirely prior to 2026-08-21 -- a genuine data gap, not a stage error; Miner.stage was already correctly PRODUCTION. · Source

Milestones are recorded only from a company's own dated disclosure. A milestone with no date shown is one we can confirm was reached but for which no date was disclosed — we don't estimate one. "Not yet reached" means exactly that, not that a date is missing. An "Expected" line likewise only ever reflects the company's own guidance (e.g. a study or permit decision targeted for a stated quarter) — most not-yet-reached milestones have none, and that absence means no such guidance has been disclosed, not that one is overdue.

10/10
Weak track recordStrong track record
10/10
Thin runwayWell-capitalized
6/10
High riskLow risk
How this is calculated
7.9/10
Weaker depositStronger deposit
8.5/10
Weaker profileStronger profile
Price Chart
$2.15$2.15$3.18$1.77$2.40AugNovFebJunSep
Aug 12, 2025Sep 4, 2026
News
$2.40
+41.5%from low-23.5%from high
$1.70$3.14
See who ↓
1.6%
Low alignmentHigh alignment
See who ↓
65.6%
Low alignmentHigh alignment
$365.5M
Far belowFar above
$2.2B median
Price (USD - Local)
$2.40 - GBP 1.78
Cash Position (USD)
$97.6M
Far belowFar above
$97M median
Debt (USD)
$900K
Far aboveFar below
$146.9M median
$268.8M
Far belowFar above
$2.1B median
170.4M
Far aboveFar below
670.9M median
Jurisdiction
Kazakhstan / North Macedonia / United States
This company's data hasn't been researched yet
This company's data hasn't been researched yet
Cut-off: Kounrad (Cu, Kazakhstan, dump-leach SX-EW): 0% Cu cutoff (by design, global stockpile reprocessing, no in-situ selectivity); Sasa (Zn-Pb-Ag, not copper): NSR US$53-65/t by mining method; Antler (Cu-Zn-Ag-Pb, via New World Resources, JV): most recent MRE cutoff not independently confirmed -- last verified figure is the Nov 2022 estimate at 1.0-2.0% CuEq, one vintage behind current headline resource
This company's data hasn't been researched yet
9 yrs
Far belowFar above
15 yrs median
$0.82/lb
This company's data hasn't been researched yet
Not enough peer data yet
This company's data hasn't been researched yet
Not enough peer data yet
This company's data hasn't been researched yet
1.6%
0%100%
14.8% median
65.6%
0%100%
2.4% median
2444 kmfrom Anglo Asian Mining plc's Gedabek
Outside typical bolt-on range
This company's data hasn't been researched yet
This company's data hasn't been researched yet
This company's data hasn't been researched yet
This company's data hasn't been researched yet
This company's data hasn't been researched yet
Acquisition Susceptibility
3.3/10
Unlikely bolt-onFits the takeout profile

A relative ranking of how closely this company matches the profile of juniors that have actually been acquired — not a probability, and not a reason to buy. Acquisitions are rare: only a few dozen significant deals happen a year across a universe of thousands of juniors, so even a high score here describes a long shot. The strongest signal the underlying research identifies — whether a major already holds a JV, earn-in, or 5–19.9% strategic stake — isn't tracked yet and is absent from this score.

Overall Score Trend
+6.3% since 2026-07-30 · -1.2% from peak

Your Rankings

Community Sentiment
SELLINGBUYING
CategoryCommunityYour Ranking
Overall (0)Log in to rank
Management (0)Log in to rank
Financials (0)Log in to rank
Jurisdiction (0)Log in to rank
Project Quality (0)Log in to rank

Management Team

Chief Executive Officer of Central Asia Metals plc, appointed to the Board in June 2016 and to CEO in October 2024. Over 25 years' experience in the mining sector, with previous roles at Anglo American, Barclays Capital and Investec. Holds geology and finance degrees.

Chief Financial Officer of Central Asia Metals plc, appointed to the Board in May 2022 and transitioned to CFO in October 2024. Over 20 years' mining sector experience, including as an equity research analyst at Investec. Holds geology and mining geology degrees.

Technical Director of Central Asia Metals plc. Metallurgist with 45 years' experience in project development and mine operations management. Former Chief Operating Officer of European Minerals Corporation; previous roles at Ashanti Goldfields, Lonrho and Anglo American.

General Director of Kounrad Copper Company, Central Asia Metals plc's Kazakhstan copper operating subsidiary. Engineer and economist who joined CAML in 2014 and progressed from Chief Power Engineer to General Director in 2024.

General Director of Sary Kazna, Central Asia Metals plc's Kazakhstan operating subsidiary. Economist with a degree from the Kazakh State Academy of Management; joined CAML in 2013 and was appointed General Director of Sary Kazna in 2024.

General Director of the Sasa lead-zinc mine, Central Asia Metals plc's North Macedonia operating subsidiary. Mining engineer with over 20 years' experience in gold and base metals; Bachelor of Engineering (Mining), University of Ballarat, Australia.

Insiders, Investors & Smart Money

Notable shareholders and insiders whose involvement is worth knowing about, plus what we're seeing from institutional/large-investor activity.

Smart money
3/10

The one holder here that reads as a real discretionary decision is Man GLG, which crossed 5% and then lifted its position to 6.00% (10,663,676 shares) in July 2026 -- a fund adding rather than trimming. Man GLG is a multi-strategy house rather than a mining specialist, so read it as a considered position rather than a sector expert's call. Barclays at 5.31% is a bank line and Allan Gray at 3.89% is a generalist value manager. Institutional ownership is 65.6%, but no producer or resource specialist appears on the register.

No notable insiders tracked for this miner yet.

Reports, Presentations & Documents

Technical Report Takeaways

Kounrad copper operation (Kazakhstan, dump-leach SX-EW, wholly owned): updated JORC (2012) Mineral Resource and Ore Reserve estimate, effective 31 Dec 2025, prepared by SLR Consulting (UK) Ltd and released 5 Aug 2026 (commissioned ahead of CAML's proposed Cygnus Metals acquisition) -- Indicated Resource / Probable Reserve of 595.1 Mt at 0.07% Cu for 407.9 kt contained copper (all waste dumps now classified Indicated following further drilling/metallurgical testwork confirming dump-leach amenability; no Measured/Inferred/Proved reported). Operations expected to continue to expiry of the current licence in 2034, with 74,459 t of copper cathode to be produced 2026-34 -- a 9-year mine life from this pass's Aug 2026 reference point. 2026 guidance unchanged at 12,000-13,000 t Cu. Sasa (North Macedonia, zinc-lead-silver, wholly owned, same effective date): Indicated 11.4 Mt (4.2% Pb/2.8% Zn/29.8 g/t Ag) + Inferred 9.1 Mt; Probable Ore Reserve of 6.9 Mt at 3.5% Pb/2.5% Zn/26.1 g/t Ag (Svinja Reka deposit only; Golema Reka carries no reserve), current LoM plan 'approximately nine years' (2026-2034) -- corroborates the Kounrad mine-life figure independently. The RNS states 'a financial model for the LoM showed the Ore Reserves to be economic' but discloses no quantified NPV/IRR for either asset -- dcfNpvUsd/irrPct left null rather than estimated. ouncesFound left null: both Kounrad (Cu) and Sasa (Pb-Zn-Ag) resources are reported in tonnes/grade%, not troy ounces -- copper-commodity convention, see this batch's file header.

AI take

Kounrad SX-EW copper operation (Kazakhstan, producing since 2012) + Sasa zinc-lead-silver mine (North Macedonia) + Antler copper project (Arizona, acquired 2025). 2026 guidance: Kounrad 12-13kt Cu cathode; Sasa 18-20kt Zn + 26-28kt Pb in concentrate. No unified group-level NPV/IRR/mine-life DCF figure -- CAML reports per-operation reserve depletion/guidance, not a PEA-style study. ouncesFound not written -- copper/polymetallic-commodity convention gap.