JUNIORMETRICS
Gold$4,479.95/oz
Silver$66.98/oz
Copper$6.00/lb

B2Gold Corp.

BTG·BTO·B2GNamibian Stock Exchange·$5.69·$5.5B cap
GoldFekola Gold Mine, Kayes Region, Mali Map

B2Gold is a multi-mine, mid-tier gold producer headquartered in Vancouver, Canada, operating four gold mines: Fekola (Mali, its flagship and largest producer), Otjikoto (Namibia), Masbate (Philippines, producing since 2008), and Goose (Back River district, Nunavut, Canada -- B2Gold's newest mine, first gold pour ~30 Jun 2025, commercial production declared 2 Oct 2025, acquired via the 2023 Sabina Gold & Silver acquisition). FY2025 revenue was a record US$3.06 billion on 979,604 oz produced at an AISC of US$1,584/oz. B2Gold also holds a fully-permitted-track feasibility-stage growth project at Gramalote, Colombia (JV with AngloGold Ashanti; FS completed Jul 2025) and the Fekola Regional satellite deposits in Mali, both outside this record's flagship-only fields. Founder Clive T. Johnson retired as President, CEO and Director effective 4 Jun 2026 after nearly two decades leading the company, becoming Chair Emeritus; Mike Cinnamond (previously SVP Finance & CFO) succeeded him as President and CEO.

Notable vs. Peers

  • Jurisdiction risk score of 3/10 is meaningfully riskier than the peer average of 7.8/10.

Lifecycle Milestones

Grassroots
Resource Def.
PEA
PFS
Feasibility
Permitting
Construction
ProductionCurrent

Construction Milestones

5 of 5 reached
  1. Nov 2018 · Type A Water Licence for the Back River (Goose) Gold Project, Nunavut -- the primary construction-enabling permit -- granted 14 Nov 2018 by the Nunavut Water Board, while the project was still owned by Sabina Gold & Silver Corp. (acquired by B2Gold in 2023). Date sourced from secondary/aggregated coverage this pass, not a primary regulator filing directly re-confirmed -- flagged for a future pass to firm up against the Nunavut Water Board record if a discrepancy ever surfaces.
  2. Reached — date not disclosed · B2Gold's 2023 acquisition of Sabina Gold & Silver Corp. (owner of the fully-permitted, 'shovel-ready' Back River/Goose project) functioned as B2Gold's own construction/production decision for Goose. A discrete board-decision date distinct from the acquisition itself was not confirmed against a primary source this pass -- left null rather than guessed.
  3. Reached — date not disclosed · Construction at Goose was underway through 2023-2024, with B2Gold's own FY2025 results release stating all planned 2024 construction activities were completed on schedule ahead of the 2025 first gold pour. A specific construction-commencement date was not confirmed against a primary source this pass -- left null rather than guessed. · Source
  4. Jun 2025 · First gold pour at Goose reported on/around 30 Jun 2025 per aggregated secondary coverage (exact primary-source URL not confirmed this pass). B2Gold's own FY2025/Q4 2025 results release (cited here) confirms Goose went on to achieve commercial production 2 Oct 2025, which necessarily post-dates first production -- corroborating that first production had genuinely occurred by then. · Source
  5. Reached — date not disclosed · Genuinely reached, but no single company-wide commercial-production date exists across a multi-mine portfolio built over a decade-plus: Otjikoto (Namibia, producing since 2015), Masbate (Philippines, producing since a 2013 acquisition), Fekola (Mali, commercial production since November 2017), and Goose (Nunavut, Canada -- the newest, commercial production declared 2025-10-02). B2Gold reported Q2 2026 results (released 2026-08-06) with 203,648 oz of consolidated gold production across all four operating mines, confirming active, ongoing commercial gold production. This row was missing entirely prior to 2026-08-21 -- a genuine data gap (row presence is the signal per this model's doc comment), not a stage error; Miner.stage was already correctly PRODUCTION. Same pattern as AEM and the other five gap tickers fixed in this same batch (ABX, NEM, AGI, EQX, AAUC). · Source

Milestones are recorded only from a company's own dated disclosure. A milestone with no date shown is one we can confirm was reached but for which no date was disclosed — we don't estimate one. "Not yet reached" means exactly that, not that a date is missing. An "Expected" line likewise only ever reflects the company's own guidance (e.g. a study or permit decision targeted for a stated quarter) — most not-yet-reached milestones have none, and that absence means no such guidance has been disclosed, not that one is overdue.

Combined view across 5 projects. Figures below are only combined where the underlying basis genuinely matches -- see the notes under each.

Combined resource
No project has a disclosed resource figure yet
IRR
Not combined
IRR is not additive across independent projects -- see each project's own tab for its figure
Combined NPV, by discount-rate basis
$2.9B
At rate not disclosed discount rate -- Fekola + Otjikoto + Goose + Gramalote
10/10
Weak track recordStrong track record
5.3/10
Thin runwayWell-capitalized
3/10
High riskLow risk
How this is calculated
5.6/10
Weaker depositStronger deposit
6/10
Weaker profileStronger profile
Price Chart
$3.78$3.99$6.21$4.58$5.69AugNovFebJunSep36
Aug 12, 2025Sep 4, 2026
News
$5.69
+67.4%from low-8.7%from high
$3.40$6.23
$5.5B
Far belowFar above
$557.1M median
Price (USD - Local)
$5.69
Cash Position (USD)
$479M
Far belowFar above
$90.6M median
Debt (USD)
$520M
Far aboveFar below
$5.7M median
$5.5B
Far belowFar above
$486M median
1.3B
Far aboveFar below
303M median
Jurisdiction
Mali
2,700,000 oz
Far belowFar above
1.3M median
$2,033.70/oz
Far aboveFar below
$157.18/oz median
Cut-off: 0.65 g/t Au (open pit Mineral Reserve cut-off); 2.35 g/t Au (underground Mineral Reserve cut-off)
This company's data hasn't been researched yet
Open pit and underground
See projects ↓
This company's data hasn't been researched yet
$1,964/oz
See projects ↓
This company's data hasn't been researched yet
See projects ↓
Not enough peer data yet
This company's data hasn't been researched yet
Not enough peer data yet
See projects ↓
This company's data hasn't been researched yet
This company's data hasn't been researched yet
66.7%
0%100%
3% median
61 kmfrom Barrick Mining Corporation (80%, via SOMILO SA / Societe des Mines de Gounkoto SA) / Government of Mali (20%)'s Loulo-Gounkoto
Outside typical bolt-on range
$362M
Far belowFar above
$36.1M median
$0.27
Far belowFar above
$0.146 median
15.06x
Far aboveFar below
23.23x median
$436.1M
Far belowFar above
$524.2M median
$0.325
Far belowFar above
$2.11 median
Acquisition Susceptibility
5.2/10
Unlikely bolt-onFits the takeout profile

A relative ranking of how closely this company matches the profile of juniors that have actually been acquired — not a probability, and not a reason to buy. Acquisitions are rare: only a few dozen significant deals happen a year across a universe of thousands of juniors, so even a high score here describes a long shot. The strongest signal the underlying research identifies — whether a major already holds a JV, earn-in, or 5–19.9% strategic stake — isn't tracked yet and is absent from this score.

Overall Score Trend
+13.2% since 2026-08-07

Your Rankings

Community Sentiment
100SELLINGBUYING
CategoryCommunityYour Ranking
Overall (0)Log in to rank
Management (0)Log in to rank
Financials (0)Log in to rank
Jurisdiction (0)Log in to rank
Project Quality (0)Log in to rank

Management Team

President and CEO of B2Gold Corp. since 4 Jun 2026, succeeding founder Clive T. Johnson under a leadership succession plan announced 23 Feb 2026. Previously Senior Vice President, Finance and Chief Financial Officer of B2Gold.

Senior Vice President, Chief Financial Officer of B2Gold Corp., appointed following Mike Cinnamond's promotion to President and CEO in Jun 2026.

Insiders, Investors & Smart Money

Notable shareholders and insiders whose involvement is worth knowing about, plus what we're seeing from institutional/large-investor activity.

Smart money

Task #172 gate batch: smartMoneyScore rubric (playbook §7.6) applied 2026-08-15 -- GATED: marketCapUsd $5.45B >= $5.0B applicability threshold. At this size, index membership (GDX, S&P/TSX 60, Russell 1000) mechanically dominates the shareholder register, so absence of a visible specialist bet carries no information. RESEARCHED_UNKNOWN per playbook §6.4/§7.6.

No notable insiders tracked for this miner yet.

Reports, Presentations & Documents

Technical Report Takeaways

B2Gold operates three other producing mines beyond flagship Fekola (Mali), not yet representable in single-project fields pending Task #347: Otjikoto (Namibia; 2026 guidance 70,000-90,000 oz as the open pit completes, with the Antelope satellite deposit expected to add ~65,000 oz/yr for a 5-year window, 2029-2032); Masbate (Philippines; producing since 2008, 2026 guidance 170,000-190,000 oz); and Goose (Back River district, Nunavut, Canada -- B2Gold's newest mine, acquired via the 2023 Sabina Gold & Silver acquisition, first gold pour ~30 Jun 2025, commercial production declared 2 Oct 2025, 2026 guidance 170,000-230,000 oz, ramping toward 300,000+ oz/yr from 2027). Separately, B2Gold holds a feasibility-stage growth project at Gramalote, Colombia (JV with AngloGold Ashanti): FS completed Jul 2025 outlining an 11-year open-pit mine life, ~177,000 oz/yr life-of-mine average production, AISC US$985/oz at a US$2,500/oz gold price assumption -- real, current DCF-grade economics, but for a different project/country than Fekola, so deliberately not written into this record's dcfNpvUsd/irrPct/mineLifeYears fields (which are reserved for Fekola per this record's single-project convention). Also note: the task brief that prompted this seed described a third mine as 'Toega/Philippines' -- confirmed incorrect against B2Gold's own site; see this script's file header for the correction.

Recent News