UraniumSalamanca Uranium Project, Salamanca Province, Spain Map

Rather than a live, advancing permitting process, the company's principal activity since has been an ICSID (International Centre for Settlement of Investment Disputes, part of the World Bank Group) investor-state arbitration claim against the Kingdom of Spain: a request for arbitration was filed May 2024 initially seeking ~US$1 billion in damages, escalated to a Memorial of Claim seeking ~US$1.25 billion filed Feb 2026 by its subsidiary Berkeley Exploration Limited, with the Tribunal since agreeing to bifurcate proceedings into a jurisdictional-objections phase before reaching the merits. Spain had until Jul 2026 to respond to the memorial. The company remains well-funded to pursue this (A$62 million cash, no debt, as at the Jun 2026 quarter) but is not, in any practical sense, currently developing a mine -- roughly A$1.835 million of a A$2.815 million Mar-2026-quarter operating cash outflow went directly to arbitration costs, versus only A$759,000 on exploration/evaluation.

Notable vs. Peers

  • Jurisdiction risk score of 5/10 is meaningfully riskier than the peer average of 7.9/10.
  • Financials score of 8.4/10 is stronger than the peer average of 5.7/10.

Lifecycle Milestones

Grassroots
Resource Def.
PEA
PFS
Feasibility
PermittingCurrent
Construction
Production

Construction Milestones

0 of 5 reached
  1. Not yet reached
  2. Not yet reached
  3. Not yet reached
  4. Not yet reached
  5. Not yet reached

Milestones are recorded only from a company's own dated disclosure. A milestone with no date shown is one we can confirm was reached but for which no date was disclosed — we don't estimate one. "Not yet reached" means exactly that, not that a date is missing. An "Expected" line likewise only ever reflects the company's own guidance (e.g. a study or permit decision targeted for a stated quarter) — most not-yet-reached milestones have none, and that absence means no such guidance has been disclosed, not that one is overdue.

6.7/10
Weak track recordStrong track record
6.7/10 vs.
8.4/10
Thin runwayWell-capitalized
8.4/10 vs.
How this is calculated
5.1/10
Weaker depositStronger deposit
5.1/10 vs.
How this is calculated
5/10
Harder place to buildEasier place to build
5/10 vs.
What goes into it
  • Jurisdiction (40%)5/10

    The risk is two-layered: Spain/the EU is an excellent baseline sovereign jurisdiction on nearly any general measure (rule of law, property rights, capital markets access), but this specific project has a crystallised, severe, project-level political/regulatory risk that a general-country score would understate -- Spain's Nuclear Safety Council (CSN) delivered an unfavourable technical report in 2021, the energy ministry (MITECO) refused final construction authorisation, and that refusal was reaffirmed on appeal in 2023, despite the project having accumulated over 120 European/national permits beforehand and a completed, bankable-grade 2016 DFS. The company is now pursuing an ICSID investor-state arbitration claim (~US$1.25 billion, filed as a Memorial of Claim Feb 2026, bifurcated into a jurisdictional phase) against the Kingdom of Spain itself -- the single clearest possible signal that ordinary in-country permitting/political-risk channels have already been exhausted and failed for this specific project. Scored well below what Spain/EU's general sovereign quality alone would suggest, specifically because of this project's own, already-realised (not merely hypothetical) regulatory blockage.

  • Infrastructure (40%)No verified figure

    Researched with nothing found: no source we could cite confirms or rules out an existing mill, road access, grid power, or tailings facility at Salamanca Uranium Project (Retortillo, Zona 7, Alameda deposits), Salamanca Province, Spain (checked Sep 30, 2026; recheck due Mar 29, 2027). Counts at a neutral 5/10 until one does.

  • Nearby producing mine (20%)Not yet researched

    No project coordinates on file yet, so distance to a producing mine can't be measured.

6.3/10
Weaker profileStronger profile
6.3/10 vs.
Price Chart
$0.381$0.352$0.319$0.359$0.525AugDecAprJulOct
Aug 26, 2025 – Oct 20, 2026
$0.51
+95.7%from low-20.8%from high
$0.26$0.64
$227M
Far belowFar above
$227M vs. $16.1M peer median
Price (USD - Local)
US$0.51 (AUD 0.73)
Cash Position (USD)
$43.2M
Far belowFar above
$43.2M vs. $6.4M peer median
Debt (USD)
Far aboveFar below
$0 vs. $0 peer median
$183.8M
Far belowFar above
$183.8M vs. $12.9M peer median
446.3M
Far aboveFar below
446.3M vs. 138.4M peer median
Jurisdiction
Spain
59,800,000 lb U₃O₈
Feeds Deposit Quality score
Measured12,300,000 lb U₃O₈
Indicated47,500,000 lb U₃O₈
Inferrednot scored29,600,000 lb U₃O₈
Total resource89,400,000 lb U₃O₈
Far belowFar above
59.8M lb vs. 40M lb peer median
Compares M&I only — Inferred isn't compared or scored.
$3.07/lb
M&I
Total resource (incl. Inferred)$2.06/lb
Peer median $2.91/lb
Far aboveFar below
$3.07/lb vs. $4.02/lb peer median
Cut-off: 200 ppm U3O8 (global Mineral Resource cut-off)
Open pit, per the 2016 DFS design specification -- construction has never been authorised, so this describes the study's planned method, not an as-built mine
14 yrs2016 study
Far belowFar above
14 yrs vs. 15 yrs peer median
$531.9M2016 study · uranium deck US$65.00 vs reference US$69.23/lb
Far belowFar above
$531.9M vs. $499M peer median
0.43x2016 study · uranium deck US$65.00 vs reference US$69.23/lb
Far aboveFar below
0.43x vs. 0.30x peer median
0.35x2016 study · uranium deck US$65.00 vs reference US$69.23/lb
Far aboveFar below
0.35x vs. 0.22x peer median
$96M2016 study
Far aboveFar below
$96M vs. $256M peer median
5.5xClears Durrett's 2:1 bar2016 study · uranium deck US$65.00 vs reference US$69.23/lb
Far belowFar above
5.5x vs. 1.4x peer median
$65.00/lb6% below reference ($69.23/lb)2016 study
60%Clears Durrett's 25% developer bar2016 study · uranium deck US$65.00 vs reference US$69.23/lb
Far belowFar above
60% vs. 33% peer median
-$5.4M
Far belowFar above
-$5.4M vs. -$6.6M peer median
-$0.012
Far belowFar above
-$0.012 vs. -$0.024 peer median

Acquisition Susceptibility

How this is calculated
7.7/10
Unlikely bolt-onFits the takeout profile

A relative ranking of how closely this company matches the profile of juniors that have actually been acquired — not a probability, and not a reason to buy. Acquisitions are rare: only a few dozen significant deals happen a year across a universe of thousands of juniors, so even a high score here describes a long shot. The strongest signal in the research, a producer that already owns part of the company, is scored from its disclosed strategic shareholders. A producer that is a joint-venture or earn-in partner on the project, rather than a shareholder, isn't captured yet.

How this score is built

  • Disclosed pending deal
    Sub-score: Not scored

    No pending acquisition or merger disclosed (checked)

    Not scored: having no deal in flight isn't held against a company.

    Weight 26.25%
  • Producer's strategic stake
    Sub-score: Not yet researched

    Holder register not researched yet

    Not scored: most juniors that do get bought had no prior toehold, so a missing stake says little either way.

    Weight 25%
  • Distance to a producing mine
    Sub-score: Not yet researched

    Distance not yet researched: no project coordinates on file

    Distance can't be measured without coordinates, so excluded rather than counted as far.

    Weight 22.5%
  • Lifecycle stage
    Sub-score:
    10/10

    Stage: Permitting

    Feasibility and permitting score 10, where deals cluster, and production 5.5; earlier stages score less, down to 1 at grassroots.

    Weight 15% · 57% here
  • Jurisdiction
    Sub-score:
    5/10

    Spain: jurisdiction score 5/10

    Our jurisdiction score, used as is: higher means lower political and permitting risk.

    Weight 6.75% · 26% here
  • Commodity
    Sub-score:
    4/10

    Primary commodity: Uranium

    Gold 10, copper 8, silver 5, nickel and uranium 4, others 2: most majors' deals are for gold.

    Weight 4.5% · 17% here

Weight is each input's share of the full score. “Here” is its share of this company's score: inputs that aren't scored are left out and the rest re-weighted, never counted as zero.

Overall Score Trend
-24.1% since 2026-08-26 · -24.1% from peak

Your Rankings

Community Sentiment
—SELLINGBUYING
CategoryCommunityYour Ranking
Overall— (0) 
Management— (0) 
Financials— (0) 
Jurisdiction— (0) 
Project Quality— (0) 

Management Team

Acting Managing Director of Berkeley Energia Limited and a non-executive director of Apollo Minerals Limited and Constellation Resources Limited. Geologist with 30+ years in international mining; former MD of Mantra Resources and Papillon Resources; Fellow of the Australian Institute of Mining and Metallurgy.

Chairman of GreenX Metals Limited; also Chairman of Berkeley Energia Limited and Apollo Minerals Limited and Non-Executive Chairman of Constellation Resources Limited. Chartered Accountant with a Bachelor of Commerce degree. Worked for a large international chartered-accounting firm before joining the Normandy Mining Group, where he was a senior group executive for approximately 10 years. Currently a director of multiple publicly listed resources companies.

Mining engineer with 25+ years of experience; safety and occupational-health specialist; involved in construction and commissioning of multiple mines across Spain, South America, and Mauritania.

Insiders, Investors & Smart Money

Notable shareholders and insiders whose involvement is worth knowing about, plus what we're seeing from institutional/large-investor activity.

Smart money

No smart-money tracking (institutional/large-investor activity) for this miner yet — this is a planned feature, not live data.

No notable insiders tracked for this miner yet.

Reports, Presentations & Documents

Technical Report Takeaways

Berkeley Energia's sole material asset is the 100%-owned Salamanca uranium project in western Spain, where a definitive feasibility study was completed in July 2016 but construction has been blocked: Spain's Nuclear Safety Council issued an unfavourable report in 2021 and the energy ministry refused the final construction authorisation, a refusal reaffirmed on appeal in 2023. Measured and indicated resources at the Retortillo, Zona 7 and Alameda deposits contain 59,800,000 lb of U3O8 (12,300,000 lb measured and 47,500,000 lb indicated), plus 29,600,000 lb inferred, unchanged since that study. The 2016 study showed an NPV8% of US$531.9M and a 60% IRR at a long-term uranium price of US$65/lb, with initial capital of US$96M and a 14-year mine life. The company's main activity is now an ICSID investment-treaty claim against Spain, filed in May 2024, in which its Memorial of Claim of February 2026 seeks about US$1.25B and the tribunal is hearing Spain's jurisdictional objections first. In July 2026 it also reported a maiden inferred resource of 11.8 Mt at 0.41% Li2O and 0.21% Rb2O at its Conchas lithium-rubidium project in Spain.