JUNIORMETRICS

Batero Gold Corp.

BELDF·BAT·US$0.071 (CAD 0.10)·US$8.2M cap
GoldBatero-Quinchia Gold Project / La Cumbre Deposit (Risaralda, Colombia) Map

Batero Gold Corp. (TSXV: BAT) is an exploration and development company focused on the 100%-owned Batero-Quinchia gold project in Colombia's Mid Cauca gold belt, Department of Risaralda, which covers 1,407 hectares of tenements plus a further concession application. Its La Cumbre deposit carries an NI 43-101 Mineral Resource, effective 15 September 2022, of 135.7 Mt Measured and Indicated at 0.503 g/t Au for about 2.2 million oz, plus about 12,000 oz Inferred, and a preliminary economic assessment of an open-pit operation over a 14-year mine life at US$1,750/oz gold, both prepared by Linares Americas Consulting. The original 2022 technical report was found non-compliant in a British Columbia Securities Commission review and its disclosure was retracted in December 2022; an amended and restated report, dated 25 September 2023, replaced it with no material change to the estimates or the economics. Batero is working through Colombia's prior-consultation process with the Embera Karamba community ahead of updating its environmental impact assessment.

Notable vs. Peers

  • Financials score of 1.3/10 is weaker than the peer average of 5.3/10.
  • Jurisdiction risk score of 5/10 is meaningfully riskier than the peer average of 7.8/10.

Lifecycle Milestones

Grassroots
Resource Def.
PEACurrent
PFS
Feasibility
Permitting
Construction
Production
Prior Ownership & Infrastructure
Road Access1 of 4 checked, 1 in place

Not yet determined: mill, tailings facility, grid power.

5.2/10
Weak track recordStrong track record
5.2/10 vs.
1.3/10
Thin runwayWell-capitalized
1.3/10 vs.
How this is calculated
5.3/10
Weaker depositStronger deposit
5.3/10 vs.
How this is calculated
6.6/10
Harder place to buildEasier place to build
6.6/10 vs.
What goes into it
  • Jurisdiction (40%)5/10

    Colombia (Department of Risaralda, Mid Cauca gold belt) -- workable but higher-risk jurisdiction than North America/Australia peers (permitting, security and community-relations track record).

  • Infrastructure (40%)6.4/10

    Confirmed road access at La Cumbre Gold Project (Batero-Quinchia), Risaralda, Colombia; existing mill, grid power, and tailings facility not yet researched, counted at a neutral 5/10 until established.

  • Nearby producing mine (20%)9.9/10

    Marmato Upper Mine (Zona Alta) (Aris Mining Corporation) is 21 km away -- within regional-platform range.

4.6/10
Weaker profileStronger profile
4.6/10 vs.
Price Chart
$0.043$0.057$0.093$0.072$0.071AugDecMarJulOct
Aug 12, 2025 – Oct 20, 2026
Stage changeNews
$0.071
+102.6%from low-66.2%from high
$0.035$0.21
See who ↓
28.7%
Low alignmentHigh alignment
28.7% vs.
See who ↓
0%
Low alignmentHigh alignment
0% vs.
$8.2M
Far belowFar above
$8.2M vs. $22.1M peer median
Price (USD - Local)
US$0.071 (CAD 0.10)
Cash Position (USD)
$178.5K
Far belowFar above
$178.5K vs. $3.4M peer median
Debt (USD)
$2M
Far aboveFar below
$2M vs. $0 peer median
$10.1M
Far belowFar above
$10.1M vs. $19.4M peer median
115.2M
Far aboveFar below
115.2M vs. 154.2M peer median
Jurisdiction
Colombia
2,195,125 oz
Feeds Deposit Quality score
Measured2,117,649 oz
Indicated77,476 oz
Inferrednot scored12,005 oz
Total resource2,207,130 oz
Far belowFar above
2.2M oz vs. 1.3M oz peer median
Compares M&I only — Inferred isn't compared or scored.
$4.58/oz
M&I
Total resource (incl. Inferred)$4.55/oz
Peer median $69.13/oz
Far aboveFar below
$4.58/oz vs. $133.23/oz peer median
0.0147 oz/tCut-off: 0.218 g/t Au (oxide/transitional); 0.179 g/t Au (primary/sulphide)
Far belowFar above
0.0147 oz/t vs. 0.0383 oz/t peer median
Open pit (planned in the 2022 preliminary economic assessment)
14 yrs2022 study
Far belowFar above
14 yrs vs. 11.1 yrs peer median
$771/oz2022 study
@5%$480.6M2022 study · gold deck US$1,750 vs spot US$4,114/oz
Far belowFar above
$480.6M vs. $603M peer median
0.02x2022 study · gold deck US$1,750 vs spot US$4,114/oz
Far aboveFar below
0.02x vs. 0.32x peer median
0.02x2022 study · gold deck US$1,750 vs spot US$4,114/oz
Far aboveFar below
0.02x vs. 0.30x peer median
$169.5M2022 study
Far aboveFar below
$169.5M vs. $293.2M peer median
2.8xClears Durrett's 2:1 bar2022 study · gold deck US$1,750 vs spot US$4,114/oz
Far belowFar above
2.8x vs. 2.3x peer median
$1,750/oz57% below spot ($4,114/oz)2022 study
32%Clears Durrett's 25% developer bar2022 study · gold deck US$1,750 vs spot US$4,114/oz
Far belowFar above
32% vs. 43% peer median
28.7%
0%100%
28.7% vs. 12.1% peer median
0%
0%100%
0% vs. 3.3% peer median
21 kmfrom Aris Mining Corporation's Marmato Upper Mine (Zona Alta)
Within regional-platform range (~50km)
-$521.6K
Far belowFar above
-$521.6K vs. -$3.3M peer median
-$0.005
Far belowFar above
-$0.005 vs. -$0.018 peer median

Acquisition Susceptibility

How this is calculated
7.1/10
Unlikely bolt-onFits the takeout profile

A relative ranking of how closely this company matches the profile of juniors that have actually been acquired — not a probability, and not a reason to buy. Acquisitions are rare: only a few dozen significant deals happen a year across a universe of thousands of juniors, so even a high score here describes a long shot. The strongest signal in the research, a producer that already owns part of the company, is scored from its disclosed strategic shareholders. A producer that is a joint-venture or earn-in partner on the project, rather than a shareholder, isn't captured yet.

How this score is built

  • Disclosed pending deal
    Sub-score: Not scored

    No pending acquisition or merger disclosed (checked)

    Not scored: having no deal in flight isn't held against a company.

    Weight 26.25%
  • Producer's strategic stake
    Sub-score: Not scored

    No producer holds a disclosed stake on file (holder register researched) See holders

    Not scored: most juniors that do get bought had no prior toehold, so a missing stake says little either way.

    Weight 25%
  • Distance to a producing mine
    Sub-score:
    7.9/10

    Nearest producing mine: Marmato Upper Mine (Zona Alta) (Aris Mining Corporation), 21 km

    10 next to a producing mine, 8 at 20 km, 5 at 50 km, 0 beyond 200 km.

    Weight 22.5% · 46% here
  • Lifecycle stage
    Sub-score:
    6/10

    Stage: Preliminary Economic Assessment

    Feasibility and permitting score 10, where deals cluster, and production 5.5; earlier stages score less, down to 1 at grassroots.

    Weight 15% · 31% here
  • Jurisdiction
    Sub-score:
    5/10

    Colombia: jurisdiction score 5/10

    Our jurisdiction score, used as is: higher means lower political and permitting risk.

    Weight 6.75% · 14% here
  • Commodity
    Sub-score:
    10/10

    Primary commodity: Gold

    Gold 10, copper 8, silver 5, nickel and uranium 4, others 2: most majors' deals are for gold.

    Weight 4.5% · 9% here

Weight is each input's share of the full score. “Here” is its share of this company's score: inputs that aren't scored are left out and the rest re-weighted, never counted as zero.

Risk/Reward Asymmetry
0.02x EV/NPV2022 study· 5th percentile of 42 stage+commodity peers· Known risk: jurisdiction

EV/NPV of 0.02x sits in the 5th percentile among 42 pea-stage gold peers ranked on EV/NPV -- and its jurisdiction score of 5/10 is low enough to plausibly explain much of that discount: a known, identifiable risk the market may be pricing correctly today. This is the headline Risk/Reward Asymmetry pattern this screen looks for -- a specific risk (e.g. a permitting dispute or comparable jurisdiction issue) that, if it resolves favorably, could re-rate the stock sharply. A mechanical screen only: this does not by itself confirm there IS a resolvable catalyst, or that it resolves favorably -- see this company's own profile page for any completed, cited research into why it trades at a discount, where that research exists.

No researched, cited finding on file yet for what specifically makes this company cheap vs. its peers. Flagged by the mechanical screen above; a real research pass hasn't reached this company yet.

A relative screen, not a probability and not a reason to buy. This flags companies trading unusually cheap on EV/NPV (market cap plus debt minus cash, per dollar of attributable study NPV) vs. peers of the same lifecycle stage and commodity, for a real, identifiable reason (a jurisdiction risk, a specific dispute, an incident, a financing gap) that may or may not ever resolve favorably. "Unexplained" candidates carry no identified driver at all -- a more speculative bucket than a named catalyst. The year chip is the study behind the NPV; amber means it is more than 5 years old (still the study on file, so it stays in this screen).

Overall Score Trend
-22% since 2026-08-19 · -36.1% from peak

Your Rankings

Community Sentiment
—SELLINGBUYING
CategoryCommunityYour Ranking
Overall— (0) 
Management— (0) 
Financials— (0) 
Jurisdiction— (0) 
Project Quality— (0) 

Management Team

Chief Executive Officer and Director of Batero Gold Corp., appointed May 2, 2025, succeeding Gonzalo de Losada. Advancing the La Cumbre Gold Project within the company's 100%-owned Batero-Quinchia Gold Project in Risaralda, Colombia. Also a director of Antioquia Gold Inc. and former CEO, now director, of Grupo HNG, a Peruvian business group.

Chief Financial Officer and Corporate Secretary of Batero Gold Corp., appointed May 2, 2025, succeeding Ivo Bravo.

Insiders, Investors & Smart Money

Notable shareholders and insiders whose involvement is worth knowing about, plus what we're seeing from institutional/large-investor activity.

Smart money
1/10

Two Colombian/Peruvian mining groups (Consorcio Minero Horizonte, Consorcio Minero Unido) took large strategic stakes in Batero over a decade ago, but neither appears anywhere in the company's current shareholder data, which instead shows a different individual as the largest holder -- these legacy stakes have clearly since been superseded. No insider buying or selling was found on record either.

No notable insiders tracked for this miner yet.

Reports, Presentations & Documents

Technical Report Takeaways

Batero Gold is focused on the 100%-owned Batero-Quinchia gold project in Colombia's Mid Cauca gold belt, in the Department of Risaralda. Its La Cumbre deposit carries a resource of 2,195,125 oz of gold measured and indicated, of which 2,117,649 oz is measured and 77,476 oz indicated, plus 12,005 oz inferred, effective 15 September 2022. A preliminary economic assessment in the same amended and restated technical report models an open-pit operation over a 14-year mine life at US$1,750/oz gold. Batero is working through Colombia's prior-consultation process with the Embera Karamba community ahead of updating its environmental impact assessment.