JUNIORMETRICS

Arizona Eagle Mining Corp.A

CNCOF·AZEM·US$0.52 (CAD 0.74)·US$29.6M cap
Goldalso:Eagle Project (McCabe past-producing gold-silver mine + Eagle Silver Project consolidation), Yavapai County, Arizona (100%) Map

Arizona Eagle Mining Corp. (TSXV: AZEM) is a newly-listed (commenced trading 31 Mar 2026) explorer whose flagship Eagle Project is a 4,533-acre property near Prescott Valley, Yavapai County, Arizona (roughly 1.5 hours north of Phoenix, on private ground), anchored by the past-producing high-grade McCabe gold-silver mine. Stan West Mining historically invested more than US$35 million to drill and develop McCabe, publishing a 1984 historic estimate of approximately 878,000 ounces of gold and 5 million ounces of silver to a depth of roughly 440 metres, open in all directions -- this estimate explicitly predates NI 43-101 and is NOT treated as a compliant current resource. A fully-funded Phase 1 drill program is underway. In September 2026 the company agreed to acquire 62 acres of patented land hosting three additional past-producing high-grade silver mines (Arizona National, Lookout, Silver Belt) approximately one kilometre northeast of McCabe, consolidating the district into the 'Eagle Silver Project.'

Lifecycle Milestones

GrassrootsCurrent
Resource Def.
PEA
PFS
Feasibility
Permitting
Construction
Production
Not yet researched
Weak track recordStrong track record
5.9/10
Thin runwayWell-capitalized
5.9/10 vs.
How this is calculated
Not yet researched
Weaker depositStronger deposit
How this is calculated
6.6/10
Harder place to buildEasier place to build
6.6/10 vs.
What goes into it
  • Jurisdiction (40%)9/10

    Arizona: Fraser PPI 2025 is 90.73 of 100 (rank 10 of 68), which maps to 9 on this site's scale. The Eagle project (McCabe mine) is in Yavapai County, Arizona, a top-tier mining jurisdiction with low political risk.

  • Infrastructure (40%)No verified figure

    Researched with nothing found: no source we could cite confirms or rules out an existing mill, road access, grid power, or tailings facility at Eagle Project (McCabe Mine), Yavapai County, Arizona, USA (checked Sep 26, 2026; recheck due Mar 25, 2027). Counts at a neutral 5/10 until one does.

  • Nearby producing mine (20%)Not yet researched

    No project coordinates on file yet, so distance to a producing mine can't be measured.

5.6/10
Weaker profileStronger profile
5.6/10 vs.
Price Chart
$1.00$0.822$0.558$0.522$0.535MarMayJulSepOct
Mar 31, 2026 – Oct 15, 2026
News
$0.52
+60.7%from low-60.1%from high
$0.32$1.31
$29.6M
Far belowFar above
$29.6M vs. $22M peer median
Price (USD - Local)
US$0.52 (CAD 0.74)
Cash Position (USD)
$5.8M
Far belowFar above
$5.8M vs. $3.3M peer median
Debt (USD)
$0
Far aboveFar below
$0 vs. $0 peer median
$23.9M
Far belowFar above
$23.9M vs. $19.4M peer median
56.8M
Far aboveFar below
56.8M vs. 154.5M peer median
Jurisdiction
United States
-$6M
Far belowFar above
-$6M vs. -$3.3M peer median
-$0.105
Far belowFar above
-$0.105 vs. -$0.017 peer median

Acquisition Susceptibility

How this is calculated
4.6/10
Unlikely bolt-onFits the takeout profile

A relative ranking of how closely this company matches the profile of juniors that have actually been acquired — not a probability, and not a reason to buy. Acquisitions are rare: only a few dozen significant deals happen a year across a universe of thousands of juniors, so even a high score here describes a long shot. The strongest signal in the research, a producer that already owns part of the company, is scored from its disclosed strategic shareholders. A producer that is a joint-venture or earn-in partner on the project, rather than a shareholder, isn't captured yet.

How this score is built

  • Disclosed pending deal
    Sub-score: Not scored

    No pending acquisition or merger disclosed (checked)

    Not scored: having no deal in flight isn't held against a company.

    Weight 26.25%
  • Producer's strategic stake
    Sub-score: Not scored

    No producer holds a disclosed stake on file (holder register researched) See holders

    Not scored: most juniors that do get bought had no prior toehold, so a missing stake says little either way.

    Weight 25%
  • Distance to a producing mine
    Sub-score: Not yet researched

    Distance not yet researched: no project coordinates on file

    Distance can't be measured without coordinates, so excluded rather than counted as far.

    Weight 22.5%
  • Lifecycle stage
    Sub-score:
    1/10

    Stage: Grassroots Exploration

    Feasibility and permitting score 10, where deals cluster, and production 5.5; earlier stages score less, down to 1 at grassroots.

    Weight 15% · 57% here
  • Jurisdiction
    Sub-score:
    9/10

    United States: jurisdiction score 9/10

    Our jurisdiction score, used as is: higher means lower political and permitting risk.

    Weight 6.75% · 26% here
  • Commodity
    Sub-score:
    10/10

    Primary commodity: Gold

    Gold 10, copper 8, silver 5, nickel and uranium 4, others 2: most majors' deals are for gold.

    Weight 4.5% · 17% here

Weight is each input's share of the full score. “Here” is its share of this company's score: inputs that aren't scored are left out and the rest re-weighted, never counted as zero.

Overall Score Trend
-41.1% since 2026-09-19 · -41.1% from peak

Your Rankings

Community Sentiment
—SELLINGBUYING
CategoryCommunityYour Ranking
Overall— (0) 
Management— (0) 
Financials— (0) 
Jurisdiction— (0) 
Project Quality— (0) 

Management Team

Executive Chair of Arizona Eagle Mining Corp.

VP Exploration of Arizona Eagle Mining Corp.

Corporate Secretary of Arizona Eagle Mining Corp.

Independent Director of Arizona Eagle Mining Corp., Chair of the Audit Committee.

Independent Director of Arizona Eagle Mining Corp., member of the Audit Committee.

Independent Director of Arizona Eagle Mining Corp.

Chief Financial Officer of Arizona Metals Corp. (TSX: AMC) and of Arizona Eagle Mining Corp. (TSXV: AZEM, effective 25 March 2026). Also a Senior Financial Analyst at Marrelli Support Services Inc. Master of Accounting, University of Waterloo; Canadian CPA; 7 years in public accounting before joining Arizona Metals. Published by Arizona Eagle as "Sung Min (Eric) Myung".

CEO and Director of Arizona Eagle Mining Corp. since 25 March 2026 (following the reverse-takeover transaction of Core Nickel Corp.). Member of the Audit Committee.

Insiders, Investors & Smart Money

Notable shareholders and insiders whose involvement is worth knowing about, plus what we're seeing from institutional/large-investor activity.

Smart money

No smart-money tracking (institutional/large-investor activity) for this miner yet — this is a planned feature, not live data.

No notable insiders tracked for this miner yet.

Reports, Presentations & Documents

Technical Report Takeaways

Arizona Eagle Mining, which began trading on the TSX Venture Exchange on 31 March 2026, is exploring the 100%-owned Eagle project, 4,533 acres of private ground near Prescott Valley in Yavapai County, Arizona, anchored by the past-producing high-grade McCabe gold-silver mine. A previous owner, Stan West Mining, invested more than US$35M in drilling and developing McCabe and published a 1984 historical estimate of about 878,000 oz of gold and 5 million oz of silver, which predates NI 43-101 and is not a current resource. A fully funded Phase 1 drill program is under way, and in September 2026 the company agreed to acquire 62 acres of patented land with three more past-producing silver mines, Arizona National, Lookout and Silver Belt, about one kilometre north-east of McCabe.

Recent News

ExplorationGold MiningMining InfrastructureResource DevelopmentSilver Mining