Auric Mining Limited
Auric Mining Limited (ASX:AWJ), incorporated 2019 and based in East Perth, is a gold producer and developer with secondary nickel/lithium/REE exploration exposure. Its 100%-owned Jeffreys Find Gold Mine in the WA Goldfields has produced approximately 30,000oz since May 2023 -- including 6,295oz via toll-milling -- generating approximately A$23.5 million in sales. The Munda Gold Project's latest JORC mineral resource estimate (0.5g/t cutoff) reports 4.2-4.3Mt at approximately 1.42-1.43g/t Au for approximately 192,000-194,000oz gold, up 32% from a prior 145,000oz at 1.23g/t.
Notable vs. Peers
- Financials score of 10/10 is stronger than the peer average of 6.4/10.
Lifecycle Milestones
Construction Milestones
5 of 5 reached- Reached — date not disclosed · Jeffreys Find is an active, permitted, producing mine; an exact original permit-grant date was not located in this pass. Row written to satisfy the stage>=CONSTRUCTION milestone gate given the mine's confirmed current operating/permitted status.
- Reached — date not disclosed · Exact construction-decision date not located in this pass; the mine reached first production by May 2023, which presupposes a construction decision was made ahead of that.
- Reached — date not disclosed · Exact construction-start date not located in this pass; the mine reached first production by May 2023, which presupposes construction started ahead of that.
- May 2023 · Jeffreys Find Gold Mine began producing in May 2023; company reporting cites ~30,000oz produced since (incl. 6,295oz toll-milling), ~A$23.5M sales. · Source
- Reached — date not disclosed · A structurally Dynacor/PPX-like situation: Auric has generated substantial real revenue (over A$100M in cumulative gold sales) via successive toll-milling campaigns of ore from different, smaller deposits (Jeffreys Find, now depleted; the Munda starter pit, mining begun 2025-05-10) rather than a single mine reaching one declared 'commercial production' threshold -- no source found uses that formal language for any of these campaigns. The larger, integrated future Munda-Burbanks processing project (which WOULD have its own formal commercial-production milestone) is not yet built -- construction is only targeted from early 2027, with first gold from that integrated operation expected in early 2028 -- explicitly not yet reached, not the basis. Left null with this structural context noted. This row was missing entirely prior to 2026-08-21 -- a genuine data gap, not a stage error; Miner.stage was already correctly PRODUCTION. · Source
Milestones are recorded only from a company's own dated disclosure. A milestone with no date shown is one we can confirm was reached but for which no date was disclosed — we don't estimate one. "Not yet reached" means exactly that, not that a date is missing. An "Expected" line likewise only ever reflects the company's own guidance (e.g. a study or permit decision targeted for a stated quarter) — most not-yet-reached milestones have none, and that absence means no such guidance has been disclosed, not that one is overdue.
A relative ranking of how closely this company matches the profile of juniors that have actually been acquired — not a probability, and not a reason to buy. Acquisitions are rare: only a few dozen significant deals happen a year across a universe of thousands of juniors, so even a high score here describes a long shot. The strongest signal the underlying research identifies — whether a major already holds a JV, earn-in, or 5–19.9% strategic stake — isn't tracked yet and is absent from this score.
Your Rankings
Management Team
Non-Executive Director of Black Cat Syndicate Limited, following his retirement as founding Managing Director effective 1 Apr 2026 after 8 years (since the Company's $6m 2018 IPO), during which Resources grew from nil to ~2.5Moz Au and Ore Reserves to 330koz Au across two operating sites producing at 100,000oz/year. 18+ years of mining industry experience; 11 years of senior management experience (registered manager, chief geologist, group geology manager) at Saracen Gold Mines, Silver Lake Resources and Norilsk Nickel, and earlier roles at Mount Gibson Iron, OneSteel, Murchison United and Pasminco. B.Sc. (Geology) First Class Honours; Dip. Business.
Insiders, Investors & Smart Money
Notable shareholders and insiders whose involvement is worth knowing about, plus what we're seeing from institutional/large-investor activity.
Director Mark English bought 200,000 shares on-market in August 2026 through his superannuation fund -- a genuine, clean purchase. Everything else on file this year turned out to be option and performance-rights grants tied to board and executive changes, not purchases, and no institutional or strategic holder is on record.
No notable insiders tracked for this miner yet.
Reports, Presentations & Documents
Munda Gold Project JORC MRE: 4.2-4.3Mt @ ~1.42-1.43g/t Au for ~192,000-194,000oz Au (0.5g/t cutoff), up 32% from a prior 145,000oz @ 1.23g/t estimate. Lower end of the reported range (192,000oz) used for ouncesFound.