JUNIORMETRICS
Gold$4,479.95/oz
Silver$66.98/oz
Copper$6.00/lb

PT Aneka Tambang (Persero) Tbk

ATM·$0.66·$3.2B cap
Nickelalso:Nickel & Gold/Refinery Operations (Nationwide) Map

PT Aneka Tambang (Persero) Tbk (Antam) is Indonesia's largest state-controlled nickel and gold producer, majority-owned via the state mining holding company MIND ID. The company is dual-listed: its primary line is on the Indonesia Stock Exchange (IDX: ANTM), with this ASX listing (ATM) a genuine secondary line. Share price is given as a AUD $0.92-0.98 range across sources (~Aug 6-11 2026); AUD $0.95 is used here as a reasonable midpoint. Shares outstanding (~4.81 billion) is a single-source figure carried at only moderate confidence. Cash and debt are left unstated here: an unverified Rp3,611,348 million debt figure was found but is not confidently sourced in USD this pass, so it is not converted or used.

Notable vs. Peers

  • Jurisdiction risk score of 5/10 is meaningfully riskier than the peer average of 8.1/10.

Lifecycle Milestones

Grassroots
Resource Def.
PEA
PFS
Feasibility
Permitting
Construction
ProductionCurrent

Construction Milestones

5 of 5 reached
  1. Reached — date not disclosed · Antam obtained the "Kuasa Pertambangan Eksploitasi" (Exploitation Mining Authority) covering 4,058 hectares for the Pongkor deposit (West Java) in 1991, following the 15-year exploration campaign that preceded it, per Indonesia's Ministry of Energy and Mineral Resources (ESDM) own minerba.esdm.go.id article. Exact day/month within 1991 not found. Chosen as the anchor asset for ATM's stage=PRODUCTION claim (see this miner's existing COMMERCIAL_PRODUCTION row, which notes no single company-wide date exists for this diversified nickel/gold state-owned miner). · Source
  2. Reached — date not disclosed · Task #922: written as a real, undated MinerConstructionMilestone row (achievedDate intentionally null). PT Aneka Tambang's Pongkor gold deposit (West Java) demonstrably reached a construction decision: mine and infrastructure development started in 1992 following 15 years of geological exploration, and first gold was poured June 1994 (this miner's own FIRST_PRODUCTION row). Consolidating this miner's own constructionMilestone:CONSTRUCTION_DECISION MetricStatus research (Task #672): no discrete, dated board or state approval-to-build event distinct from the 1992 development start was found, for a structural reason rather than a mere search failure -- this is a pre-internet-era approval inside a state-owned enterprise (Antam did not IPO on the Jakarta exchange until 1997), where the decision to develop would have been an internal/ministerial act rather than a disclosed board FID to public shareholders. Recorded as reached-but-undated rather than misdating the 1992 development start into a decision date, per that research's own explicit caution.
  3. Reached — date not disclosed · "Mine and infrastructure development started in 1992 following intensive geological exploration over 15 years" at Pongkor (AusIMM Eighth Underground Operators' Conference paper), directly following the 1991 permit grant (see this miner's PERMIT_GRANTED row). Corroborated by Indonesia's ESDM ministry (minerba.esdm.go.id), which specifically dates a 12.5km access road built with ABRI Masuk Desa military-assisted-development support to 1992, marking the start of infrastructure works. Exact month within 1992 not found. · Source
  4. Jun 1994 · "First gold production was in June 1994" at Pongkor (AusIMM Eighth Underground Operators' Conference paper), from the 500 t/d mill built during the 1992-1994 construction phase (see this miner's CONSTRUCTION_START row). Exact day within June 1994 not found -- day-of-month set to the 1st as a placeholder for month precision only; treat as REACHED-BUT-UNDATED at June 1994, not a confirmed day. · Source
  5. Reached — date not disclosed · Genuinely reached, but no single company-wide commercial-production date exists: Antam is an Indonesian state-owned diversified miner with a multi-decade, multi-commodity operating history spanning nickel ore/ferronickel, gold, bauxite, and coal across numerous sites (Pomalaa, Buli, Tayan, Cibaliung, Pongkor legacy, and others), predating any single trackable milestone. This row was missing entirely prior to 2026-08-21 -- a genuine data gap, not a stage error; Miner.stage was already correctly PRODUCTION. Note: Miner.commodity is tagged NICKEL (Antam's largest single segment) though the company is genuinely multi-commodity, an existing DB categorization not altered by this milestone-only write. · Source

Milestones are recorded only from a company's own dated disclosure. A milestone with no date shown is one we can confirm was reached but for which no date was disclosed — we don't estimate one. "Not yet reached" means exactly that, not that a date is missing. An "Expected" line likewise only ever reflects the company's own guidance (e.g. a study or permit decision targeted for a stated quarter) — most not-yet-reached milestones have none, and that absence means no such guidance has been disclosed, not that one is overdue.

Weak track recordStrong track record
5.6/10
Thin runwayWell-capitalized
5/10
High riskLow risk
How this is calculated
9.9/10
Weaker depositStronger deposit
6.8/10
Weaker profileStronger profile
Price Chart
$0.798$0.688$0.702$0.734$0.663AugNovFebJunSep
Aug 12, 2025Sep 4, 2026
News
$0.66
+18.2%from low-16.3%from high
$0.56$0.79
See who ↓
38.8%
Low alignmentHigh alignment
See who ↓
0%
Low alignmentHigh alignment
$3.2B
Not enough peer companies report this metric
Price (USD - Local)
$0.66 - AUD 0.92
Cash Position (USD)
$533M
Not enough peer companies report this metric
Debt (USD)
$514.9M
Not enough peer companies report this metric
$3.2B
Not enough peer companies report this metric
4.8B
Not enough peer companies report this metric
Jurisdiction
Indonesia
22,819,000 t Ni
Not enough peer companies report this metric
$139.04/t
Not enough peer companies report this metric
Cut-off: 1.8% Ni minimum (high-grade saprolite export ore spec) / 1.2% Ni minimum (low-grade limonite export ore spec) -- MEDIUM confidence, commercial product spec, not a confirmed primary JORC cutoff-grade line item
This company's data hasn't been researched yet
Open pit
This company's data hasn't been researched yet
This company's data hasn't been researched yet
Not enough peer data yet
This company's data hasn't been researched yet
Not enough peer data yet
This company's data hasn't been researched yet
38.8%
0%100%
10.1% median
0%
0%100%
1.9% median
This company's data hasn't been researched yet
This company's data hasn't been researched yet
This company's data hasn't been researched yet
This company's data hasn't been researched yet
This company's data hasn't been researched yet
Acquisition Susceptibility
5.1/10
Unlikely bolt-onFits the takeout profile

A relative ranking of how closely this company matches the profile of juniors that have actually been acquired — not a probability, and not a reason to buy. Acquisitions are rare: only a few dozen significant deals happen a year across a universe of thousands of juniors, so even a high score here describes a long shot. The strongest signal the underlying research identifies — whether a major already holds a JV, earn-in, or 5–19.9% strategic stake — isn't tracked yet and is absent from this score.

Overall Score Trend
+28.3% since 2026-08-12

Your Rankings

Community Sentiment
SELLINGBUYING
CategoryCommunityYour Ranking
Overall (0)Log in to rank
Management (0)Log in to rank
Financials (0)Log in to rank
Jurisdiction (0)Log in to rank
Project Quality (0)Log in to rank

Management Team

President Director of PT Aneka Tambang (Persero) Tbk (Antam), appointed following an Extraordinary General Meeting of Shareholders in December 2025.

Insiders, Investors & Smart Money

Notable shareholders and insiders whose involvement is worth knowing about, plus what we're seeing from institutional/large-investor activity.

Smart money

No smart-money tracking (institutional/large-investor activity) for this miner yet — this is a planned feature, not live data.

No notable insiders tracked for this miner yet.

Reports, Presentations & Documents

Technical Report Takeaways

Multi-asset state-controlled producer (nickel ore + ferronickel, gold, bauxite/alumina) with no company-wide or single-flagship NPV/IRR/mine-life figure disclosed in any annual report -- re-confirmed Task #678, 2026-08-25. [Task #678 correction to the ouncesFound reasoning.] The prior note asserted ANTAM reports gold "in tonnes/grade, never troy oz" and that any oz figure was "a journalist conversion, not ANTAM's own". That is not correct: ANTAM's own FY2024 Annual Report states gold reserves in troy ounces directly -- "total cadangan bijih emas ANTAM mencapai 805 ribu dry metric ton (dmt) bijih emas atau setara 166 ribu troy oz (5,15 ton) logam emas insitu (contained metal)", with resources of 5.58M dmt or 851 thousand troy oz. ouncesFound nonetheless STAYS NULL, for a sounder reason than the one it had: 166 koz is GOLD, and gold is not this row's commodity (NICKEL) nor the bulk of ANTAM's mining business. ANTAM's nickel reserves are 493.91 million wmt of ORE (113.91M limonite + 380.00M saprolite) and bauxite 198.43 million wmt, both ore tonnage with no contained-metal figure given -- units this schema cannot hold, the same iron-ore tonnage exclusion Task #673 recorded for MDX. Writing the gold figure as this nickel company's deposit size would understate it by orders of magnitude and mis-describe what ANTAM actually mines. RELATED BUSINESS-MODEL FINDING, flagged not acted on: ANTAM's gold SEGMENT is largely a merchant refining operation rather than a mining one -- Pongkor produced roughly 1,019 kg (~32.8 koz) in 2024 against total 2024 gold sales of 43,776 kg, and a 2025 disruption disclosure notes Freeport Indonesia's Grasberg Block Cave closure hit "gold purchases by ANTAM amounting to 30 tonnes (66% of total 2025F volumes of 45 tonnes)", i.e. about two-thirds of forecast gold volume is PURCHASED third-party metal refined at Logam Mulia, not mined. Nickel and bauxite remain genuine owner-operator mining. businessModel is left OPERATOR -- the mining majority governs -- but the hybrid is worth recording.