Artemis Gold Inc.
Artemis Gold is a Canadian gold-silver producer operating the Blackwater open-pit mine in central British Columbia, which reached commercial production in May 2025. The company is now executing a major Phase 2 expansion intended to more than double throughput by 2028.
Notable vs. Peers
- All-in sustaining cost of $869/oz is 56% lower than the peer producer average of $1,969/oz.
- Financials score of 4.8/10 is weaker than the peer average of 6.4/10.
Lifecycle Milestones
Construction Milestones
5 of 5 reached- Mar 2023 · BC Mines Act Permit for Blackwater Mine (BC Ministry of Energy, Mines and Low Carbon Innovation) -- the company's own release frames this as the permit enabling major construction activities to commence as planned in Q1 2023. An earlier 'early works' permit (M-246, July 2021) allowed only site preparation, not full mine construction. · Source
- Feb 2022 · No discrete single-day 'board sanctions construction' release found (see script header). Dated to the executed credit-approved commitment letter for $385M project debt financing 'to Develop Blackwater' -- read together with the already-closed Dec 2021 Wheaton silver stream ($141M), this is the point the full construction capital stack was in place. Construction financing decisions of this kind are this company's closest real-world analogue to a formal FID. · Source
- Sep 2022 · 'Artemis Announces Commencement of Site Works at Blackwater' -- major site works began under the 2021 early-works permit, ahead of the March 2023 full Mines Act permit (see PERMIT_GRANTED note; this is a real, sourced instance of construction activity preceding final permitting, not a data error). [Task #697 chronology ruling, 2026-08-25] NOT A DATE ERROR -- confirmed, and now flagged structurally rather than only in prose. Task #696's permit rule flags PERMIT_GRANTED (2023-03-14) as postdating this 2022-09-19 construction start. A prior pass had already adjudicated this and written the answer into both rows: Blackwater's site works began lawfully under an EARLIER early-works permit (M-246, July 2021, site preparation only), while the row in the PERMIT_GRANTED slot holds the later BC Mines Act permit authorising full mine construction. Two sequential permits, one slot -- so the chain reads inverted while every underlying fact is correct and separately sourced. This is a distinct shape from the multi-asset (SBMI) case: one asset, one operator, staged regulatory approvals. Flagged for a reviewed exception (key: PERMIT_GRANTED_AFTER_CONSTRUCTION_START); the remaining PERMIT_GRANTED_AFTER_CONSTRUCTION_DECISION inversion on this ticker is already covered by the rule's conditional-FID expectedGap. Not added to the rules file here because it was under concurrent edit. Do not resolve this by re-dating PERMIT_GRANTED to the July 2021 early-works permit: M-246 did not authorise mine construction, and the Mines Act permit is the meaningful one for every other gate that reads this row. · Source
- Jan 2025 · First gold and silver pour at the Blackwater Mine. · Source
- May 2025 · Commercial production declared at Blackwater, roughly 3 months after the Jan 29, 2025 first pour already on file. · Source
Milestones are recorded only from a company's own dated disclosure. A milestone with no date shown is one we can confirm was reached but for which no date was disclosed — we don't estimate one. "Not yet reached" means exactly that, not that a date is missing. An "Expected" line likewise only ever reflects the company's own guidance (e.g. a study or permit decision targeted for a stated quarter) — most not-yet-reached milestones have none, and that absence means no such guidance has been disclosed, not that one is overdue.
A relative ranking of how closely this company matches the profile of juniors that have actually been acquired — not a probability, and not a reason to buy. Acquisitions are rare: only a few dozen significant deals happen a year across a universe of thousands of juniors, so even a high score here describes a long shot. The strongest signal the underlying research identifies — whether a major already holds a JV, earn-in, or 5–19.9% strategic stake — isn't tracked yet and is absent from this score.
Your Rankings
Management Team
Veteran mining executive with over three decades of leadership experience; founded Artemis Gold and previously served as President of Teck Cominco Limited.
Mining engineer with 30+ years of international experience; joined Artemis as CEO in June 2025 after having served as a non-executive director since 2023.
Appointed COO of Artemis Gold effective January 2021 and added the title of President in January 2023, leading the Blackwater mine project through construction to first gold pour in Q1 2025. Previously COO of Centamin plc, and before that COO & Executive VP of Construction and Technical Services at Endeavour Mining, where he led development of the Agbaou and Ity mines in Côte d'Ivoire and the Houndé and Nzema projects in Burkina Faso/Ghana. Began his career as a Royal Australian Navy engineer and holds an Honours degree in Mechanical Engineering (FAusIMM).
Insiders, Investors & Smart Money
Notable shareholders and insiders whose involvement is worth knowing about, plus what we're seeing from institutional/large-investor activity.
Task #172 gate batch: smartMoneyScore rubric (playbook §7.6) applied 2026-08-15 -- GATED: marketCapUsd $5.47B >= $5.0B applicability threshold. At this size, index membership (GDX, S&P/TSX 60, Russell 1000) mechanically dominates the shareholder register, so absence of a visible specialist bet carries no information. RESEARCHED_UNKNOWN per playbook §6.4/§7.6.
No notable insiders tracked for this miner yet.
Reports, Presentations & Documents
Blackwater is already producing — the open question isn't 'will this become a mine', it's whether the ~$1.44B Phase 2 expansion (approved Dec 2025, targeting more than double throughput by 2028) gets built on time and on budget. Reserves support 15-16 years of full-scale operation with further extension potential.