JUNIORMETRICS

Anax Metals Limited

ANXMF·ANX·US$0.02 (AUD 0.029)·US$35.4M cap
Copperalso:Whim Creek Copper Project, Pilbara, Western Australia Map

Anax Metals is advancing the Whim Creek Copper Project in the Pilbara, Western Australia -- Definitive Feasibility Study complete, FEED work underway, with FID targeted for Q4 2026. Cash of ~A$12 million is a pro-forma figure, not yet audited, flagged as such; the Jetosea loan has been repaid, leaving the company debt-free.

Lifecycle Milestones

Grassroots
Resource Def.
PEA
PFS
FeasibilityCurrent
Permitting
Construction
Production
Prior Ownership & Infrastructure
Road Access3 of 4 checked, 1 in place

Not in place: mill, tailings facility. Not yet determined: grid power.

5.4/10
Weak track recordStrong track record
5.4/10 vs.
6.8/10
Thin runwayWell-capitalized
6.8/10 vs.
How this is calculated
5.2/10
Weaker depositStronger deposit
5.2/10 vs.
How this is calculated
6.3/10
Harder place to buildEasier place to build
6.3/10 vs.
What goes into it
  • Jurisdiction (40%)9/10

    Western Australia: Fraser PPI 2025 is 88.53 of 100 (rank 13 of 68), which maps to 9 on this site's scale. Pilbara, Western Australia — a top-tier mining jurisdiction.

  • Infrastructure (40%)4.3/10

    No confirmed mill, confirmed road access, and no confirmed tailings facility at Whim Creek Copper Project, Pilbara, Western Australia; grid power not yet researched, counted at a neutral 5/10 until established.

  • Nearby producing mine (20%)Not yet researched

    No producing mine within 50 km in our reference list (nearest listed: Wodgina (Mineral Resources Limited / Albemarle Corporation), 95 km). That list doesn't cover every mining district yet, so a longer distance isn't scored as remote.

5.9/10
Weaker profileStronger profile
5.9/10 vs.
Price Chart
$0.005$0.006$0.019$0.021$0.02AugDecAprJulOct222
Aug 12, 2025 – Oct 20, 2026
News
$0.02
+265.6%from low-36.4%from high
$0.0056$0.032
$35.4M
Far belowFar above
$35.4M vs. $28M peer median
Price (USD - Local)
US$0.02 (AUD 0.029)
Cash Position (USD)
$7.7M
Far belowFar above
$7.7M vs. $3.8M peer median
Debt (USD)
$2.1M
Far aboveFar below
$2.1M vs. $0 peer median
$29.7M
Far belowFar above
$29.7M vs. $25.1M peer median
1.7B
Far aboveFar below
1.7B vs. 171.1M peer median
Jurisdiction
Australia
96,661 t Cu
Feeds Deposit Quality score
Measured18,056 t Cu
Indicated78,605 t Cu
Inferrednot scored21,349 t Cu
Total resource118,010 t Cu
Far belowFar above
96.7K t vs. 1.1M t peer median
Compares M&I only — Inferred isn't compared or scored.
$307.75/t
M&I
Total resource (incl. Inferred)$252.07/t
Peer median $191.63/t
Far aboveFar below
$307.75/t vs. $369.18/t peer median
Cut-off: Whim Creek Cu: 0.40% Cu; Whim Creek Zn (where Cu<0.40%): 2.0% Zn; Mons Cupri/Salt Creek/Evelyn and Reserve cutoff basis: not located
Open pit and underground
10 yrs2026 study
Far belowFar above
10 yrs vs. 19 yrs peer median
$1.61/lb2026 study
$52.5M2026 study
Far aboveFar below
$52.5M vs. $587M peer median
13.3%
0%100%
13.3% vs. 9.9% peer median
95 kmfrom Mineral Resources Limited (50%) / Albemarle Corporation (50%)'s Wodgina
Outside typical bolt-on range
-$4.1M
Far belowFar above
-$4.1M vs. -$3.8M peer median
-$0.002
Far belowFar above
-$0.002 vs. -$0.018 peer median

Acquisition Susceptibility

How this is calculated
6.7/10
Unlikely bolt-onFits the takeout profile

A relative ranking of how closely this company matches the profile of juniors that have actually been acquired — not a probability, and not a reason to buy. Acquisitions are rare: only a few dozen significant deals happen a year across a universe of thousands of juniors, so even a high score here describes a long shot. The strongest signal in the research, a producer that already owns part of the company, is scored from its disclosed strategic shareholders. A producer that is a joint-venture or earn-in partner on the project, rather than a shareholder, isn't captured yet.

How this score is built

  • Disclosed pending deal
    Sub-score: Not scored

    No pending acquisition or merger disclosed (checked)

    Not scored: having no deal in flight isn't held against a company.

    Weight 26.25%
  • Producer's strategic stake
    Sub-score: Not scored

    No producer holds a disclosed stake on file (holder register researched) See holders

    Not scored: most juniors that do get bought had no prior toehold, so a missing stake says little either way.

    Weight 25%
  • Distance to a producing mine
    Sub-score:
    3.5/10

    Nearest producing mine: Wodgina (Mineral Resources Limited / Albemarle Corporation), 95 km

    10 next to a producing mine, 8 at 20 km, 5 at 50 km, 0 beyond 200 km.

    Weight 22.5% · 46% here
  • Lifecycle stage
    Sub-score:
    10/10

    Stage: Feasibility Study

    Feasibility and permitting score 10, where deals cluster, and production 5.5; earlier stages score less, down to 1 at grassroots.

    Weight 15% · 31% here
  • Jurisdiction
    Sub-score:
    9/10

    Australia: jurisdiction score 9/10

    Our jurisdiction score, used as is: higher means lower political and permitting risk.

    Weight 6.75% · 14% here
  • Commodity
    Sub-score:
    8/10

    Primary commodity: Copper

    Gold 10, copper 8, silver 5, nickel and uranium 4, others 2: most majors' deals are for gold.

    Weight 4.5% · 9% here

Weight is each input's share of the full score. “Here” is its share of this company's score: inputs that aren't scored are left out and the rest re-weighted, never counted as zero.

Overall Score Trend
-37.9% since 2026-08-01 · -37.9% from peak

Your Rankings

Community Sentiment
—SELLINGBUYING
CategoryCommunityYour Ranking
Overall— (0) 
Management— (0) 
Financials— (0) 
Jurisdiction— (0) 
Project Quality— (0) 

Management Team

Managing Director of Anax Metals Limited. A Chemical Engineer with 30 years in mining and project development, spanning operations design and corporate roles.

Chief Financial Officer of Anax Metals Limited (BCompt, CAANZ, GAICD). A Chartered Accountant who joined in 2020, overseeing corporate risk management and financial reporting. Previously CFO at Predictive Discovery Limited (ASX:PDI).

Chief Operating Officer of Anax Metals Limited (M.Eng, CPEng, FIEAust, MAICD). A mechanical engineer with over 20 years delivering major projects across the copper, coal, iron ore, gold and critical minerals sectors.

General Manager of Anax Metals Limited (BSc Hons Geology, PG Dip GIS, Grad Cert Mineral Economics, MAIG). Over 20 years' experience in project management, project development, resource geology and exploration across multiple commodities, including recent roles in project development and regulatory approvals for mining projects in Australia and the United States.

Environmental Manager of Anax Metals Limited (Bachelor of Environmental Science). Over 15 years' experience in environmental management across mining, oil and gas, construction and government sectors, with recent focus on environmental permitting of mining projects in Western Australia.

Company Secretary of Anax Metals Limited (Chartered Accountant). Principal at Automic Group, specialising in company secretarial services for public companies; also serves as Non-executive Director for Metalicity Limited and Company Secretary for multiple other ASX-listed entities.

Insiders, Investors & Smart Money

Notable shareholders and insiders whose involvement is worth knowing about, plus what we're seeing from institutional/large-investor activity.

Smart money
1/10

The largest outside holder here is a Hong Kong-listed commodities trading and processing company that only recently announced a pivot toward critical minerals, and its stake -- held since 2018 -- predates that pivot and sits below the level where this metric gives real credit either as a producer or a specialist fund. No other qualifying holder was found.

No notable insiders tracked for this miner yet.

Reports, Presentations & Documents

Technical Report Takeaways

Anax Metals holds 80% of the Whim Creek copper-zinc project in the Central Pilbara of Western Australia, which combines the Mons Cupri, Whim Creek, Evelyn and Salt Creek deposits. The February 2026 update of its definitive feasibility study, on a 100% basis, shows a pre-tax NPV7% of US$340.7M (AUD 501M) and a 98% pre-tax IRR, with A$91M of pre-production capital, a 14-month payback and an all-in sustaining cost of US$1.61/lb of copper net of by-products over a 10-year mine life. Ore reserves are 4.61 Mt at 1.36% copper, 2.31% zinc, 0.67% lead, 30 g/t silver and 0.27 g/t gold, and the project targets about 13,000 tonnes a year of copper-equivalent metal in concentrate over its first eight years. Front-end engineering design began on 27 July 2026, with WSP Global leading project management, toward a final investment decision targeted for the fourth quarter of 2026.