JUNIORMETRICS

Aura Energy Limited

AUEEF·AEE·US$0.051 (AUD 0.073)·US$52.2M cap
UraniumTiris Uranium Project, Mauritania Map

Aura Energy's flagship is the 85%-owned Tiris Uranium Project in Mauritania -- a low-capex, low-opex greenfield discovery per a 2021 DFS -- with the processing flowsheet recently finalized and a Final Investment Decision targeted by end of 2026. The company also holds the large Häggån polymetallic (vanadium) project in Sweden. Cash of only A$4.20 million against immaterial debt of A$183,925 -- a thin balance sheet for a pre-FID developer.

Notable vs. Peers

  • Jurisdiction risk score of 4/10 is meaningfully riskier than the peer average of 7.9/10.
  • Trading within 1% of its 52-week low — weak recent price momentum.

Lifecycle Milestones

Grassroots
Resource Def.
PEA
PFS
FeasibilityCurrent
Permitting
Construction
Production
Prior Ownership & Infrastructure
3 of 4 checked, 0 in place

Not in place: mill, tailings facility, grid power. Not yet determined: road access.

5.4/10
Weak track recordStrong track record
5.4/10 vs.
6.1/10
Thin runwayWell-capitalized
6.1/10 vs.
How this is calculated
5.9/10
Weaker depositStronger deposit
5.9/10 vs.
How this is calculated
3.2/10
Harder place to buildEasier place to build
3.2/10 vs.
What goes into it
  • Jurisdiction (40%)4/10

    Mauritania carries real infrastructure and logistics risk typical of a nascent mining jurisdiction, though it has avoided much of the political instability seen in neighboring Sahel states and hosts established iron-ore mining operations.

  • Infrastructure (40%)1.4/10

    No confirmed mill, no confirmed grid power, and no confirmed tailings facility at Tiris Uranium Project, Mauritania; road access not yet researched, counted at a neutral 5/10 until established.

  • Nearby producing mine (20%)Not yet researched

    No project coordinates on file yet, so distance to a producing mine can't be measured.

5.2/10
Weaker profileStronger profile
5.2/10 vs.
Price Chart
$0.109$0.116$0.085$0.071$0.051AugDecMarJulOct
Aug 12, 2025 – Oct 20, 2026
News
$0.051
+3.3%from low-73.7%from high
$0.05$0.19
See who ↓
2.3%
Low alignmentHigh alignment
2.3% vs.
See who ↓
30.5%
Low alignmentHigh alignment
30.5% vs.
$52.2M
Far belowFar above
$52.2M vs. $16.1M peer median
Price (USD - Local)
US$0.051 (AUD 0.073)
Cash Position (USD)
$11.1M
Far belowFar above
$11.1M vs. $6.4M peer median
Debt (USD)
Far aboveFar below
$0 vs. $0 peer median
$41.2M
Far belowFar above
$41.2M vs. $12.9M peer median
1B
Far aboveFar below
1B vs. 138.4M peer median
Jurisdiction
Mauritania
39,900,000 lb U₃O₈
Feeds Deposit Quality score
Far belowFar above
39.9M lb vs. 41.8M lb peer median
$1.03/lb
Far aboveFar below
$1.03/lb vs. $4.02/lb peer median
Cut-off: 100 ppm U3O8
Open pit
25 yrs2024 study
Far belowFar above
25 yrs vs. 15 yrs peer median
$35.70/lb U₃O₈2024 study
@8%$499M2024 study · uranium deck US$80.00 vs reference US$69.23/lb
Far belowFar above
$499M vs. $388M peer median
0.12x2024 study · uranium deck US$80.00 vs reference US$69.23/lb
Far aboveFar below
0.12x vs. 0.36x peer median
0.10x2024 study · uranium deck US$80.00 vs reference US$69.23/lb
Far aboveFar below
0.10x vs. 0.30x peer median
$230M2024 study
Far aboveFar below
$230M vs. $282M peer median
2.2xClears Durrett's 2:1 bar2024 study · uranium deck US$80.00 vs reference US$69.23/lb
Far belowFar above
2.2x vs. 1.4x peer median
$80.00/lb16% above reference ($69.23/lb)2024 study
39%Clears Durrett's 25% developer bar2024 study · uranium deck US$80.00 vs reference US$69.23/lb
Far belowFar above
39% vs. 29% peer median
2.3%
0%100%
2.3% vs. 3% peer median
30.5%
0%100%
30.5% vs. 10% peer median
-$10.8M
Far belowFar above
-$10.8M vs. -$5.4M peer median
-$0.011
Far belowFar above
-$0.011 vs. -$0.024 peer median

Acquisition Susceptibility

How this is calculated
7.4/10
Unlikely bolt-onFits the takeout profile

A relative ranking of how closely this company matches the profile of juniors that have actually been acquired — not a probability, and not a reason to buy. Acquisitions are rare: only a few dozen significant deals happen a year across a universe of thousands of juniors, so even a high score here describes a long shot. The strongest signal in the research, a producer that already owns part of the company, is scored from its disclosed strategic shareholders. A producer that is a joint-venture or earn-in partner on the project, rather than a shareholder, isn't captured yet.

How this score is built

  • Disclosed pending deal
    Sub-score: Not scored

    A disclosed corporate action (not an acquisition or merger)

    A corporate action of this kind says nothing about takeover susceptibility, so it isn't scored.

    Weight 26.25%
  • Producer's strategic stake
    Sub-score: Not scored

    No producer holds a disclosed stake on file (holder register researched) See holders

    Not scored: most juniors that do get bought had no prior toehold, so a missing stake says little either way.

    Weight 25%
  • Distance to a producing mine
    Sub-score: Not yet researched

    Distance not yet researched: no project coordinates on file

    Distance can't be measured without coordinates, so excluded rather than counted as far.

    Weight 22.5%
  • Lifecycle stage
    Sub-score:
    10/10

    Stage: Feasibility Study

    Feasibility and permitting score 10, where deals cluster, and production 5.5; earlier stages score less, down to 1 at grassroots.

    Weight 15% · 57% here
  • Jurisdiction
    Sub-score:
    4/10

    Mauritania: jurisdiction score 4/10

    Our jurisdiction score, used as is: higher means lower political and permitting risk.

    Weight 6.75% · 26% here
  • Commodity
    Sub-score:
    4/10

    Primary commodity: Uranium

    Gold 10, copper 8, silver 5, nickel and uranium 4, others 2: most majors' deals are for gold.

    Weight 4.5% · 17% here

Weight is each input's share of the full score. “Here” is its share of this company's score: inputs that aren't scored are left out and the rest re-weighted, never counted as zero.

Overall Score Trend
+57.6% since 2026-08-04 · -27.8% from peak

Your Rankings

Community Sentiment
—SELLINGBUYING
CategoryCommunityYour Ranking
Overall— (0) 
Management— (0) 
Financials— (0) 
Jurisdiction— (0) 
Project Quality— (0) 

Management Team

Executive Chair of Aura Energy Limited. Brings significant expertise in mining mergers and acquisitions, having served as Head of Business Development and Strategy at Rio Tinto, where he managed the company's asset and commodity portfolio and had daily management responsibility for the BHP takeover proposal. Also served as Chief Financial Officer of Rio Tinto Iron Ore, as a member of the Executive Committee at Anglo American, and led acquisitions for Robert Friedland's company HPX.

Chief Health Safety and Environmental Executive of Aura Energy Limited. Over 25 years of corporate and operational experience managing environmental, occupational health and safety, social development and people management portfolios across the Australian and African mining industries. Most recently oversaw global support services for the Byrnecut Group's mining consultancy subsidiary; previously Group Sustainability Manager for Perseus Mining, Environmental Manager for Mineral Deposits Limited's Sabodala Gold Mine in Senegal and HSE Manager for Anvil Mining in the Democratic Republic of the Congo.

Chief Development Officer of Aura Energy Limited, appointed to build momentum towards expansion of the Tiris Resource and preparation for uranium production. Has worked with Aura for over 10 years and held the role of Aura's Principal Metallurgist since 2018, responsible for delivering the Tiris Uranium Scoping and Definitive Feasibility Studies and the Haggan Uranium Scoping Study. Contributes over 20 years of experience in geometallurgy, mineral processing and hydrometallurgy across a wide range of commodities.

General Manager Operations for Aura Energy Limited's Tiris Uranium Project, overseeing project execution and mine operations. A Mauritanian national and experienced mining executive and engineer with a background in mine development, operations and management across Africa. Previously General Manager Operations at Leo Lithium's Goulamina Lithium Mine in Mali, where he led the mine's development, operational readiness and production activities, and before that held executive roles at Kinross Gold's Tasiast Gold Mine in Mauritania and Teranga Gold's Sabodala Gold Mine in Senegal.

Company Secretary of Aura Energy Limited. Corporate and finance executive with more than 20 years' experience in Australia and internationally, having held senior corporate governance and compliance roles spanning company secretarial services, statutory and regulatory compliance, and board and committee reporting across ASX-listed, public and private companies. Fellow of the Governance Institute of Australia, Member of CPA Australia, and holder of a CPA Australia Public Practice Certificate.

Country Manager Mauritania for Aura Energy Limited and Director General of Tiris Ressources SA, Aura's 85%-owned Mauritanian subsidiary overseeing the Tiris Uranium Project, since 1 November 2024. Spent a decade at the United Nations as Director of the Economic Development and Integration Division at the Economic and Social Commission for Western Asia in Lebanon, and was General Manager of External Relations for Rio Tinto's Simandou iron ore project in Guinea from 2011 to 2014. Served as Mauritania's Minister of Petroleum and Mines from 2007 to 2008, the period when uranium was first discovered at Tiris by Aura.

Commercial Director of Aura Energy Limited. A 30-year career in the metals and mining industry spanning international commercial, operational and project roles, including over 20 years with the Rio Tinto Group where he managed uranium marketing across Europe and North America, led Rio Tinto's marine business in Singapore, served as Head of Investor Relations and oversaw a major mergers and acquisitions program. Most recently Managing Director of the Simandou project in Guinea, Africa's largest mining project, and previously spent two years leading investment banking operations for ICBC Standard Bank in London.

Project Director for Aura Energy Limited's Tiris Project. Extractive Metallurgist and project management professional with over 20 years of experience in mining operations management, engineering, procurement and construction management, and project ownership roles across various commodities in diverse African settings. Previously held greenfields and brownfields execution leadership roles on West African projects including Alufer Bel Air Bauxite, Dynamic Bon Ami Bauxite and LMC Marampa Iron Ore.

Insiders, Investors & Smart Money

Notable shareholders and insiders whose involvement is worth knowing about, plus what we're seeing from institutional/large-investor activity.

Smart money
1/10

Checked and little turned up at the parent-company level, though three real named holders are on the register: Macquarie Group, Ltd. at 14% (a large bank name that reads as a broker/custody line rather than a discretionary position), The Lind Partners, LLC at 8.4% (a structured-equity/PIPE financier rather than a conventional equity picker), and Asean Investment Management at 8.1% (a generalist Asia-focused value fund with no resource-sector mandate) -- none of the three reads as a confirmed resource-specialist conviction bet. Director Philip Mitchell acquired 1,704,596 shares at $0.105 in June 2026, and a January 2026 investment set a C$50 million valuation on the Haggan project in Sweden — but that was struck at the subsidiary level, not in Aura Energy itself, and the investor is not named in accessible sources. A holder ceased to be substantial in July 2026. No producer, utility, or dedicated resource-specialist fund is confirmed on the register, and no institutional ownership figure is available.

No notable insiders tracked for this miner yet.

Reports, Presentations & Documents

Technical Report Takeaways

Aura Energy holds 85% of the Tiris uranium project in Mauritania and also owns the Häggån polymetallic project in Sweden, whose planned transfer into SIU Metals was deferred in March 2026 because of Swedish regulatory uncertainty. Tiris has measured and indicated resources of 39,900,000 lb of U3O8 (83 Mt at 219 ppm) within a 91.3 Mlb global resource. The September 2024 updated production target shows a post-tax NPV8% of US$499M (AUD 734M) and a 39% IRR at US$80/lb U3O8, with capital of US$230M, a 25-year mine life and an all-in sustaining cost of US$35.7/lb. In 2026 Aura finalised the Tiris processing flowsheet and signed a non-binding memorandum of understanding with a major international nuclear utility covering potential equity investment, offtake and technical collaboration, with a final investment decision targeted by the end of 2026.