Anglo Asian Mining plc
Anglo Asian Mining produces gold, copper and silver from its Gedabek mine and the newly ramped-up Demirli copper-gold mine in western Azerbaijan under Production Sharing Agreements with the Azerbaijani state; Q1 2026 copper output jumped to 3,711 tonnes with gold roughly stable at 6,062 ounces, while cash rose to $37.2 million (from $30.2 million) and debt fell to $19.5 million (from $27.9 million) at March 31, 2026. The company delivered record first-half 2026 production as Demirli's ramp-up accelerated and reinstated its dividend.
Notable vs. Peers
- Jurisdiction risk score of 5/10 is meaningfully riskier than the peer average of 7.6/10.
- Trading within 6% of its 52-week high — strong recent price momentum.
Lifecycle Milestones
Construction Milestones
5 of 5 reached- Aug 1997 · Production Sharing Agreement (PSA) signed with the Government of Azerbaijan, granting Anglo Asian mining rights over the Gedabek and other contract areas -- the PSA is this jurisdiction's functional equivalent of a mining permit. · Source
- Reached — date not disclosed · Task #922: written as a real, undated MinerConstructionMilestone row (achievedDate intentionally null -- the milestone genuinely occurred, only its date is unknown; see the model's own doc comment in schema.prisma). Anglo Asian Mining's Gedabek mine construction demonstrably occurred: PERMIT_GRANTED is on file at 1997-08-20 (the original PSA) and CONSTRUCTION_START at 2008-07-01. A construction decision necessarily fell between those two dates -- consolidating this miner's own constructionMilestone:CONSTRUCTION_DECISION MetricStatus research (Task #317 wave 8, Aug 2026): an SRK Consulting resource estimate (2007) and environmental baseline/impact studies (mid-2007) are on record ahead of the 2008 construction start, but no discrete board/FID announcement was found despite multiple targeted searches of Anglo Asian Mining's RNS archive for that period. Recorded as reached-but-undated rather than continuing to leave the milestone entirely unrecorded.
- Jul 2008 · Design and construction of the Gedabek heap-leach/SART processing facility started in July 2008, per the peer-reviewed account of the project (Monhemius et al., 'Flotation and Leaching at Anglo Asian Mining's Gedabek Gold and Copper Mine in Azerbaijan'). Exact day within July not given. · Source
- Reached — date not disclosed · Anglo Asian poured its first gold at Gedabek in May 2009, the first gold/copper producer in Azerbaijan in modern times. Exact day not found in available primary sourcing. · Source
- Reached — date not disclosed · Genuinely reached, but no single company-wide commercial-production date exists: Anglo Asian Mining is a multi-mine operator in Azerbaijan whose production base has changed materially over time -- Gedabek gold production began 2009, and two new mines (Gilar, Demirli) started production in 2025, with three more (Xarxar, Garadag, Zafar) planned 2027-2030. Per its FY2025 Full Year Results (published 2026-05-26), the company reported 25,061 oz gold and 7,915 tonnes copper produced for year ended 31 Dec 2025, plus formal 2026 production guidance (20,000-25,000t copper, 28,000-33,000oz gold) -- confirming active, ongoing commercial copper and gold production. Given multiple mines with distinct commissioning dates and continuing new-mine additions, no single company-wide date applies. This row was missing entirely prior to 2026-08-21 -- a genuine data gap, not a stage error; Miner.stage was already correctly PRODUCTION. · Source
Milestones are recorded only from a company's own dated disclosure. A milestone with no date shown is one we can confirm was reached but for which no date was disclosed — we don't estimate one. "Not yet reached" means exactly that, not that a date is missing. An "Expected" line likewise only ever reflects the company's own guidance (e.g. a study or permit decision targeted for a stated quarter) — most not-yet-reached milestones have none, and that absence means no such guidance has been disclosed, not that one is overdue.
A relative ranking of how closely this company matches the profile of juniors that have actually been acquired — not a probability, and not a reason to buy. Acquisitions are rare: only a few dozen significant deals happen a year across a universe of thousands of juniors, so even a high score here describes a long shot. The strongest signal the underlying research identifies — whether a major already holds a JV, earn-in, or 5–19.9% strategic stake — isn't tracked yet and is absent from this score.
Your Rankings
Management Team
President and Chief Executive Officer of Anglo Asian Mining plc; the company's own filings print his full name as Mohammad Reza Vaziri. Holds a law degree from the National University of Iran and previously held senior positions in the pre-revolutionary Iranian government, including head of the foreign relations office at the Ministry of the Imperial Court of Iran. Relocated to the US in 1980. Has been active in business in the Republic of Azerbaijan since shortly after its independence, and led R.V. Investment Group Services LLC (now an Anglo Asian subsidiary) in signing the company's original Production Sharing Agreement with the Government of Azerbaijan.
Chief Financial Officer and Company Secretary of Anglo Asian Mining plc. UK chartered accountant with over 45 years of accountancy and financial management experience across multiple regions, including over 20 years in the gold mining industry in Russia and the former Soviet Union. Career: Regional CFO, Kinross Gold Corp. Russia Region (already tracked in this DB, K, 2009-2013); CFO, Hambledon Mining plc and Bakyrchik Gold plc (Kazakhstan gold companies).
Chief Operating Officer of Anglo Asian Mining plc. Has worked in the mining industry since 1985, with experience constructing processing facilities and managing mining operations. Previously chief process engineer at Iran's national lead and zinc company and founder of an engineering firm. Holds an MSc in non-ferrous extractive metallurgy.
Vice President of Finance and Commercial Operations of Anglo Asian Mining plc. Joined the company in July 2013 as Financial Controller. Previously worked in EY Baku's audit practice. Holds degrees in Finance and an ACCA diploma, plus an MBA from Warwick Business School (2021).
Vice President of Anglo Asian Mining plc. UK chartered geologist with over 30 years of experience across multiple regions, with project management expertise spanning exploration, construction and production phases. Holds a PhD in structural controls on mineralisation plus relevant MSc and BSc degrees.
Chief Business Development Officer of Anglo Asian Mining plc. Former co-founder and CEO of a technology startup and director of business development at an international technology company. Holds a BA in international business and an MSc in international management from King's College London.
Vice President of Procurement, HR and IT of Anglo Asian Mining plc. Brings more than 35 years of international experience with expertise in technology services and leadership. Previously served as Vice President of Sales for a U.S.-based IoT company managing MENA, CIS and Turkey operations.
Insiders, Investors & Smart Money
Notable shareholders and insiders whose involvement is worth knowing about, plus what we're seeing from institutional/large-investor activity.
We checked and found no outside investor of note. The company's own shareholder disclosure, updated 1 July 2026, shows the register is essentially its own people: president and chief executive Reza Vaziri holds 28.65%, Sununu Holdings 8.01% and Governor John Sununu a further 1.37%, with 40.07% of the company not in public hands. No mining company holds a stake, no specialist resource fund appears, and institutional ownership is only 4.3%. A 1 here means checked and nothing found, not that anything is wrong with the company.
No notable insiders tracked for this miner yet.
Reports, Presentations & Documents
No consolidated or per-deposit NPV/IRR/mine-life economic study found across Anglo Asian's PSA contract areas as of this pass. FY2025 Full Year Results (as of 1 Jan 2026) report JORC Measured+Indicated resources per deposit only: Gedabek open pit 3.24 Mt (27.5 koz Au + 14.7 kt Cu); Gilar 5.32 Mt (212.4 koz Au + 43.5 kt Cu, updated for depletion); Demirli (non-JORC internal estimate) 56.35 Mt containing 229.6 kt Cu; Xarxar (JORC maiden, Jan 2024) 24.9 Mt Indicated+Inferred containing 119.1 kt Cu; Garadag (JORC maiden, Jul 2024) 284.9 Mt Indicated+Inferred containing 896.9 kt Cu. No dcfNpvUsd/irrPct/mineLifeYears figures accompany any of these. Gedabek PSA mining/exploration rights run to March 2027, extendable a further 5 years -- a license term, not a study-derived mine life, so not written to mineLifeYears. Demirli (copper open pit + flotation plant, first production Jun 2025) forecast ~4kt Cu-in-concentrate 2025 rising to ~15kt/yr from 2026. Recheck if a CPR (Competent Person's Report) with formal economics is ever commissioned -- none identified to date.
Anglo Asian Mining's 2025 Full Year Results (26 May 2026): revenue of $122.8M (up from $39.6M in 2024) on Gilar and Demirli commissioning; 2026 guidance of 20-25kt copper and 28-33koz gold.